NY TSB-A-87(6)R Real Property Transfer Gains Tax (repealed) 1987-04-23

My partnership is constructing an office building at 33 Whitehall Street, with the base building completed in a first stage and individual floors built out for tenants in a second, ongoing stage running into 1989. Can I allocate construction-period interest, real property taxes, insurance, security, and specifically identified indirect project costs to each floor by square footage, for gains-tax original-purchase-price purposes?

Short answer: Yes, as long as it's an equitable allocation. Broad Financial Center Partners, a New York partnership building an office building at 33 Whitehall Street in lower Manhattan, financed first by Manufacturers Hanover Trust Company and then Aetna Life Insurance Company, completed the building's foundation, shell, core, and lobby in a first stage by December 1986, while a second stage of tenant-specific floor build-outs was expected to begin in April 1987 and run through late 1989. Because construction wasn't finished all at once, the Partnership proposed allocating construction-period interest, real property taxes, insurance, security, and specifically identified indirect project costs to each floor in proportion to that floor's share of the building's total square footage, through the date each floor's own construction ended. The Department accepted this method as proper, as long as it results in an equitable allocation, while noting that costs stop accruing during any suspension of construction activity between stages.

Apply this to your situation

This page answers the general question as of 1987. Ezel answers yours, under current New York tax law, with citations.

Currency note: this ruling is from 1987
Subsequent statutory amendments, regulation changes, court decisions, or later rulings may have changed the analysis. Treat this page as historical context, not current tax advice. Verify current law before relying on any specific rule, rate, or position mentioned here.
Disclaimer: This is an official New York State Department of Taxation and Finance Advisory Opinion (TSB-A), issued by the Office of Counsel at a taxpayer's request. It is limited to the facts set forth in it and binds the Department only with respect to the petitioner to whom it was issued, and only if that petitioner fully and accurately described all relevant facts; another taxpayer cannot rely on it. It reflects the law, regulations, and Department policy in effect when issued and may since have changed. IMPORTANT: The Real Property Transfer Gains Tax discussed in this opinion was REPEALED for transfers occurring on or after June 15, 1996 (Chapter 309, Laws of 1996) and does not apply to any transfer today: this page is preserved for historical and research reference only. New York State and local sales taxes are administered centrally by the Department. This summary is informational only and is not legal or tax advice. Consult a licensed New York tax professional about your specific situation.
About this page: The plain-English summary, reader guidance, and Q&A below were written by Ezel based on the official state tax ruling. The original ruling (linked on this page as a PDF) is the authoritative source for any reliance.
View original ruling (PDF)

Plain-English summary

This tax no longer exists. New York's Real Property Transfer Gains Tax (former Article 31-B of the Tax Law) was a 10% tax on the GAIN from transferring New York real property where consideration was $1 million or more. It was repealed for any transfer occurring on or after June 15, 1996. This 1987 opinion is preserved here for historical and research value, not as current law.

Broad Financial Center Partners, a New York partnership, owned and leased an office building at 33 Whitehall Street in New York City, financed first by Manufacturers Hanover Trust Company and later by Aetna Life Insurance Company. Construction began in June 1984 and proceeded in two stages: the first stage (foundation, shell, core, and lobby) was substantially complete by December 1986, evidenced by a temporary certificate of occupancy. The second stage -- fitting out individual leased floors to tenant specifications, including air-conditioning, sprinklers, flooring, lighting, and partitions -- was anticipated to begin in April 1987 and, depending on market conditions, run through the last quarter of 1989. Because the building wasn't finished all at once, the Partnership proposed allocating construction-period interest, real property taxes, insurance, security, and specifically identified indirect project costs to each floor in proportion to that floor's share of total building square footage, through the date each floor's own construction ended.

This is one of a small group of near-identical opinions issued the same spring to different Manhattan office-building partnerships (all sharing the same 126 East 56th Street ownership/counsel address), each raising the exact same allocation question for a different building under construction. As in the companion rulings, the Department confirmed that construction-period interest, taxes, insurance, security, and specifically identified indirect project costs are includible in the cost of a capital improvement under former 20 NYCRR § 590.16(d) (with general/administrative overhead, like corporate management salaries, always excluded), and ruled that because the regulations don't prescribe a specific staged-construction allocation method, the Partnership's proposed square-footage-based, floor-by-floor method would be accepted as proper so long as it results in an equitable allocation -- subject to former 20 NYCRR § 590.16(e)'s rule that costs stop accruing during any suspension of construction activity between stages.

