COMM

Cedar Construction Company

Two willful trench violations merged into one with a $4,750 penalty

Cedar Construction Company excavated trenches and installed utility sewer pipe for the City of Lincoln, Nebraska. Two employees were working in a 14-to-15-foot-deep trench when part of a wall collapsed, fatally injuring one employee. The Commission found that the trench had water and unstable soil…

April 22, 1977
Modified
COMM

Anchor Construction Co.

Amended trench citation affirmed with a $400 penalty

Anchor Construction employees worked in an 11-foot-deep trench dug in clay soil with water entering it. Evidence showed sloughing at the bottom, a cracked wall, and soil that would not support weight without extra protection. The Commission allowed the Secretary to replace the originally cited…

June 16, 1976
Mixed result
COMM

Bayside Pipe Coaters, Inc.

Subcontractor remains responsible for its trench crew

Bayside Pipe Coaters sent a foreman and two employees to waterproof pipe in a trench excavated by a general contractor. The company admitted that the trench, spoil-pile, and compressed-gas-cylinder conditions violated OSHA standards but argued that its contract made the general contractor solely…

September 20, 1974
Citations affirmed
COMM

Frank Irey, Jr., Inc.

Willful trench violation and $5,335 total penalties affirmed

Frank Irey performed underground electrical-conduit work in a trench about seven-and-one-half feet deep. The trench was not shored or sloped in soft or unstable material, and an employee died when a side collapsed. The administrative law judge classified the trench violation as willful because the…

August 1, 1973
Mixed result

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.