🧪 TEST MODE ACTIVE Use test card: 4242 4242 4242 4242

Federal agency decisions, searchable in plain English.

Workplace-safety cases from the Occupational Safety and Health Review Commission (OSHRC) and mine-safety cases from the Federal Mine Safety and Health Review Commission (FMSHRC), each with a plain-English summary, the standards it cites, and whether it counts as precedent. More agencies are coming.

5,577 decisions and counting · Latest decision July 17, 2026
38 decisions 30 U.S.C. § 820(k)

No decisions match these filters

Try a different search term or clear the filters.

COMM

Secretary of Labor on behalf of Nicholas Rubio v. Castle Mountain Venture

Secretary of Labor on behalf of Nicholas Rubio v. Castle Mountain Venture (FMSHRC WEST 2024-0283): Blanket settlement seal vacated

The Secretary and Castle Mountain settled a miner discrimination complaint, and the operator asked to seal the entire settlement based on an unspecified business interest and a separate confidentiality agreement with the miner. The Administrative Law Judge granted that request over the Secretary's…

June 11, 2026
Remanded
COMM

Secretary of Labor v. Rulon Harper Construction, Inc.

Secretary of Labor v. Rulon Harper Construction, Inc. (FMSHRC WEST 2022-0249): Unsupported settlement reductions rejected

The Secretary and Rulon proposed settlements covering ten citations and orders, with large reductions in gravity, negligence, significant-and-substantial designations, and penalties. The proposed total penalties would have fallen from $22,944 to $3,936 in one docket and from $22,134 to $7,227 in…

March 18, 2026
Remanded
ALJ

Secretary of Labor v. Morton Salt, Inc.

Secretary of Labor v. Morton Salt, Inc. (FMSHRC CENT 2022-0248): Ground-control and fire-boss citations upheld

MSHA issued 23 citations at Morton Salt's Weeks Island underground salt mine, a Class II-A domal salt mine with hazards from loose salt scales and unpredictable methane releases. The parties settled 17 citations for $38,320, including one vacatur and several reductions in gravity, negligence, and…

July 30, 2025 ·Thomas P. McCarthy
Mixed result
COMM

Secretary of Labor v. Genesis Alkali, LLC

Secretary of Labor v. Genesis Alkali, LLC (FMSHRC WEST 2022-0189): Unsupported settlements remained denied

A judge rejected proposed settlements covering 34 citations because major modifications and vacaturs lacked enough factual support. One proposal would have reduced a ventilation citation from S&S and fatal gravity to non-S&S and lost-workdays gravity, with a penalty cut from $12,007 to $729…

March 14, 2025
Remanded
COMM

Secretary of Labor v. Bluestone Oil Corporation

Secretary of Labor v. Bluestone Oil Corporation (FMSHRC WEVA 2022-0176): Unsupported S&S removals rejected

Bluestone Oil’s proposed settlement covered twenty-four citations and would have reduced total penalties from $51,023 to $30,500. It also would have removed the significant-and-substantial designations from two citations without providing a factual justification. The Administrative Law Judge denied…

January 29, 2025
Remanded
COMM

Secretary of Labor v. Greenbrier Minerals, LLC

Secretary of Labor v. Greenbrier Minerals, LLC (FMSHRC WEVA 2022-0403): Unsupported S&S removal rejected

Greenbrier and the Secretary proposed settling six citations, including removal of the significant-and-substantial designation from a citation alleging an inoperable emergency stop switch on a feeder breaker. That change would also have reduced the proposed penalty from $1,593 to $302. The…

November 5, 2024
Remanded
COMM

Secretary of Labor v. County Line Stone Co., Inc., Consol Pennsylvania Coal Company, LLC, and Ramaco Resources, LLC

Secretary of Labor v. County Line Stone Co., Inc., Consol Pennsylvania Coal Company, LLC, and Ramaco Resources, LLC (FMSHRC WEVA 2022-0260): Settlement vacaturs remained reviewable

These three consolidated cases involved settlements that proposed vacating contested citations while resolving other citations in the same agreements. The Secretary claimed unreviewable discretion to vacate the citations and declined to assure the ALJ that the proposed vacaturs were independent of…

November 1, 2024
Remanded
COMM

Secretary of Labor v. Knight Hawk Coal, LLC

Secretary of Labor v. Knight Hawk Coal, LLC (FMSHRC LAKE 2021-0160): Unsupported S&S removal rejected

Knight Hawk and the Secretary proposed settling three citations by removing the significant-and-substantial designation from two and reducing total penalties from $7,960 to $4,590. The ALJ accepted the explanation for one removal but found inadequate support for removing S&S from a roof-control…

