OSHRC Commission decision Docket 94-1374 Decided September 10, 2010 Mixed result

Dayton Tire, Bridgestone/Firestone

Ninety-nine willful lockout violations affirmed

Apply this precedent to your situation

This is citable Commission precedent from 2010, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 2010
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission
This is a decision of the Occupational Safety and Health Review Commission, the highest level of agency review, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals after issuance; check subsequent history before relying on it. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

OSHA cited Dayton Tire after a fatal machine accident at its Oklahoma City tire plant, alleging widespread failures under the lockout and tagout standard. The Commission rejected Dayton's vagueness, applicability, minor-servicing, and infeasibility arguments. It also held that separate violations were permissible for distinct machine types and for individual employees who lacked authorized-level training. The Commission found willfulness because the plant's safety management repeatedly failed to reassess its program despite internal directions, OSHA warnings, and detailed knowledge of the servicing tasks. It affirmed ninety-nine violations as willful, vacated one item, and assessed total penalties of $1,975,000.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1910.147
  • Outcome: Ninety-nine lockout and tagout violations affirmed as willful, one item vacated, and $1,975,000 in total penalties assessed.
  • Key point: Repeatedly refusing to evaluate known servicing tasks against the lockout standard after specific warnings can establish conscious disregard or plain indifference.

Full text (OSHRC public release)

DAYTON TIRE, BRIDGESTONE/FIRESTONE, Docket No. 94-1374

DECISION

SECRETARY OF LABOR,

Complainant,

v.

OSHRC Docket No. 94-1374

DAYTON TIRE, BRIDGESTONE/FIRESTONE,

Respondent,

UNITED STEEL WORKERS OF AMERICA,

LOCAL 998,

Authorized Employee

Representative.

APPEARANCES:

Ronald J. Gottlieb and John Shortall, Attorneys; Kenneth A. Hellman and Nicholas J. Levintow,
Senior Trial Attorneys; Ann Rosenthal, Counsel for Appellate Litigation; Joseph M. Woodward,
Associate Solicitor; Marvin Krislov, Deputy Solicitor; J. Davitt McAteer, Acting Solicitor; U.S.
Department of Labor, Washington, DC

For the Complainant

Willis J. Goldsmith, Esq.; Thomas M. Beck, Esq.; Jacqueline M. Holmes, Esq.; Michael F.
Dolan, Esq.; Jones, Day, Reavis & Pogue, Washington, DC and Chicago, IL

For the Respondent

George H. Cohen, Esq.; Jeremiah A. Collins, Esq.; Margo Pave, Esq.; Bredhoff & Kaiser, PLLC,
Washington, DC

For the Authorized Employee Representative

DECISION

Before: ROGERS, Chairman; THOMPSON and ATTWOOD, Commissioners.

BY THE COMMISSION:

Following an accident that resulted in a fatality, the Occupational Safety and Health
Administration (“OSHA”) inspected a tire manufacturing plant operated by Dayton Tire, a
division of Bridgestone/Firestone, Inc. (“Dayton”) located in Oklahoma City, Oklahoma. The
Secretary issued a citation to Dayton under the Occupational Safety and Health Act of 1970
(“OSH Act” or “Act”), 29 U.S.C. §§ 651-678, alleging 107 willful violations under various
provisions of the general industry lockout/tagout (“LOTO”) standard, 29 C.F.R. § 1910.147.

The Secretary alleges that Dayton violated the cited LOTO standard provisions based on
its failure to do the following: (1) establish energy control procedures for seven different
machines located in six departments; (2) inspect, certify, and utilize those procedures; (3) supply
the necessary locks to effectively lock out its equipment; and (4) provide its employees with the
required level of LOTO training. She alleged six separate violations for Dayton’s failure to
establish energy control procedures for the seven machines located in six different departments,
and alleged multiple training violations on a per-employee basis (collectively referred to
hereafter as “per-instance” citations). The Secretary proposed the maximum willful penalty of
$70,000 for each alleged violation and, after she withdrew a number of citation items and
amended the citation to add one item, the total proposed penalty was $7,000,000.

After a 35-day hearing, former Administrative Law Judge Robert A. Yetman affirmed all
of the citation items except the item pertaining to Dayton’s failure to utilize LOTO procedures
(Item 107), which he sua sponte consolidated into a single item with one of the items pertaining
to Dayton’s failure to establish energy control procedures (Item 1). The judge characterized
some of the affirmed items as willful, others as serious, and one item as other-than-serious, and
assessed a total penalty of $517,000. On review, Dayton argues that the LOTO standard is
unenforceably vague and inapplicable to the cited conditions, compliance with the standard is
infeasible, and certain items are duplicative. Dayton also challenges the Secretary’s decision to
cite Dayton’s failures to establish energy control procedures and provide proper training on a
per-instance basis. Finally, both parties raise challenges regarding characterization and
penalties.

For the reasons that follow, we reject Dayton’s vagueness challenge and infeasibility
defense, find the standard applicable to the cited conditions, and find that the Secretary
permissibly cited Dayton on a per-instance basis for its failures to establish energy control
procedures and provide proper training. Accordingly, we affirm all but one of the citation items,
characterize the affirmed items as willful, and assess a total penalty of $1,975,000.

BACKGROUND

From the time it opened in 1969, Dayton manufactured tires at its Oklahoma City plant
which, as the judge noted, comprised “approximately 72 acres . . . , employ[ed] approximately
1,200 employees[,] and produce[ed] an average of 35,000 tires per day.” The judge’s description
of the tire manufacturing process reveals that it is “complex,” involving “[h]undreds of machines
performing a large variety of tasks” in numerous departments that begins with “the initial mixing
of [] various grades of rubber” and ends with “the final inspection function.” On October 19,
1993, a Dayton employee was preparing a tire assembly machine to produce a different size tire
at the Oklahoma City plant when, as Dayton’s investigation showed, he accidentally tripped a
limit switch that activated the machine and was caught in its workings. As a result of this
accident, the employee sustained a serious injury from which he later died. 

On the day of the accident, OSHA commenced an inspection of the plant focusing on
LOTO compliance and issued Dayton a willful citation on April 18, 1994.  The factual
allegations underlying the citation involve seven different types of machines that were part of
Dayton’s tire manufacturing process:  (1) beadwinder machines, (2) second stage tire assembly
machines (“TAMs”), (3) radial dopers, (4) curing presses, (5) banbury machines, (6) “Dayton
loaders” and tread tubers, and (7) module machines.  As described below, Dayton employees
worked on this equipment at two different stages in the manufacturing process: (1) before
commencement of a production run or during a break in production to prepare the machines for
the specific production process, and (2) during production by performing tasks necessary to keep
the equipment functioning properly.