What this means for you

Developers building out office space floor-by-floor for different tenants

When a building is completed in stages spanning several years -- here, a first-stage base building finished in 1986 followed by a second-stage tenant build-out running to 1989 -- a floor-by-floor cost allocation tied to square footage was an acceptable way to determine original-purchase-price costs for gains-tax purposes, as long as the method was equitable.

Real estate accountants tracking capital-improvement costs over a multi-year phased construction project

Indirect project costs clearly tied to the specific project were includible; general corporate overhead was not, regardless of the allocation method chosen for staged construction spanning multiple years.

Tax attorneys advising on long-running, multi-tenant office build-out projects

A pattern worth noting: several large Manhattan office landlords sought the same ruling on the same construction-cost-allocation question around the same time in 1987, suggesting this was a common, market-standard financing and leasing structure for phased office construction in that era.

Common questions

Q: Does this construction-cost-allocation rule still matter today?
A: Not under this specific tax -- it was repealed for transfers on or after June 15, 1996.

Q: Why did the second construction stage run so long (nearly three years)?
A: The opinion attributes the pace to market conditions -- floors were built out only as individual tenant leases were signed, so the timeline depended on leasing demand rather than a fixed construction schedule.

Q: What happens to costs incurred during a gap in construction?
A: They aren't included -- former 20 NYCRR § 590.16(e) treats a suspension of construction activity as ending the construction period for cost-accrual purposes during that gap.

Q: Can another developer completing a similar project rely on this exact ruling?
A: No, apart from the repeal -- an Advisory Opinion binds the Department only as to the petitioner and facts presented, though several near-identical Manhattan office landlords received the same result on the same question in 1987.

Citations and references

Statutes and regulations:

  • former 20 NYCRR § 590.16(d) (construction-period interest, taxes, insurance, and specifically identified indirect project costs are includible in the cost of a capital improvement; general/administrative overhead costs are not)
  • former 20 NYCRR § 590.16(e) (the construction period ends when the property is substantially complete and ready for use; for staged projects, allowable costs cease on each completed part; a suspension of construction activity ends the construction period for cost-accrual purposes)

Source

Original ruling text

New York State Department of Taxation and Finance
TSB-A-87 (6) R
Real Property Transfer
Gains Tax
April 23, 1987

Taxpayer Services Division
Technical Services Bureau
STATE OF NEW YORK
STATE TAX COMMISSION
ADVISORY OPINION

PETITION NO. M870303B

On March 3, 1987, a Petition for Advisory Opinion was received on behalf of Broad
Financial Center Partners, located at 126 East 56th Street, 30th Floor, New York, New York.
The issue raised is whether the method proposed by Petitioner for determining the amount
of construction period interest, construction period real property taxes, insurance, security and specif­
ically identified indirect project costs, to be included in a building's original purchase price for the
purpose of computing the Real Property Transfer Gains Tax (hereinafter the Gains Tax) imposed by
Article 31-B of the Tax Law, is acceptable to the Department of Taxation and Finance.
The facts as presented are as follows: the Petitioner, a New York partnership, owns an office
building (hereinafter the Building) in New York City at 33 Whitehall Street. Financing for the
construction of the Building was provided first by Manufacturers Hanover Trust Company and then
by Aetna Life Insurance Company. The Petitioner has leased and intends to continue to lease floors
of the Building to individual tenants and has completed construction on some of the floors in the
Building and intends to complete construction of the balance of the floors in the Building according
to tenants' specifications.
Construction began in June of 1984 and has occurred in two stages. During the first stage,
the Building's foundation, shell (including external walls), core and lobby were substantially
completed, as evidenced by the issuance of a temporary Certificate of Occupancy. The first stage
of construction was substantially completed in December 1986.
During the second stage, the Petitioner will enter into leases covering one or more floors with
individual tenants and complete construction of the leased floor(s) according to the particular tenant's
specifications. This second stage of construction includes, as to each floor, the installation of air
conditioning ducts, sprinkler systems, flooring, ceiling, lighting, electrical and telephone outlets, and
any necessary partitions on the particular leased floor(s). It is anticipated that the second stage of
construction will begin in April of 1987 and, depending on market conditions, the Petitioner
estimates that the second stage of construction will be complete in the last quarter of 1989.
Since construction of the Building will not be completed at a single time, but rather on a floor by
floor basis, Petitioner proposes that, in computing the original purchase price of the Building,
interest on loans incurred in connection with the construction of the Building, construction period
real property taxes, insurance, security and specifically identified indirect project costs be allocated
to a particular floor in proportion to the ratio of that floor's square footage to the Building's total