August 30, 2024
Remanded
COMM

Secretary of Labor v. Crimson Oak Grove Resources, LLC and Secretary of Labor v. River City Stone-DIV/Mathy Construction Co. and Secretary of Labor v. Holcim (US) Inc. and Secretary of Labor v. Greenbrier Minerals, LLC

Secretary of Labor v. Crimson Oak Grove Resources, LLC and consolidated cases (FMSHRC LAKE 2021-0145): Settlement citation vacaturs required Commission review

These five cases involved proposed settlements or dismissals in which the Secretary would vacate citations while operators accepted or withdrew contests to other citations and waived potential attorney-fee claims. The ALJ required either assurance that the vacaturs were independent of the other…

August 30, 2024
Remanded
COMM

Secretary of Labor v. CONSOL Mining Company, LLC

Secretary of Labor v. CONSOL Mining Company, LLC (FMSHRC WEVA 2023-0141): Judge could not strike settlement arguments

A Judge denied a settlement motion without reviewing the agreement and struck the Secretary's argument and supporting Commission cases. The Commission held that presenting those authorities did not violate its procedural rules and that striking them could prevent the Secretary from preserving…

August 31, 2023
Remanded
COMM

Secretary of Labor v. Perry County Resources, LLC

Secretary of Labor v. Perry County Resources, LLC (FMSHRC KENT 2022-0024): Unrelated abatement order was not required for settlement

Perry County Resources and the Secretary proposed settling four citations involving roof support, escapeways, a lifeline, and equipment guarding. A Judge denied approval because the Secretary would not provide a separate failure-to-abate order associated with a citation Perry accepted as written…

July 20, 2023
Settled
ALJ

Secretary of Labor v. Nufac Mining Company, Inc.

Secretary of Labor v. Nufac Mining Company (FMSHRC WEVA 2023-0149): Five-citation settlement approved with installment plan

The parties settled five citations issued to Nufac Mining's No. 57 Mine. Three penalties were reduced by roughly half, while two remained unchanged, lowering the table total from $19,574 to $11,684. The judge noted substantial older unpaid penalties and prior noncompliance with an installment plan…

July 7, 2023 ·John T. Sullivan
Settled
ALJ

Secretary of Labor v. Consol Mining Company, LLC

Secretary of Labor v. Consol Mining Company (FMSHRC WEVA 2023-0141): Continuance granted and settlement question certified

Consol Mining asked to continue a scheduled hearing because of witness and discovery issues and pending disputes over a proposed partial settlement. The judge granted the continuance and deferred the Secretary's request to separate the unsettled citations from those proposed for settlement. He…

July 7, 2023 ·Michael G. Young
Procedural
ALJ

Secretary of Labor v. Consol Mining Company, LLC

Secretary of Labor v. Consol Mining Company, LLC (FMSHRC WEVA 2023-0141): Partial settlement denied and authorities stricken

The Secretary sought approval of a partial settlement that removed S&S designations and cited Mechanicsville Concrete and American Aggregates of Michigan as supporting authority. Judge Young concluded that those decisions did not support the proposition for which they were repeatedly cited and that…

May 11, 2023 ·Michael G. Young
Procedural
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0555): Settlement initially denied over missing withdrawal orders

The proposed settlement covered citations involving a CAT loader with nine defects and a CAT truck with nineteen defects, both under a standard requiring safety defects to be corrected before equipment use. Inspectors repeatedly extended abatement deadlines, and section 104(b) withdrawal orders…

March 1, 2023 ·William B. Moran
Procedural
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0516): Fourteen-citation settlement approved

The settlement resolved fourteen citations at Appalachian Resource's Grapevine South Surface Mine and reduced penalties from $18,550 to $11,000. Three associated section 104(b) withdrawal orders were vacated, three citations were changed from low to no negligence, and one citation was changed from…

February 9, 2023 ·John T. Sullivan
Settled
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0554): Haul-truck railing settlement approved

MSHA cited two hazards on the same haul truck at Appalachian Resource West Virginia’s Tug Fork Preparation Plant. One citation involved a loose railing at the top of an eight-to-nine-foot ladder, and the other involved the equipment operator’s failure to wear a seat belt. The settlement changed the…

January 24, 2023 ·William B. Moran
Settled
ALJ

Secretary of Labor v. Iron Cumberland, LLC

Secretary of Labor v. Iron Cumberland, LLC (FMSHRC PENN 2022-0084): Combustible-accumulation settlement approved

The settlement covered two specially assessed section 104(d)(2) orders for extensive combustible-material accumulations along the Cumberland Mine’s 6 Mains West No. 1 belt. The first order identified ten locations, including material contacting moving rollers and one smoking accumulation; the…

January 17, 2023 ·William B. Moran
Settled
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0428): Blasting, training, and equipment settlement approved