With respect to pre-production tasks, Dayton employees were required to prepare the
beadwinder machines, the TAMs, and the curing presses for their respective production
operations.  To prepare the beadwinder machines for the production of different sizes of beads
(the part of the tire that fits within the wheel rim), employees known as “operators” removed and
installed various machine parts, including a metal rotating disc known as a “chuck” and a
horseshoe-shaped part known as a “ply block.”  To prepare the TAMs for the production of
different sizes of tires, employees known as “TAM size-changers” not only removed and
installed several machine parts, but also made adjustments to the machinery and built “check
tires”—a set of six tires produced for quality control purposes. And to prepare the curing presses
for different sizes or types of tires, employees known as “mold/bladder changers” removed and
installed the presses, which were comprised of numerous parts including large metal molds and
inflatable rubber bladders.  Whenever there were changes in bead size, the mold/bladder
changers also removed and installed post cure inflator (“PCI”) rings, which inflated and cooled
the molded tires, and then mechanically transferred the tires to a conveyor.

During the course of production operations, Dayton employees were required to clean the
radial dopers and replace certain parts of the beadwinder and module machines, as well as
remove material that jammed the components of the module machines, tread tubers, Dayton
loaders, and banbury machines. Specifically, employees known as “radial doper attendants”
periodically removed paint and lubricant that built up on various parts of the radial dopers. 
Employees known as “module operators” replaced certain worn parts of the module machines
such as “grinding stones,” which are round disks with sandpaper-like edges that rotate at high
speeds, and removed tires that jammed various components of the machinery. Operators of the
beadwinder machines replaced large wire reels when wire ran out, broke, or was not the correct
type. Finally, employees known as “mill attendants” removed rubber that jammed various
components of the Dayton loaders and tread tubers, and employees known as “belt loaders” and
“T-mix attendants” removed rubber that jammed various components of the banbury machines.

It is undisputed that, between October 19, 1993 and April 18, 1994, Dayton did not
develop, document, or utilize energy control procedures under 29 C.F.R. § 1910.147(c)(4)(i) for
its employees who performed any of these job tasks. It is also undisputed that during this period,
Dayton employees were not provided with locks under 29 C.F.R. § 1910.147(c)(5)(i), and that
all of the employees specifically referenced in the citation items affirmed by the judge received
LOTO training under 29 C.F.R. § 1910.147(c)(7)(i) at the affected, but not authorized, level.

Finally, with one exception, see infra footnote 4, evidence in the record shows that during this
period, each of these employees performed at least one of the activities described above.

ANALYSIS

I. The LOTO Standard: Scope, Application, and Purpose

The core principles and elements of the LOTO standard were described by the
Commission just a few years ago in a case that involved similar citations.

The LOTO standard, which became effective January 2, 1990, was promulgated
to prevent industrial accidents during servicing of machines that remain in an
operational mode, are turned off but connected to a power source, retain stored
energy, or are reactivated by another worker unaware that servicing is in progress.
Control of Hazardous Energy Sources (Lockout/Tagout): Final Rule [], 54 Fed.
Reg. 36,644 (Sept. 1, 1989); Control of Hazardous Energy (Lockout/Tagout):
Final Rule; Suspension of Effective Date [], 54 Fed. Reg. 46,610, (Nov. 6, 1989).
In general, the LOTO standard requires an employer to establish a program that
includes employee training, use of energy control procedures, and periodic
inspections designed to prevent employee exposure to the unexpected
energization of equipment during servicing and maintenance operations, and
dovetails with the requirements for the safe operation of machines during
production, as prescribed by 29 C.F.R. Part 1910, subpart O.

Gen. Motors Corp . (“ GM ”), 22 BNA OSHC 1019, 1022, 2004-09 CCH OSHD ¶ 32,928, pp.
53,604-05 (No. 91-2843E, 2007) (consolidated).

Specifically, t he LOTO standard “covers the servicing and maintenance of machines and equipment in
which the unexpected energization or start up of the machines or equipment, or release of stored energy could cause
injury to employees.” 29 C.F.R. § 1910.147(a)(1)(i). “ Servicing and/or maintenance” is defined as
“[w]orkplace activities such as constructing, installing, setting up, adjusting, inspecting, modifying, and maintaining
and/or servicing machines or equipment,” including “lubrication, cleaning or unjamming of machines or equipment
and making adjustments or tool changes, where the employee may be exposed to the unexpected energization or
startup of the equipment or release of hazardous energy.” 29 C.F.R. § 1910.147(b). Although the phrase
“ unexpected energization” is not defined in the standard, the Commission has held that “ [e]nergization is
‘unexpected’ in the absence of some mechanism to provide adequate advance notice of machine
activation.” GM , 22 BNA OSHC at 1023, 2004-09 CCH OSHD at p. 53,606; accord Burkes
Mech ., Inc. , 21 BNA OSHC 2136, 2139 n.4, 2004-09 CCH OSHD ¶ 32,922, pp. 53,561-62 n.4 (No.
04-1475, 2007).

On review, Dayton claims that the scope provision is unenforceably vague and that the
activities performed by its employees are not subject to the LOTO standard’s requirements. For
the following reasons, we reject both arguments.

A. Vagueness

Dayton maintains that the phrase “ unexpected energization,” as used in both the scope
provision and the definition of “servicing and/or maintenance,” is unenforceably vague because
neither the Secretary nor the LOTO standard adequately define what “threshold risk level” of
unexpected energization triggers the standard’s requirements. To determine whether a standard
is unenforceably vague, the Commission first examines the language of the standard at issue,
which is “viewed in context, not in isolation.” Ormet Corp. , 14 BNA OSHC 2134, 2135, 1991-93 CCH OSHD ¶ 29,254, p. 39,200 (No. 85-531, 1991); see Faultless Div. , Bliss & Laughlin
Indus., Inc. v. Sec’y of Labor (“ Faultless ”), 674 F.2d 1177, 1185 (7th Cir. 1982) (noting that
“[w]hen considering remedial legislation such as the OSH Act and its implementing regulations,
the purported vagueness of a standard is judged not on its face but rather in the light of its
application to the facts of the case”). If the language is vague, then the Commission considers
whether “‘a reasonable person,’ examining the generalized standard in the light of a particular
set of circumstances, can determine what is required,” or whether “the particular employer was
actually aware of the existence of a hazard and of a means by which to abate it.” J.A. Jones
Constr. Co. , 15 BNA OSHC 2201, 2206, 1991-93 CCH OSHD ¶ 29,964, p. 41,025 (No. 87-2059,
1993) (consolidated) (citation omitted).

