Plain-English summary
Black Construction excavated a trench near Guam International Airport to replace a manhole and redirect a sewage pipe. An employee worked in a section measured at six and one-half feet deep without sloping, shoring, or another cave-in protective system. Judge Nancy J. Spies rejected the Secretary's soil expert opinion because it relied only on small photographs, but the existing pipe and old manhole independently proved the excavation was in previously disturbed soil and therefore could not be entirely stable rock. She affirmed the serious cave-in item and assessed $500 because exposure and duration were limited. The Secretary withdrew the competent-person inspection item and its alternative.
Decision snapshot
- Cited standard(s): 29 C.F.R. § 1926.652(a)(1); 29 C.F.R. § 1926.651(k)(1); 29 C.F.R. § 1926.651(k)(2).
- Outcome: Serious cave-in-protection item affirmed with a $500 penalty; inspection item and alternative vacated after withdrawal.
- Key point: Previously disturbed soil around existing utilities is not stable rock, so an excavation deeper than five feet requires a compliant cave-in protective system.
Full text (OSHRC public release)
Secretary of Labor,
Complainant,
v. OSHRC Docket No. 98-0975
Black Construction Corporation,
Respondent.
Appearances:
Alan Raznick, Esquire Thomas C. Moody, Esquire
Cheryl L. Adams, Esquire Klemm, Blair, Sterling & Johnson
U. S. Department of Labor Agaña, Guam
Office of the Solicitor For Respondent
San Francisco, California
For Complainant
Before: Administrative Law Judge Nancy J. Spies
DECISION AND ORDER
Black Construction Corp. (BCC) contests a citation issued to it by the Secretary on April
29, 1998. Item 1 of the citation alleges a serious violation of §1926.652(a)(1) for failure to
provide an adequate protective system in an excavation. Item 2 alleged a serious violation of §
1926.651(k)(1) or, in the alternative, of § 1926.651(k)2). The Secretary withdrew item 2 and the
alternative allegation in her post-hearing brief (Brief, pp. 2-3). Accordingly, item 2 and its
alternative are vacated.
The hearing was held on March 15, 1999. BCC stipulated to jurisdiction and coverage
(Tr. 5-6). BBC argues that the Secretary’s evidence fails to establish that BCC was in
noncompliance with § 1926.652(a)(1). For the reasons set out, item 1 of the citation is affirmed.
Background
On November 6, 1997, Anthony Santos conducted an inspection on behalf of the
Occupational Safety and Health Administration (OSHA) of a BCC worksite located near the
1
Guam International Airport (Tr. 8).1 Santos arrived at BCC’s worksite, where a crew was
engaged in replacing a manhole and changing the direction of a sewage pipe (Tr. 18).
BCC had excavated a trench that morning (Tr. 37). The trench was located parallel to a
public roadway, approximately 8 feet away. As Santos drove up, he saw the hard hat on an
employee working in the trench. By the time Santos had parked and walked up to the trench, no
one was in the trench (Tr. 10-11).
No protective system to prevent a cave-in was in use (Tr. 27). Santos spoke with the
BCC’s foreman and its project engineer. He asked why no protective system was being used in
the trench. The foreman and the project engineer told him that the company had taken soil
samples prior to excavating the trench and had determined that a protective system was not
required (Tr. 14, 22-23).
Santos used a fibreglass measuring rod to measure the depth and width of the trench. He
measured the depth as being 6½ feet and the width as 4 feet, 2 inches. He did not measure the
length of the trench but estimated at the hearing that it was approximately 10 feet long (Tr.15).
Item 1: Alleged Serious Violation of §1926.652(a)(1)
The Secretary has the burden of proving her case by a preponderance of the evidence.
In order to establish a violation of an occupational safety or health
standard, the Secretary has the burden of proving: (a) the applicability of the cited
standard, (b) the employer’s noncompliance with the standard’s terms, (c)
employee access to the violative conditions, and (d) the employer’s actual or
constructive knowledge of the violation (i.e., the employer either knew or, with
the exercise of reasonable diligence could have known, of the violative
conditions).