This settlement resolved sixteen citations that had been moved from the related WEVA 2022-0301 docket. One equipment citation remained at $4,624 after ten defects were found on a haul truck and eight remained uncorrected thirteen days later, prompting a section 104(b) order. Three other citations…

January 11, 2023 ·William B. Moran
Settled
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0301): Equipment and ground-control settlement approved

The settlement resolved seventeen citations at Appalachian Resource West Virginia’s Grapevine South Surface Mine after sixteen other citations were moved to a separate docket. Seven equipment citations had led to section 104(b) failure-to-abate orders involving defects such as oil leaks, damaged…

January 11, 2023 ·William B. Moran
Settled
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0428): Failure-to-abate order disclosure certified

This reallocated docket included a haul-truck citation under 30 C.F.R. § 77.1606(c) for ten safety defects. The inspector granted additional time for repairs, but the record then showed that a section 104(b) failure-to-abate order had been issued. The Secretary sought settlement approval at the…

December 13, 2022 ·William B. Moran
Procedural
ALJ

Secretary of Labor v. Appalachian Resource West Virginia, LLC

Secretary of Labor v. Appalachian Resource West Virginia, LLC (FMSHRC WEVA 2022-0301): Failure-to-abate disclosure question certified

The Secretary sought approval of a settlement covering numerous mobile-equipment citations but refused the Judge’s repeated requests for seven associated section 104(b) failure-to-abate orders. Counsel for Appalachian Resource West Virginia confirmed the orders and supplied information that the…

December 13, 2022 ·William B. Moran
Procedural
COMM

Secretary of Labor v. Bluestone Oil Corporation

Secretary of Labor v. Bluestone Oil Corporation (FMSHRC WEVA 2022-0176): S&S removal authority accepted for review

A judge denied a proposed settlement because the Secretary did not provide factual support for removing the significant and substantial designations from two citations. The judge certified the denial for interlocutory review. The Commission granted review to decide whether the Secretary has…

December 7, 2022
Procedural
COMM

Secretary of Labor v. Greenbrier Minerals, LLC

Secretary of Labor v. Greenbrier Minerals, LLC (FMSHRC WEVA 2022-0403): S&S removal authority accepted for review

A judge denied a proposed settlement because the Secretary did not provide enough information to support removing a significant and substantial designation. The judge certified the denial for interlocutory review. The Commission granted review to decide whether the Secretary has unreviewable…

December 6, 2022
Procedural
ALJ

Secretary of Labor v. Rulon Harper Construction, Inc.

Secretary of Labor v. Rulon Harper Construction, Inc. (FMSHRC WEST 2022-0250): Berm and parking-brake settlement reductions rejected

Rulon Harper Construction operated a sand-and-gravel pit near Salt Lake City where MSHA issued eight citations, including four for missing or deficient berms and one for a parking brake that would not hold a truck on a grade. The parties proposed reducing the combined penalties from $22,134 to…

November 2, 2022 ·Margaret A. Miller
Procedural
ALJ

Secretary of Labor v. Rulon Harper Construction, Inc.

Secretary of Labor v. Rulon Harper Construction, Inc. (FMSHRC WEST 2022-0249): Proposed 83 percent penalty reduction rejected for thin factual support

Rulon Harper Construction operated a sand-and-gravel pit near Salt Lake City where MSHA cited an unchocked truck on a grade and an inadequate workplace examination that missed 20 violative conditions. The parties proposed reducing the combined penalties from $22,944 to $3,936, removing both…

November 2, 2022 ·Margaret A. Miller
Procedural
ALJ

Secretary of Labor v. Genesis Alkali, LLC

Secretary of Labor v. Genesis Alkali, LLC (FMSHRC WEST 2022-0267): Thirteen-cent-on-the-dollar settlement rejected

Genesis Alkali operated a large Wyoming trona mine where two dockets covered 25 citations involving unsecured raised loads, missing berms, obstructed passageways, and other alleged hazards. The parties proposed reducing the combined penalties from $120,909 to $15,424, vacating several citations…

October 18, 2022 ·Margaret A. Miller
Procedural
ALJ

Secretary of Labor v. Genesis Alkali, LLC

Secretary of Labor v. Genesis Alkali, LLC (FMSHRC WEST 2022-0189): Hydrogen-sulfide ventilation settlement rejected

Genesis Alkali operated a Wyoming trona mine where nine citations carried proposed penalties totaling $34,483. The parties sought to reduce that total to $9,494, including cutting a ventilation citation from $12,007 to $729 and removing its significant-and-substantial designation. The citation…

October 18, 2022 ·Margaret A. Miller
Procedural
ALJ

Secretary of Labor v. Covol Fuels No. 3 LLC

Secretary of Labor v. Covol Fuels No. 3 LLC (FMSHRC KENT 2022-0040): Massive roof-fall penalty reduction rejected

MSHA cited Covol Fuels after a roof collapse in the primary escapeway measured about 20 feet wide, 35 feet long, and 9 feet thick. The citation treated the event as having occurred, with fatal gravity and an S&S designation, and proposed a $3,546 penalty. The parties sought to change likelihood to…

August 17, 2022 ·William B. Moran
Procedural
COMM

Secretary of Labor v. County Line Stone Co., Inc., et al.