Dayton’s vagueness challenge fails on two fronts. First, relying on the plain language of
§ 1910.147(a)(1)(i), and specifically emphasizing the standard’s inclusion of the phrase
“ unexpected energization,” the Commission has held that the “Secretary must show that there is
some way in which the particular machine could energize, start up, or release stored energy
without sufficient advance warning to the employee.” Gen. Motors Corp., Delco Chassis Div.
(“ GM-Delco ”), 17 BNA OSHC 1217, 1219-20, 1993-95 CCH OSHD ¶ 30,793, pp. 42,809-10
(No. 91-2973, 1995), aff’d , 89 F.3d 313, 315 (6th Cir. 1996) (affirming Commission and noting
that, in context of LOTO standard, “use of the word ‘unexpected’ connotes an element of
surprise, and there can be no surprise when a machine is designed and constructed so that it
cannot start up without giving a servicing employee notice of what is about to happen”). Under
this precedent, therefore, the LOTO standard’s use of the term “unexpected” unambiguously
refers to the potential of a machine or equipment to “energize, start up, or release stored energy
without sufficient advance notice to the employee.”

S ee Ormet Corp. , 14 BNA OSHC at 2135,
1991-93 CCH OSHD at p. 39,200. And the term does not require the Secretary to quantify the
specific risk level associated with such an event. As the Commission noted in GM , “[a]s
evidenced by the fatality that prompted OSHA’s inspection here, even momentary exposure to
equipment that has not been fully deenergized and locked out poses a significant risk of serious
harm or death.” 22 BNA OSHC at 1048, 2004-09 CCH OSHD at p. 53,627; accord Burkes
Mech ., Inc. , 21 BNA OSHC at 2142, 2004-09 CCH OSHD at p. 53,564 (finding significant risk
of serious injury or death to laborers working under conveyor that was not locked out, as
illustrated by fatality); see Int’l Union, UAW v. OSHA , 37 F.3d 665, 670 (D.C. Cir. 1994)
(rejecting pre-enforcement challenge to OSHA LOTO standard, and noting that in its
supplemental statement of reasons to its rulemaking OSHA stated that “workers face a
significant risk of material harm every time they perform service or maintenance work on
powered industrial equipment” (citing 58 Fed. Reg. 16,612, 16,620 (Mar. 30, 1993))). In any
event, the record here shows that in contrast to the equipment at issue in GM-Delco , Dayton’s
tire manufacturing equipment provided no advance warning that would affect the LOTO
standard’s applicability.

Second, even if we were to accept Dayton’s argument that the phrase “ unexpected
energization” is vague as used in the LOTO standard, a reasonable employer could determine
whether its machines are subject to unexpected energization. Indeed, such an employer could
make this determination based on facts within its knowledge, including the circumstances under
which machines could become energized and, after energization, the length and quality of any
warning prior to movement or start up of the equipment. Cf. J.A. Jones Constr. Co. , 15 BNA
OSHC at 2207, 1991-93 CCH OSHD at p. 41,026 (stating that even though “frequent” is
nonspecific term, “a reasonable person familiar with the size of the worksite and the magnitude
of the ongoing construction activity would understand how often inspections would have to be
conducted to keep track of safety hazards at the site”). We therefore reject Dayton’s vagueness
challenge.

B. Applicability

With respect to the servicing and maintenance activities at issue, Dayton argues that the
Secretary failed to prove that “ unexpected energization or start up of the machines or equipment, or release
of stored energy” could have injured its employees.

29 C.F.R. § 1910.147(a)(1)(i). Specifically, Dayton
contends that parts of the TAMs, banbury machines, and curing presses moved so slowly that
employees could avoid injury, and that TAM size-changers, radial doper attendants, and
mold/bladder changers were visible to anyone standing at the machine control panels, obviating
any risk that another employee would be unaware that servicing was in progress and activate the
machine. Dayton’s contentions are unsubstantiated.

Evidence in the record, including extensive employee testimony, details how the
machines started up and how certain machine parts moved, the employees’ proximity to those
parts during servicing or maintenance, the circumstances under which machine parts could have
moved unexpectedly, and examples of injuries that did result, or could have resulted, from the
unexpected movement of machine parts or start up of the machines. This evidence, which the
judge described in his decision and upon which he relied, fully supports his findings that injury
resulting from unexpected energization or start up of the machines was possible on the TAMs,
banbury machines, and curing presses, as well as on all of the other machines at issue.

Moreover, testimony shows that the curing presses could close more quickly than Dayton alleges
and that employees were not always able to avoid moving parts on any of the various machines.

As to employee visibility, Dayton correctly asserts that the employees performing certain
servicing or maintenance activities could be seen from one or more of the control panels. But
this did not prevent numerous instances where the employees themselves, while performing
servicing or maintenance on the TAMs, radial dopers, and curing presses, inadvertently activated
the machines during the performance of their job tasks. Nor did it prevent nearby employees or
supervisors from prematurely restarting the machines. Control of Hazardous Energy Sources
(Lockout/Tagout), 54 Fed. Reg. 36,644, 36,647-48 (Sept. 1, 1989) (final rule) (delineating causes
of inadvertent activation, including accidental movement of electrical switches, valves, or other
controls by servicing employee or any other person). Also, Dayton’s argument fails to account
for other causes of unexpected start up or release of stored energy that occurred at its facility
despite evidence in the record of numerous instances of equipment malfunctions that resulted in
the unexpected movement of machine parts on almost all of the machine types at issue.

