Workplace-safety cases from the Occupational Safety and Health Review Commission (OSHRC) and mine-safety cases from the Federal Mine Safety and Health Review Commission (FMSHRC), each with a plain-English summary, the standards it cites, and whether it counts as precedent. More agencies are coming.

5,577 decisions and counting · Latest decision July 17, 2026
6 decisions 29 C.F.R. § 1926.405(a)(2)(ii)(E)

No decisions match these filters

Try a different search term or clear the filters.

ALJ

RJCL Corporation, d/b/a RNV Construction

Mixed ruling on scaffold and electrical citations

OSHA inspected RNV Construction at a residence and a commercial building in Saipan and issued scaffold and electrical citations carrying $44,754 in proposed penalties. The judge found that RNV Construction employed the residence workers and rejected its challenges to both inspections. Most items…

December 28, 2023 ·Patrick B. Augustine
Mixed result
ALJ

Morse Diesel International, Inc.

All citations vacated because the contractor lacked knowledge of the hazards

Morse Diesel International (MDI) was the general contractor on the "Wedge One" phase of the Pentagon Renovation Program in Arlington, Virginia. During a September 1999 inspection, OSHA cited MDI for two serious guardrail items (a wire-rope guardrail around a second-floor opening had sagged below…

October 18, 2000 ·G. Marvin Bober
Citations vacated
COMM

George Campbell Painting Corporation

Bridge fall violation reduced from willful to serious

A Campbell painter fell 35 feet from the Queensboro Bridge while maneuvering a heavy spray pump through a wall opening without tying off. The Commission allowed the Secretary's post-hearing amendment from guardrail standards to the fall-protection standard at § 1926.105(a) because Campbell had made…

September 29, 1999
Modified
ALJ

Sparrow Construction Corp.

General contractor liable for unshored fire-damaged floors

Sparrow Construction was the general contractor for the rehabilitation of fire-damaged residential buildings in New York City. Two subcontractor employees removed debris beneath floors and structural areas that had partially collapsed, with hanging debris above them and no shoring or bracing. The…

September 2, 1993 ·Irving Sommer
Mixed result
COMM

Dover Elevator Company

Unsecured-ladder item reduced to de minimis by settlement

Dover Elevator was an elevator subcontractor on a renovation project in New York City where OSHA issued serious, repeat, and other-than-serious citations. The Commission directed review only of an unsecured portable ladder item that the ALJ had affirmed as repeated with a $1,000 penalty. In a…

August 11, 1993
Modified
COMM

All Phase Electric & Maintenance, Inc.

Informal-conference request did not contest citations

OSHA cited All Phase Electric for two serious electrical violations and one other-than-serious posting violation, with $240 in proposed penalties. The company received the citations on December 18, 1989, but did not submit a written notice of contest within the 15-working-day period ending January…

October 4, 1991
Procedural

What these documents are

  • Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
  • ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
  • Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
  • Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.