Atlantic Battery Co., 16 BNA OSHC 2131, 2138 (No. 90-1747, 1994).
In order to establish that a violation is “serious” under §17(k) of the Act, the Secretary
must establish that there is a substantial probability of death or serious physical harm that could
result from the cited condition. In determining substantial probability, the Secretary must show
that an accident is possible and the result of the accident would likely be death or serious
1
Santos works for the government of Guam. He is permitted to make inspections on behalf of OSHA as part of
joint enforcement program with the U.S. Department of Labor (Tr. 6).
2
physical harm. The likelihood of the accident is not an issue. Spancrete Northeast, Inc., 15
BNA OSHC 1020, 1024 (No. 86-521, 1991).
The Secretary alleges that BCC committed a serious violation of §1926.652(a)(1), which
provides:
Each employee in an excavation shall be protected from cave-ins by an adequate
protective system designed in accordance with paragraph (b) or (c) of this section
except when:
(i) Excavations are made entirely in stable rock; or
(ii) Excavations are less than 5 feet (1.52m) in depth and
examination of this ground by a competent person provides
no indication of a potential cave-in.
Section 1926.652(a)(1) applies to BCC’s construction site. At least one employee was in
the trench, and BCC knew that the employee was in the trench. The only element in dispute is
the employer’s noncompliance with the standard.
BCC argues that the Secretary failed to prove that the trench was greater than 5 feet in
depth. This argument is without merit. Santos used a measuring rod to take the dimensions of
the trench. BCC offered no evidence of any other measurements made of the trench. The
company contends that Santos’s testimony regarding the measurements is contradictory in
relation to the photographs that he made of the trench (Exhs. C-1 through C-5; Tr. 17, 34). The
undersigned does not find it so. Santos was clear that the areas of the trench shown in Exhibits
C-2 and C-3 measured 6 feet, 6 inches deep, and the areas shown in Exhibits C-4 and C-5 were
less than 5 feet deep. Santos’s measurements are accepted as accurate. Santos saw the employee
at the Exhibit C-2 area of the trench (Tr. 39).
BCC argues that the Secretary failed to establish that the excavation was not made
entirely in stable rock, in which case no protective system would be necessary. BCC contends
that the testimony of the Secretary’s expert witness, Dr. Alan Peck, is speculative and not
supported by reasonable scientific certainty. While the undersigned agrees that Dr. Peck’s
testimony deserves no consideration in the determination of this issue, she is compelled to
conclude that the trench was not excavated in stable rock.
BCC stipulated to Dr. Peck’s credentials and qualifications as an expert in soil analysis,
as established in the hearing held immediately prior to the one in the present case, Black Micro
3
Corp., (No. 97-1413) (Tr. 41). Dr. Peck’s credentials were set out in the decision issued in that
case as follows (Black Micro Corp., No. 97-1413, p.4 (citations to the transcript omitted)):
Dr. Peck is a soil specialist and chemist who has worked for the
U.S. Department of Labor at its laboratory in Salt Lake City, Utah,
for the past 24 years. Dr. Peck received a Bachelor’s Degree in
chemistry from Brigham Young University in 1953. He received a
Master’s Degree in 1955 and a Ph.D. in 1962, both from the
University of Utah, in metallurgical engineering. Dr. Peck was
accepted at the hearing as an expert in soil analysis.
Dr. Peck testified that the trench was excavated in Type B or C soil (Tr. 44). His
testimony is based solely on a visual review of the five 3-by-5 inch photographs taken by Santos
at the site (Exhs. C-1 through C-5). Dr. Peck admitted that he could give his opinion only "to a
limited extent" and that normally he would determine soil classification by analyzing an actual
soil sample (Tr. 42). Dr. Peck stated that additional information would be helpful to him in
classifying the soil (Tr. 42, 50). His lack of confidence in his conclusions regarding the trench
material is evident in this exchange (Tr. 52-53):
Q.: But again, you’re not able, with any reasonable scientific
certainty, to make an opinion about the composition of rock
in this trench; is that correct?