In challenging the Secretary’s evidence, Dayton also argues that alleged instances of
unexpected energization were either not unexpected because the machine was in its automatic
mode when the instances occurred or, in two specific instances, not subject to the LOTO
standard because the activities could be performed only with the machine energized. The
Commission already considered and rejected Dayton’s first argument in Burkes Mechanical,
Inc. , 21 BNA OSHC at 2139-40, 2004-09 CCH OSHD at p. 53,562 . At issue in that case was
whether employees who cleaned debris from underneath a conveyor were covered by the
requirements of the LOTO standard where they were aware the conveyor was running while they
performed their work. Id. , 2004-09 CCH OSHD at p. 53,562. The Commission held that the
standard applied, noting that “‘[s]ervicing and/or maintenance which takes place during normal
production operations is covered’ if, inter alia , ‘[a]n employee is required to remove or bypass a
guard or other safety device . . . or where an associated danger zone exists during a machine
operating cycle.’” Id. at 2139, 2004-09 CCH OSHD at p. 53,562 ( quoting 29 C.F.R.
§ 1910.147(a)(2(ii)). Moreover, as we noted above, the Commission explained in GM that the
LOTO standard protections prescribed for servicing and maintenance activities were designed to
seamlessly dovetail with the machine guarding protections that apply during normal production
operations under 29 C.F.R. Part 1910, subpart O. GM , 22 BNA OSHC at 1022, 2004-09 CCH
OSHD at pp. 53,604-05; see Control of Hazardous Energy Sources (Lockout/Tagout), 54 Fed.
Reg. at 36,667 (“Because of the dovetailing of the requirements of this standard and the machine
guarding requirements of subpart O, protection must be provided, regardless of whether the . . .
operation is considered to be production or servicing.”). Thus, Dayton cannot evade a LOTO
violation here by showing that its exposed employees performed service and maintenance on
equipment they knew was activated where that equipment lacked necessary protective guarding.
Indeed, the fact that Dayton employees may have left machines in automatic mode to perform
certain servicing or maintenance activities merely shows that potentially hazardous energy was
not, but should have been, adequately controlled.

As to Dayton’s second argument, the Secretary recognized in the preamble “that there are
certain servicing operations which, by their very nature, must take place without deenergization,
such as operational testing of machines or equipment,” and that “[l]ocking out or tagging out
cannot be performed during these operations, since both lockout and tagout require

. . . equipment to be deenergized.” Control of Hazardous Energy Sources (Lockout/Tagout), 54
Fed. Reg. at 36,647; see GM , 22 BNA OSHC at 1041, 2004-09 CCH OSHD at p. 53,621 (noting
that LOTO standard would not apply where servicing activity requires testing equipment that is
“energized and in motion”). Here, Dayton does not dispute that most of the servicing and
maintenance activities performed by its employees did not require the machines to remain
energized. But it claims that certain servicing activities that employees performed on the TAMs
and curing presses required energization.

We find the record establishes that, although the TAMs had to be energized while the
size-changer made various adjustments to the machine and then produced a set of check tires,
energization was unnecessary when the size-changer removed and installed machine parts during
a tooling change. Also, regardless whether it was feasible to lockout the curing presses during a
mold change, evidence in the record shows the presses could be deenergized and locked out
during a PCI ring change. We thus conclude that employees working on each of these two
machines performed at least one servicing or maintenance activity that did not require
energization. See GM, 22 BNA OSHC at 1042, 2004-09 CCH OSHD at p. 53,622 (finding
LOTO applied during troubleshooting operation, as evidence showed employee “was in the
process of performing a servicing activity while the [machine] was stationary and for which
deenergization and use of LOTO were possible but not used”).

Finally, Dayton argues that the machines referenced in the citation were incapable of
unexpectedly energizing because an employee had to “engage in several steps in order to cause
the equipment to move.” Evidence in the record shows, however, that after deenergization, a
single individual could have restarted the machines at issue within a matter of seconds. Burkes
Mech., Inc. , 21 BNA OSHC at 2139 n.4, 2004-09 CCH OSHD at pp. 53,561-62 n.4 (noting that
deactivated machines at issue in GM-Delco were not covered by LOTO standard because they
had “specific precautions designed to ensure employees had adequate notice to get out of the
way before start-up occurred,” whereas the conveyor in Burkes was covered by standard because
it was “neither deactivated nor ‘designed and constructed’ to eliminate unexpected
energization”). Moreover, the proposition that a multi-step startup process rendered these
machines incapable of unexpected energization is undermined by the specific and numerous
examples in the record of the machines unexpectedly energizing during servicing and
maintenance.

Accordingly, we conclude that the Secretary has established applicability of the
LOTO standard’s requirements because the employees performing servicing or maintenance
activities on the different types of machines at issue could have been injured by the “ unexpected
energization or start up of the machines or equipment, or release of stored energy .” 29 C.F.R.
§ 1910.147(a)(1)(i).

II. The LOTO Standard: Minor Servicing Exception

Dayton contends that most of the “service and maintenance” work its employees
performed falls within an exception to the LOTO standard’s applicability and, alternatively,
contends this exception is sufficiently vague to render the entire standard unenforceable. Dayton
carries the burden of proof on these issues. See Kaspar Wire Works, Inc ., 18 BNA OSHC 2178,
2194, 2000 CCH OSHD ¶ 32,134, p. 48,420 (No. 90-2775, 2000) (“The Commission has
repeatedly held . . . that ‘the party claiming the benefit of an exception to the requirements of a
standard has the burden of proof of its claim.’” (citation omitted)), aff’d , 268 F.3d 1123 (D.C.
Cir. 2001); Westvaco Corp. , 16 BNA OSHC 1374, 1377-78, 1993-95 CCH OSHD ¶ 30,201, pp.
41,567-68 (No. 90-1341, 1993) (noting that employer bears burden of proving minor servicing
exception’s applicability); Gen. Motors Corp., Electro-Motive Div ., 14 BNA OSHC 2064, 2067
n.14, 1991-93 CCH OSHD ¶ 29,240, p. 39,167 n.14 (No. 82-630, 1991) (consolidated) (holding
in enforcement proceeding that employer bears “burden of proving the invalidity of a cited
standard”).

Under the LOTO standard, servicing or maintenance that takes place “during normal
production operations” is covered by the standard only if (1) “[a]n employee is required to
remove or bypass a guard or other safety device,” or (2) “[a]n employee is required to place any
part of his or her body into an area on a machine or piece of equipment where work is actually
performed upon the material being processed . . . or where an associated danger zone exists
during a machine operating cycle.” 29 C.F.R. § 1910.147(a)(2)(ii). Additionally, an exception
to this particular provision, known as the “minor servicing exception,” states that:

Minor tool changes and adjustments, and other minor servicing activities, which
take place during normal production operations, are not covered by this standard
if they are routine, repetitive, and integral to the use of the equipment for
production, provided that the work is performed using alternative measures which
provide effective protection (See subpart O of this part) .

29 C.F.R. § 1910.147(a)(2)(ii) (note).

On review, Dayton claims that the LOTO standard’s minor servicing exception is
unenforceably vague and, alternatively, that certain work activities being performed by its
employees fall within the exception. For the following reasons, we reject both arguments.