Secretary of Labor v. County Line Stone Co., Inc., et al. (FMSHRC YORK 2022-0003): Settlement vacatur issue accepted for interlocutory review

The Secretary sought approval of settlements involving County Line Stone, Consol Pennsylvania Coal, and Ramaco Resources, with each proposal calling for at least one citation to be vacated. The judge asked the Secretary to confirm that each vacatur was independent of the compromise of other…

August 5, 2022
Procedural
COMM

Secretary of Labor v. County Line Stone Co., Inc., et al.

Secretary of Labor v. County Line Stone Co., Inc., et al. (FMSHRC YORK 2022-0003): Premature settlement-review petition denied

The Secretary sought interlocutory review in three cases after the judge questioned settlement proposals that included vacating citations. The judge had asked whether each vacatur was independent of the compromise of other citations, and the Secretary instead sought certification of the legal issue…

July 29, 2022
Procedural
ALJ

Secretary of Labor v. Perry County Resources

Secretary of Labor v. Perry County Resources (FMSHRC KENT 2022-0024): Secretary ordered to disclose missing abatement order

Perry County Resources and the Secretary proposed resolving four citations with a total penalty reduction from $1,470 to $1,204. The record showed that MSHA had issued a section 104(b) failure-to-abate order connected to an admitted roof-support citation, but the order and related documents were…

June 22, 2022 ·William B. Moran
Procedural
ALJ

Secretary of Labor v. Cactus Canyon Quarries, Inc.

Secretary of Labor v. Cactus Canyon Quarries, Inc. (FMSHRC CENT 2022-0010 M): Contest filing triggered Commission jurisdiction

Cactus Canyon Quarries appealed an order that gave the Secretary more time to file a penalty petition and argued that the Commission lacked jurisdiction before that petition was filed. Judge Richard W. Manning rejected that position and held that Commission jurisdiction attached when Cactus Canyon…

April 27, 2022 ·Richard W. Manning
Procedural
COMM

Secretary of Labor v. Knight Hawk Coal, LLC

Secretary of Labor v. Knight Hawk Coal, LLC (FMSHRC LAKE 2021-0160): S&S removal authority accepted for review

A judge denied a proposed settlement because the Secretary did not provide enough information to support removing a significant and substantial designation. The judge certified the denial for interlocutory review. The Commission granted review to decide whether the Secretary has unreviewable…

April 7, 2022
Procedural
ALJ

Secretary of Labor v. Knight Hawk Coal, LLC

Secretary of Labor v. Knight Hawk Coal, LLC (FMSHRC LAKE 2021-0160): S&S settlement question certified for review

Knight Hawk Coal and the Secretary proposed settling three citations by removing the significant and substantial designation from two and reducing total penalties from $7,960 to $4,590. Judge Michael G. Young accepted the explanation for one S&S removal but found insufficient factual support for…

January 21, 2022 ·Michael G. Young
Procedural
ALJ

Secretary of Labor v. Greenbrier Minerals, LLC

Secretary of Labor v. Greenbrier Minerals, LLC (FMSHRC WEVA 2021-0294): Citation-vacatur question certified for review

Greenbrier Minerals and the Secretary proposed settling six citations by vacating two, leaving four unchanged, and reducing total penalties from $1,960 to $1,213. The Secretary relied only on asserted prosecutorial discretion as the explanation for the vacaturs. Judge Michael G. Young held that…

November 19, 2021 ·Michael G. Young
Procedural
COMM

Secretary of Labor v. Hopedale Mining, LLC

Secretary of Labor v. Hopedale Mining, LLC (FMSHRC LAKE 2019-0149): Four-citation ventilation settlement approved

MSHA cited four significant-and-substantial failures to follow Hopedale Mining's ventilation plan, including inadequate airflow, a misplaced curtain, plugged water sprays, and insufficient roof-bolter vacuum. The parties proposed reducing the total penalties from $18,093 to $3,339 after lowering…

August 28, 2020
Settled
COMM

Secretary of Labor v. American Aggregates of Michigan, Inc.

Secretary of Labor v. American Aggregates of Michigan, Inc. (FMSHRC LAKE 2018-0340): New-miner training settlement approved

MSHA issued a withdrawal order after a driller's helper had not completed every topic required during the first four hours of new-miner training. The parties agreed to keep the violation but remove the significant-and-substantial designation, reduce negligence and gravity, and lower the proposed…

August 28, 2020
Settled

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.