Dr. Peck: I could make an assumption.
Q.: You could make an assumption?
Dr. Peck: Yes.
Q.: But not an opinion?
Dr. Peck: Well--
Q.: Is that correct?
Dr. Peck: I could give an opinion also.
Q.: Would that be supported by reasonable scientific certainty?
Dr. Peck: It would be supported by one fact.
4
Q.: One fact?
Dr. Peck: Yes.
Q.: That, in your words, is that reasonable scientific certainty?
Dr. Peck: It’s not positive, and it is not certainty.
Q.: So it is not dispositive of the issue?
Dr. Peck: Right.
Dr. Peck’s testimony is discounted in its entirety. Although he is an expert in soil
analysis, he lacked sufficient information with which to form a reliable opinion. Visual
inspection of small photographs is an inadequate method of soil analysis.
The Secretary’s case is established, however, due to the uncontradicted testimony of
Santos that the trench was excavated in previously disturbed soil. BCC’s excavation uncovered a
PVC pipe that had been previously installed, and BCC was in the process of replacing an old
manhole (Tr. 21-22, 24).
Appendix A to subpart P of the 1926 construction standards states:
Type B means:
...
(iii) Previously disturbed soils except those which would otherwise be classed
as Type C soil.
By definition, trenches excavated in previously disturbed soil cannot be dug in anything
more stable than Type B soil. They cannot be excavated entirely in solid rock. The Secretary
has proven that BCC excavated a trench in Type B soil, that the trench was greater than 5 feet in
depth, and that no shoring, sloping, or any other form of protective system was used to prevent a
cave-in. At least one employee worked in the trench while it was in this condition. BCC
violated §1926.652(a)(1).
The hazard created by the failure to comply with §1926.652(a)(1) is that the trench could
cave in, crushing and suffocating any employees working in the trench (Tr. 28). The violation is
serious.
5
Penalty Determination
The Commission is the final arbiter of penalties in all contested cases. Under § 17(j) of
the Act, in determining the appropriate penalty, the Commission is required to find and give "due
consideration" to (1) the size of the employer’s business, (2) the gravity of the violation, (3) the
good faith of the employer, and (4) the history of previous violations. The gravity of the
violation is the principal factor to be considered.
The Secretary failed to put on any evidence regarding size, good faith, and history of
violations. The calculation of the proposed penalty was not explained.
The gravity of the violation is low. The trench was open for approximately 4 hours (Tr.
37). The record establishes exposure to only one employee. The 10-foot long trench did not
exceed 5 feet for its entire length. A ladder was in the trench (Exh. C-1).
Upon consideration of the low gravity of the violation, and crediting BCC with good faith
and with a history of no previous violations, it is determined that a penalty of $500.00 is
appropriate.
FINDINGS OF FACT AND CONCLUSIONS OF LAW
The foregoing decision constitutes the findings of fact and conclusions of law in
accordance with Federal Rule of Civil Procedure 52(a).
ORDER
Based upon the foregoing decision, it is hereby ORDERED that:
1. Item 1 of the citation, alleging a serious violation of § 1926.652(a)(1) is affirmed,
and a penalty of $500.00 is assessed; and
2. Item 2 of the citation and its alternative allegation are withdrawn by the Secretary
and vacated, and no penalty is assessed.
NANCY J. SPIES
Judge
Date: August 9, 1999
6
Get today's answer for your situation
You just read what one judge decided for one employer in 1999, and it binds only those parties. Ezel checks the current OSHA standards and Commission precedent and answers your specific situation, with citations.
Opens in Ezel Pro. Every answer cites the authority it relies on.