A. Vagueness

Dayton argues that the word “minor” and the phrase “alternative measures which provide
effective protection,” as used in the minor servicing exception, are so vague as to render the
LOTO standard unenforceable. As we noted above, a claim that a standard is vague is assessed
not in the abstract, but in the particular factual context. Faultless , 674 F.2d at 1185. “Moreover,
the [standard] will pass constitutional muster even though [it is] not drafted with the utmost
precision; all that due process requires is a fair and reasonable warning.” Id. ; cf. Pitt-Des
Moines, Inc. , 168 F.3d 976, 987 (7th Cir. 1999) (holding that “[t]he addition of an alternative,
less specific means of compliance does not make the regulation unconstitutionally vague,” and
that employer relying on alternative “did so at its peril”).

We conclude that the challenged elements of the minor servicing exception are
necessarily broad enough to cover the myriad servicing activities to which the LOTO standard
might apply. Cargill, Inc. , 15 BNA OSHC 2149, 2152, 1991-93 CCH OSHD ¶ 29,941, p.
40,912 (No. 90-3191, 1993) (“[T]he due process clause does not impose drafting requirements of
mathematical precision or impossible specificity.”); J.A. Jones Constr. Co. , 15 BNA OSHC at
2205, 1991-93 CCH OSHD at p p. 41,024-25 (noting that Secretary needs to draft standard only
“‘with as much exactitude as possible in light of the myriad conceivable situations which could
arise and which could be capable of causing injury’” (citation omitted)). Moreover, we conclude
that a reasonable employer in the tire manufacturing industry could determine what constitutes
“effective” alternative protection, given that the stated purpose of the LOTO standard is to
prevent injury that could result from “unexpected energization or start up of the machines or
equipment, or release of stored energy.” 29 C.F.R. § 1910.147(a)(1)(i); see J.A. Jones Constr.
Co. , 15 BNA OSHC at 2206, 1991-93 CCH OSHD at p. 41,025 . This link to the standard’s
purpose is reinforced by the exception’s cross-reference to “subpart O of this part,” which
prescribes machine guarding requirements. 29 C.F.R. § 1910.147(a)(2)(ii) (note). As such, a
reasonable employer could determine, based on knowledge of its employees’ specific servicing
activities and the machines upon which they work, what alternative measures would achieve this
purpose and, thus, provide effective protection. See J.A. Jones Constr. Co. , 15 BNA OSHC at
2206, 1991-93 CCH OSHD at p. 41,025 . We therefore reject Dayton’s vagueness challenge.

B. Applicability

Dayton argues that the servicing and maintenance activities performed by employees on
the beadwinder machines, radial dopers, banbury machines, module machines, tread tubers and
Dayton loaders are all covered by the minor servicing exception. To prove that a servicing or
maintenance activity falls within this exception, an employer must show that (1) the tool changes
and adjustments, or servicing activities, were minor; (2) they were performed during normal
production operations; and (3) effective alternative protection was provided. Westvaco Corp. , 16
BNA OSHC at 1378, 1380, 1993-95 CCH OSHD at pp. 41,568, 41,570.

Initially, as described in Dayton’s own “Job Evaluation Form” entered into evidence, part
of the beadwinder operator’s job is to “[s]et up” the beadwinder machine for production of a
different-sized bead, a work activity that we find clearly meets the standard’s definition of
“setting up.” 29 C.F.R. § 1910.147(b) (defining “setting up” as “[a]ny work performed to
prepare a machine or equipment to perform its normal production operation”). Moreover, by
definition, “setting up” occurs before normal production operations and, therefore, cannot fall within the minor
servicing exception. Westvaco Corp. , 16 BNA OSHC at 1379-80, 1993-95 CCH OSHD at pp.
41,569-70.

As for the other servicing and maintenance activities Dayton claims were performed
during normal production operations, Dayton has not demonstrated that any of these activities
were “performed using alternative measures which provide effective protection.” 29 C.F.R.

§ 1910.147(a)(2)(ii) (note). Dayton points out that its machines were equipped “with numerous
safety features, including emergency stop devices, safety ropes, and a wide variety of guarding
devices.” To the extent Dayton claims that use of emergency stop devices and safety ropes were
“alternative measures,” we find that these measures were ineffective. As we previously noted,
evidence in the record shows that, during servicing and maintenance, employees working at the
machines could inadvertently activate them, or nearby employees or supervisors could
prematurely restart them. And evidence shows that, in some cases, such energization did in fact
occur. See Control of Hazardous Energy Sources (Lockout/Tagout), 54 Fed. Reg. at 36,648
(“The generally accepted best means to minimize the potential for inadvertent activation is to
ensure that all power to the machine or equipment is isolated, locked or blocked and dissipated at
points of control, using a method that cannot readily be removed, bypassed, overridden or
otherwise defeated.”). With respect to guarding, which is explicitly contemplated as a form of
“alternative protection” under the minor servicing exception, 29 C.F.R. § 1910.147(a)(2)(ii)
(note), Dayton has not shown that any guarding provided on the beadwinder machines, radial
dopers, banbury machines, module machines, tread tubers or Dayton loaders would have
protected employees during their performance of servicing and maintenance activities. Indeed,
given the nature of some of these activities—the removal and installation of grinding stones on
the module machine, for example—it would have been impossible for guarding to provide any
protection. In these circumstances, we conclude Dayton did not establish that these activities fall
within the minor servicing exception.

Based on the foregoing factual evidence and legal analysis, we conclude that Dayton’s
employees performed servicing and maintenance activities to which the LOTO standard applied
during the period covered by the citation. Moreover, Dayton’s failure to utilize LOTO for these
activities, and its actual knowledge thereof, is undisputed.

III. Infeasibility Defense

Dayton argues that compliance with the LOTO standard was infeasible for certain
servicing and maintenance activities performed on the TAMs and curing presses. To prove the
affirmative defense of technological infeasibility, an employer must show that “‘(1) literal
compliance with the terms of the cited standard was infeasible under the existing circumstances
and (2) an alternative protective measure was used or there was no feasible alternative
measure.’” Westvaco Corp. , 16 BNA OSHC at 1380, 1993-95 CCH OSHD at p. 41,570 (citation
omitted); State Sheet Metal Co., 16 BNA OSHC 1155, 1160, 1993-95 CCH OSHD ¶ 30,042, p.
41,226 (No. 90-1620, 1993) (consolidated).

With respect to the TAMs, Dayton claims that a size-changer’s duties could not be fully
performed without power and, therefore, Dayton could not feasibly comply with the LOTO
standard. The record shows, however, that the TAM size-changers performed a number of
different tasks, some of which required deenergization and others that did not. Although Dayton
established that the TAM needed to be energized in order to make necessary adjustments to
certain parts and to produce check tires, Dayton does not refute the Secretary’s rebuttal
testimony showing that beginning in July 1994, size-changers started locking out the TAMs
before performing the tooling changes that are necessary to equip the machine for production of
a different size tire. Indeed, several employees working as size-changers admitted that, during a
tooling change, the various machine parts could be changed out while the TAM was
deenergized. Dayton has therefore failed to establish that locking out the TAM during a tooling
change was infeasible.

