Reyes Construction, Inc.

Four trench-protection violations affirmed

Reyes Construction excavated around a leaking water pipe in an eight-foot-deep trench with vertical walls and Type B or C soil. One trench box had an open end next to a vertical soil wall and large gaps that allowed hazardous movement, while another lacked protection along the bottom four and…

August 10, 2020 ·Brian A. Duncan
Citations affirmed
ALJ

Galluzzo Equipment & Excavating, Inc.

Most excavation violations affirmed

Galluzzo Equipment & Excavating installed a concrete catch basin and pipe in a street excavation in Lodi, New Jersey. The judge affirmed serious violations involving trench-safety training, the lack of a competent person, missing hard hats, an unsecured pneumatic-hose coupling, an unprotected spoil…

November 17, 2003 ·Covette Rooney
Mixed result
ALJ

Jalco, Inc., and its successors

Three trench-safety citations upheld as violations but each downgraded in severity

Jalco is a utility contractor that was installing a 42-inch water line in Edinburg, Texas. OSHA inspected the trench work and issued three excavation citations: the trench box did not extend 18 inches above the vertical trench wall, the trench floor was dug too far below the bottom of the box, and…

January 22, 2001 ·James H. Barkley
Modified
COMM

Honey Creek Contracting Co.

Review vacated after employer failed to brief

Honey Creek Contracting petitioned for Commission review of two administrative law judge decisions concerning excavation work in Homer City, Pennsylvania. After directing the cases for review, the Commission ordered Honey Creek to file a brief or a letter in lieu of a brief within 40 days. Honey…

November 16, 1998
Procedural
ALJ

Linde Enterprises, Inc.

Trenching cave-in items affirmed serious, seat-belt item vacated, $1,800

Linde Enterprises is a Pennsylvania excavating contractor that was installing utility lines in Dunmore, Pennsylvania. Acting on an anonymous complaint, an OSHA compliance officer inspected the trench worksite and issued one serious citation with four items. Linde first argued the inspection was…

May 13, 1996 ·John H. Frye, III
Mixed result

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.