RODERICK G. W. CHU, COMMISSIONER
TP-8 (3/83)

FRANK J. PUCCIA, DIRECTOR

GABRIEL B. DiCERBO, DEPUTY COMMISSIONER

-2­
TSB-A-87 (6) R
Real Property Transfer
Gains Tax
April 23, 1987
square footage and such amounts be included in the Building's original purchase price to the extent
paid or accrued through the date that construction ends with respect to that floor.
Gains tax regulations section 590.16(d) states in pertinent part as follows:
Q.

What additional costs are allowed if incurred during a construction period?

A.

Other costs that are clearly associated with construction of a real estate project
can also be included as a cost of constructing a capital improvement. If the
capital improvement requires a construction period, a period of time in which
necessary activities are conducted to bring the improvement on the real property
to that state or condition necessary for its intended use, the interest cost paid
during that period on a construction loan, real property taxes, insurance or
similar items are includible as a cost of construction.

Also, Section 590.16(d) of the Gains Tax Regulations states in pertinent part as follows:
Indirect project costs may also be included in original purchase price if they are
specifically identified with a project. Indirect project costs are indirect costs
incurred after the acquisition of the property, such as construction
administration costs, legal fees, and various office costs (cost accounting
expenses, design costs, and other expenses of departments providing services
to projects), that clearly relate to projects under construction. The full amount
of indirect project costs that clearly relate to a specific project, such as costs
associated with a field office at a project site and the administrative personnel
that staff the office, may be added to the cost of the capital improvement.
However, indirect project costs which relate to numerous projects must be
allocated in a rational manner to the projects to which the cost relate based on
the nature of activity that gave rise to the costs.
Indirect project costs that do not clearly pertain to projects under construction
and all general and administrative costs cannot be added to the cost of capital
improvement. General and administrative costs include such costs as corporate
management salaries, general accounting expenses, corporate office expenses,
general legal fees, and similar costs which are generally incurred by all
enterprises in the conduct of business.
Furthermore, section 590.16(e) of the Gains Tax regulations states in pertinent part as follows:
The construction period ends when the real property is substantially complete
and ready to be placed in service. Some construction projects are completed in
sections, leaving part of the real property capable of being used independently

-3­
TSB-A-87 (6) R
Real Property Transfer
Gains Tax
April 23, 1987
while construction continues on other sections. For such projects, allowable
construction period expenses shall cease on each part when it is substantially
complete and ready for use. A construction period for a project may be sus­
pended before a project is completed for various reasons, such as insufficient
sales or insufficient rental demands. In such a case, the construction period has
ended, and the costs allowed during a construction period will no longer be
allowed.
Based on the foregoing, the costs of interest on construction loans incurred in connection with
the construction of the Building, construction period real property taxes, insurance, security, and
specifically identified indirect project costs incurred during a construction period are allowed as costs
of constructing a capital improvement. The specific method of allocating such costs in the case of a
construction project which is completed in steps is not specifically stated in the Gains Tax regulations.
However, the method chosen by the Petitioner of allocating such costs would be deemed a proper
method as long as it results in an equitable allocation.
Also, as provided at section 590.16(e) of the Gains Tax regulations, if there is a suspension of
the construction activity between the end of the first stage of construction and the beginning of the
second stage, the costs allowed during a construction period will no longer be allowed between such
stages.

DATED: April 23, 1987

s/FRANK J. PUCCIA
Director
Technical Services Bureau

NOTE: The opinions expressed in Advisory Opinions
are limited to the facts set forth therein.