With respect to the curing presses, Dayton claims that it was not feasible to comply with
the LOTO standard during mold and bladder changes. Dayton relies on the testimony of the
curing department’s production supervisor, who testified that electrical and pneumatic energy
sources would have to be locked out twenty-seven times to complete one such change, which
would increase by five hours the time necessary to accomplish this task. The judge
characterized Dayton’s argument as a claim of economic infeasibility, and rejected it based on
his finding that Dayton failed to present evidence that instituting LOTO procedures for the
curing presses would threaten the company’s long-term profitability and competitiveness.

Dayton produced no evidence to show that the increased length of time necessary for a
mold change would have had a “severe adverse economic effect” on the company. See State
Sheet Metal Co., 16 BNA OSHC at 1161, 1993-95 CCH OSHD at p. 41,227 (noting that
compliance was not economically infeasible where employer failed to demonstrate that
complying with standard would have “severe adverse economic effect”); accord Peterson Bros.
Steel Erection Co ., 16 BNA OSHC 1196, 1203, 1993-95 CCH OSHD ¶ 30,052, p. 41,303 (No.
90-2304, 1993) (considering what effect compliance would have on company’s “financial
position as a whole” to determine whether company would be “adversely affected”), aff’d , 26
F.3d 573 (5th Cir. 1994). In fact, in contrast to the production supervisor’s testimony, a
mold/bladder changer testified that he deenergized and locked out the curing press as few as nine
times during the mold change process, which would significantly decrease the length of time
required to complete the task and further undermines Dayton’s infeasibility argument.

But even if Dayton had established that it was economically infeasible to lock out the
electrical and pneumatic energy sources on the curing press during a mold change, it produced
no evidence that the steam and hot water powering the bladders would also have to be locked out
multiple times. Thus, at the very least, energy control procedures could have been used to
protect mold/bladder changers from the burns that sometimes occurred during bladder changes.
And Dayton never argues that locking out the curing press during a PCI ring change, another one
of the size-changers’ responsibilities, was technologically or economically infeasible. We thus
conclude that Dayton has failed to establish that it was infeasible to lock out the curing presses
during the mold/bladder changers’ servicing and maintenance activities.

IV. Per-Instance Citations

The Secretary cited Dayton on a per-machine-type basis for violating § 1910.147(c)(4)(i),
the LOTO standard’s energy control procedure provision, and on a per-employee basis for
violating § 1910.147(c)(7)(i), the standard’s initial training provision. Dayton challenges the
Secretary’s decision to cite more than one violation of each of these provisions.

For the reasons
that follow, we conclude that it was permissible for the Secretary to cite Dayton for these
violations on a per-instance basis.

A. Energy Control Procedures

i. Susceptibility of Standard to Per-Instance Citation

It is well established under Commission precedent that “‘per-instance violations and
penalties are appropriate when the cited regulation or standard clearly prohibits individual acts
rather than a single course of action.”’ GM , 22 BNA OSHC at 1046, 2004-09 CCH OSHD at p.
53,625 (citations omitted). “‘The key . . . [is] the language of the statute or the specific standard
or regulation cited.”’ Id. , 2004-09 CCH OSHD at p. 53,625 (citation omitted). The “unit of
violation must reflect the substantive duty that a standard imposes.” E. Smalis Painting Co. , 22
BNA OSHC 1553, 1581 (No. 94-1979, 2009 ); accord Nat’l Assoc. of Home Builders v. OSHA ,
602 F.3d 464, 467 (D.C. Cir. 2010) (“The unit of prosecution is derived from the duty set forth
in the Secretary’s standard.”).

The provision at issue here, § 1910.147(c)(4)(i), requires that “[p]rocedures . . . be
developed, documented and utilized for the control of potentially hazardous energy when
employees are engaged in the activities covered by this section.” The LOTO standard specifies
that in developing and documenting an energy control procedure, the employer must “clearly
and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for
the control of hazardous energy, and the means to enforce compliance,” and include the
following information:

(A) A specific statement of the intended use of the procedure;

(B) Specific procedural steps for shutting down, isolating, blocking and securing
machines or equipment to control hazardous energy;

(C) Specific procedural steps for the placement, removal and transfer of lockout
devices or tagout devices and the responsibility for them; and

(D) Specific requirements for testing a machine or equipment to determine and
verify the effectiveness of lockout devices, tagout devices, and other energy
control measures.

29 C.F.R. § 1910.147(c)(4)(ii). The Secretary explained in the preamble why she used the term
“specific” in describing a properly developed and documented energy control procedure:

In this final standard, OSHA has retained the word “specific” when detailing the
elements of the [energy control] procedure. This was done to emphasize the need
to have a detailed procedure, one which clearly and specifically outlines the steps
to be followed. The procedure must detail that information which the authorized
employees must know to accomplish the lockout or tagout. Overgeneralization
can result in a document which has little or no utility to the employee who must
follow the procedure. However, whereas the procedure is required to be written
in detail, this does not mean that a separate procedure must be written for each
and every machine or piece of equipment. Similar machines and/or equipment
(such as those using the same type and magnitude energy) which have the same or
similar types of controls can be covered with a single procedure.

Control of Hazardous Energy Sources (Lockout/Tagout), 54 Fed. Reg. at 36,670, amended by 55
Fed. Reg. 38,677, 38,681 (Sept. 20, 1990) (final rule). The Secretary further explained that “the
employer’s procedures may not need to be unique for a single machine or task, but can apply to a
group of similar machines, types of energy and tasks if a single procedure can address the
hazards and the steps to be taken satisfactorily.” Id. (emphasis added). Accordingly, although
an employer may develop and document a single energy control procedure for machines that
have “the same type and magnitude of energy” and “the same or similar types of controls,”
separate procedures would be necessary when there are no such similarities. Id. And the
language of § 1910.147(c)(4)(i) specifically ties the duty to develop, document, and utilize
LOTO procedures to the servicing and maintenance of particular “machines and equipment.” 29
C.F.R. § 1910.147(a)(1)(i) (noting that LOTO standard covers servicing and maintenance of
“machines and equipment”).

