Fort Defiance Construction & Supply, Inc.
All three trenching items vacated
Fort Defiance Construction & Supply was installing utilities in a trench at a Dayton, Ohio, road project. OSHA alleged that employees lacked a safe exit, that the onsite foreman was not a competent person, and that the trench lacked adequate cave-in protection. The judge found that employees could…
Blankenship & Lee Pipeline Co., Inc.
Trenching and hazard-communication violations affirmed
Blankenship & Lee Pipeline was reconstructing sewer lines for a pumping station in Pelham, Georgia. An employee worked in a vertical trench that measured between 5 feet 4 inches and 6 feet deep without a ladder, adequate cave-in protection, or a hard hat; loose spoil was stored only inches from the…
Metric Constructors, Inc.
General contractor held liable for subcontractor hazards
Metric Constructors was the general contractor for a 29-building federal prison project covering about 200 acres in Estill, South Carolina. OSHA cited scaffold, trench, hazard-communication, fire-extinguisher, compressed-gas-cylinder, and trench-access conditions created by subcontractors whose…
A. R. Butler Construction Co.
Commission approves trench-case settlement
A. R. Butler Construction was installing a sewer line in an eight-and-a-half to nine-foot trench in Flint City, Alabama. The underlying ALJ decision found that the steep earthen route was not a safe means of exit and that employees worked without adequate cave-in protection. The judge classified…
Supermason Enterprises
Willful unprotected-trench violation affirmed
Supermason Enterprises installed a sanitary sewer in Pen Argyl, Pennsylvania, with two workers in an excavation eight to ten feet deep. The ALJ rejected the company's claim that the workers belonged to a subcontractor because the supposed agreement was unsigned, the alleged subcontractor had never…
Fluidics, Inc.
Mixed construction ruling assesses $13,600
Fluidics performed mechanical-system renovations at a Philadelphia public-housing project with unusually difficult site-security conditions. The judge affirmed serious violations involving unsecured and improperly separated compressed-gas cylinders, missing GFCI protection, exposed energized…
PDC, Inc.
Trench-exit item affirmed, cave-in item vacated
PDC employees installed a gas line in a trench beside a Georgia highway that ranged from four and a half to eight and a half feet deep. The trench had no ladder or other safe means of egress, and workers exited by placing their hands on the ground and jumping from the shallow end. The judge…
Philadelphia Construction Equipment, Inc.
Default affirms excavation citations for $16,650
Philadelphia Construction Equipment failed to appear for its scheduled hearing on serious and willful construction citations. After an initial remand gave the company another opportunity, the ALJ rejected its explanation for arriving late and found no good cause to reinstate the case. The record…
Piping of Ohio, Inc.
Trenching violations affirmed, willful item reclassified as repeated
Piping of Ohio was replacing a water line in two excavations at an Ohio steel plant. The judge found that employees lacked adequate trench-safety instruction, did not have a safe means of exit, and were not protected by inspections from a qualified competent person. The judge also found that the…
Earl A. Eichline Enterprises, Inc.
Trench cave-in protection violation affirmed, two other items vacated
Earl A. Eichline Enterprises was repairing a water line valve in an excavation in New Berlin, Wisconsin. OSHA cited the company for inadequate cave-in protection, no safe means of exit, and failure to provide high-visibility garments near traffic. The judge affirmed the repeated cave-in protection…
What these documents are
- Commission decisions: Rulings by the Occupational Safety and Health Review Commission itself, the highest level of agency review. These are citable as Commission precedent, though a decision may have been appealed to a U.S. Court of Appeals after issuance.
- ALJ decisions: Rulings by OSHRC Administrative Law Judges after a hearing. When no Commissioner directs review, an ALJ decision becomes a final order under 29 U.S.C. § 661(j): it binds the parties in that case but is not binding precedent in other cases.
- Why finality matters: Every page here says which kind of decision you are reading, so you know whether it is precedent you can cite or a final order that only shows how one judge ruled on one set of facts.
- Where they come from: Every page links the official OSHRC public release, and the full text on the page is that release. The plain-English summaries are written by Ezel.