We have previously affirmed the Secretary’s use of per-instance citation authority in a
variety of analogous situations. For example, the Commission has long held that it is
permissible for the Secretary to cite multiple violations of the same fall protection standard
based on different places of occurrence. Major Constr. Corp. , 20 BNA OSHC 2109, 2110-11,
2004-09 CCH OSHD ¶ 32,860, p. 53,041 (No. 99-0943, 2005) (affirming multiples instances of
fall protection standards based on different times or places of occurrence); MJP Constr. Co. , 19
BNA OSHC 1638, 1647, 2001 CCH OSHD ¶ 32,484, p. 50,036 (No. 98-0502, 2001) (affirming
multiple instances of fall protection violations occurring on different dates), aff’d , 56 Fed. App.
1 (D.C. Cir. 2003). In J.A. Jones Constr. Co. , the Commission held that the Secretary could
permissibly cite separate violations for each instance of violative fall protection where each
alleged instance involved a different floor or even a different location on a floor. 15 BNA
OSHC at 2212-13, 1991-93 CCH OSHD at p p. 41,031-33 .

Here, the Secretary cited Dayton for six separate violations of § 1910.147(c)(4)(i), which
requires the development, documentation, and use of LOTO procedures, based on her
determination that each alleged violation relates to a unique type of machine or piece of
equipment located in a separate department. We find the Secretary’s approach in issuing these
citations on a per-instance basis is consistent with the duty imposed under the language of the
standard and its preamble, and with our precedent. Accordingly, we conclude the cited standard
is susceptible to per-instance citation.

ii. Number of Procedures Cited

The Commission has previously examined whether a single LOTO procedure can
adequately guide servicing and maintenance personnel to shut down and lock out machines or
equipment that are differently configured, have multiple energy sources, or are particularly
complex. In Drexel Chemical Co. (“ Drexel ”), the Commission noted that Drexel had both
electrically driven machines and an airmill driven by an air compressor. 17 BNA OSHC 1908,
1913, 1995-97 CCH OSHD ¶ 31,260, p. 43,876 (No. 94-1460, 1997). In light of these
differences in power sources and resulting differences in lockout procedures, the Commission
concluded that “[b]ecause the standard requires the lockout procedures for each type of machine
to be specifically defined and because there are different types of machines at the plant, Drexel
must have more than one lockout procedure.”

Id. , 1995-97 CCH OSHD at p. 43,876. Similarly,
in GM , the Commission held that GM’s single procedure was “inadequate with respect to the
plant’s more complex equipment,” and was particularly ineffective for employees attempting to
utilize LOTO before servicing the particular piece of equipment at issue. 22 BNA OSHC at
1027, 2004-09 CCH OSHD at p. 53,609.

Here, there is extensive, detailed evidence in the record showing that all seven of the
cited machine types are extraordinarily complex, vary in size and configuration, and have
different combinations of energy sources, as follows:

·     The beadwinder machine measures approximately 40 feet long, 8 feet wide, and 12
feet high, and includes large wire reels, an extruder, auger, chuck, and pulleys. It
uses both pneumatic and electrical energy, along with gravity-driven stored energy,
and has multiple control panels and control boxes.           

·     The TAM operates either in-line or on a swing arm depending on the particular
machine style, and includes parts that grab, transfer, and stitch the tire. It uses
electrical, pneumatic, hydraulic, and/or nitrogen-assisted hydraulic energy, and has
up to two control panels.   

·     The radial doper, the primary component of which is a clamp arm that transports and
spins the tire, uses electrical and pneumatic energy, and has three control panels.       

·     The curing press includes PCI rings, inflatable bladders, and two massive metal
molds that can be removed only with the assistance of a forklift. It uses electrical,
pneumatic, and steam energy, and has control panels on the front and back of the
machine.    

·     The banbury machine occupies three floors of the plant and has an entire room
dedicated solely to controlling its machinery. It includes rollers, a mixer, a knife, an
auger and conveyors, and uses electrical, hydraulic, and pneumatic energy.       

·     The tread tuber and Dayton loader include mills, extruders, conveyors and a knife.
The machinery uses electrical energy and has numerous control panels.              

·     The module machine measures approximately 25 yards long, 8 feet wide, and 16 feet
high and is comprised of several independently operating pieces of machinery
attached by conveyor, and includes grinding stones and chucks. It uses hydraulic,
pneumatic, and electrical energy, and has multiple control panels.           

Indeed, this evidence satisfies the very criteria identified by our dissenting colleague as
necessary to support per-instance citations: that the machines do not have “‘the same or similar
types of controls’” or “‘the same type and magnitude [of] energy,’” and “a single procedure
would not satisfactorily ‘address the hazards and the steps to be taken.’” (Citation omitted.)

In light of the evidence in the record establishing the enormous complexity of each of
these machines and the specifically enumerated differences in their configuration, energy
sources and control mechanisms, we find the Secretary has shown that, at a minimum, each of
the cited machine types would require its own procedure in order to “detail that information
which the authorized employees must know to accomplish the lockout or tagout .” Control of
Hazardous Energy Sources (Lockout/Tagout), 54 Fed. Reg. at 36,659, 36,670, amended by 55
Fed. Reg. at 38,678, 38,681 (noting also that “amount of detail in an employer’s procedure will
depend on the complexity of the machine”).

Accordingly, based on the parties’ stipulations and other record evidence, we find that
the Secretary has established that Dayton had a duty to develop, document, and utilize six
separate LOTO procedures for the cited machine types and that each cited failure to develop,
document, and use such procedures was a separate violation.

Moreover, although Dayton
challenged the validity of the Secretary’s “willful/egregious policy,” it did not dispute or rebut
the Secretary’s prima facie case by arguing or showing that the machines were similar enough
that a “one size fits all” procedure would have been adequate for all of the cited machine types.
Indeed, Dayton notes that “the Secretary could properly cite Dayton (if at all) for no more than
seven violations of the LOTO standard—the violations resulting from its alleged ‘primary’
failure to develop proper energy control procedures with respect to seven pieces of equipment.”

Thus, the Secretary has made out an unrebutted prima facie case that based on (1) the
operational complexities of the different machine types, (2) the widely varying nature of the
energy sources powering them, and (3) the numerous means by which the machines are
controlled, Dayton was required to develop, document, and utilize unique energy control
procedures for each machine type at issue. Therefore, we conclude that the Secretary
permissibly cited § 1910.147(c)(4)(i) on a per-machine-type basis, and we separately affirm
Items 1 through 6.

B. Training

Section 1910.147(c)(7)(i) requires that employers “provide training to ensure that the
purpose and function of the energy control program are understood by employees and that the
knowledge and skills required for the safe application, usage, and removal of the energy controls
are acquired by employees.” In GM , the Commission held that the same specific language in
§ 1910.147(c)(7)(i) “identifies the subject of the training obligation as ‘[e]ach authorized
employee.’” 22 BNA OSHC at 1047, 2004-09 CCH OSHD at p. 53,626. The Commission thus
concluded that § 1910.147(c)(7)(i) is “susceptible to per-employee citation” because, “regardless
whether an employer chooses to provide required training to employees individually or
collectively, the duty runs to each employee and, under the wording of the standard, any failure
to train would be a separate abrogation of the employer’s duty to each untrained employee.” Id.
at 1046-47, 2004-09 CCH OSHD at p. 53,626; see E. Smalis Painting Co. , 22 BNA OSHC at
1580-81 (overruling determination in Eric K. Ho , 20 BNA OSHC 1361, 1373-75, 2002 -04 CCH OSHD
¶ 32,692, pp. 51,583-84 (No. 98-1645, 2003) (consolidated), aff'd sub nom. Chao v. OSHRC , 401
F.3d 355 (5th Cir. 2005), that asbestos training standard was not susceptible to per-employee
citation). As the same training provision is at issue here, the Commission’s analysis in GM is
equally applicable. We thus separately affirm Items 9 through 12, 14 through 17, 20 through 30,
32 through 48, 50 through 83, 86, 87, 89 through 98, 100 through 106, and 108.

V. Characterization

“The hallmark of a willful violation is the employer’s state of mind at the time of the
violation—an ‘intentional, knowing, or voluntary disregard for the requirements of the Act or . .
. plain indifference to employee safety.’” Kaspar Wire Works, Inc. , 18 BNA OSHC at 2181,
2000 CCH OSHD at p. 48,406 (citation omitted).

[I]t is not enough for the Secretary to show that an employer was aware of
conduct or conditions constituting the alleged violation; such evidence is already
necessary to establish any violation . . . . A willful violation is differentiated by
heightened awareness of the illegality of the conduct or conditions and by a state
of mind of conscious disregard or plain indifference . . . .

Hern Iron Works, Inc. , 16 BNA OSHC 1206, 1214, 1993-95 CCH OSHD ¶ 30,046, pp. 41,256-57 (No. 89-433, 1993). This state of mind is evident where “‘the employer was actually aware,
at the time of the violative act, that the act was unlawful, or that it possessed a state of mind such
that if it were informed of the standard, it would not care.’” AJP Constr. Inc. v. Sec’y , 357 F.3d
70, 75 (D.C. Cir. 2004) (emphasis and citations omitted). “An employer’s motive for failing to
comply with the Act’s requirements, however, need not be evil or malicious in order to find a
violation willful.” Kaspar Wire Works, Inc. , 18 BNA OSHC at 2181, 2000 CCH OSHD at p.
48,407. But a willful characterization is not justified if an employer has “‘ a good faith, albeit
mistaken, belief that particular conduct is permissible.’” Manganas Painting Co. , 21 BNA
OSHC 1964, 1991, 2004-09 CCH OSHD ¶ 32,908, p. 53,406 (No. 94-0588, 2007) (citation
omitted).

The extensive record before us reveals that over a period of years, Dayton consciously
disregarded the LOTO standard by operating its tire production line in a manner that was
patently inconsistent with the requirements of the standard, and by failing to reexamine its
violative practices despite receiving information and inquiries that should have led it to do so.
This disregard began with safety manager Phillip McCowan and continued with his successor,
Kelley Mattocks. As explained in detail below, Dayton’s safety managers initially made flawed
assessments of the job tasks that employees performed and then blatantly ignored numerous
admonitions and instructions to reassess the job tasks and the resulting need to provide LOTO
protection to their employees. Therefore, for the reasons that follow, we characterize all of the
affirmed violations as willful.

McCowan, who joined Dayton in the early 1970’s, served as Dayton’s safety manager at
the time the LOTO standard was promulgated. In 1989, McCowan received a corporate-wide memorandum
from the safety director of Dayton’s parent company, Firestone, alerting all safety engineers to the requirements of
the new LOTO standard. In response to this memorandum, McCowan made an initial determination that Dayton
employees did not perform servicing and maintenance within the meaning of the LOTO standard, and therefore
Dayton did not have to implement energy control procedures, provide locks, or train its employees at the authorized
level. In contrast, McCowan concluded it was Ogden Allied, the company to which Dayton had contracted some of
its maintenance work,

that was required to implement the full gamut of LOTO procedures pursuant
to the standard.

According to McCowan, he reached this decision after: (1) reading the LOTO
standard and discussing it with the corporate safety director, safety engineers at other Dayton
plants, and Ogden Allied; (2) considering each job classification and safe operating procedure at
the plant; and (3) reviewing the plant’s OSHA 200 logs for injuries that were “caused by
unexpected energy sources.” McCowan reasoned that none of Dayton’s own employees should
be classified as authorized because, in his view, none of their job tasks constituted servicing or
maintenance within the standard’s definition, but instead were “minor tool changes and
adjustments” that took place during normal production operations within the standard’s minor
servicing exception, § 1910.147(a)(2)(ii) (note). He also concluded that the job tasks did not
subject Dayton employees to the hazard of “unexpected energization” within the meaning of the
standard because the employees performed “one-man jobs,” were in “complete control” of their
machines, and were provided with safety ropes.

We find that McCowan’s conclusions regarding the applicability of the LOTO standard
to Dayton employees were plainly erroneous, and his adherence to them strains credulity.  First,
many of the tasks described in Dayton’s job evaluation forms, which McCowan himself
prepared, fall squarely within the standard’s definition of “servicing and/or maintenance.” The
listed tasks include setting up, trouble shooting, tearing down, repairing, “performing required
maintenance to restore to working condition,” adjusting equipment, and removing and installing
various machine parts. 29 C.F.R. § 1910.147(b) (defining “[s]ervicing and/or maintenance).
Given McCowan’s first-hand knowledge of the plant floor operations, his decades of experience
at the plant, and his own description in the job evaluation forms of tasks that Dayton employees
performed, we cannot fathom how McCowan could have concluded that the job tasks performed
by Dayton employees and those performed by Ogden Allied were so perfectly divided between
production on the one hand, and servicing and maintenance on the other. And any reliance on
the 1969 contract with Ogden Allied to explain or justify this purported division of labor is
belied by the contract itself, which explicitly reserved to Dayton the right to perform any or all
maintenance work with its own personnel. Moreover, it would have been difficult to read the
Firestone memorandum and still conclude that Dayton employees were excluded from LOTO
coverage because their maintenance and servicing occurred “during normal production
operations.” Indeed, the memorandum expressly states that such excepted work “would be
covered under OSHA’s machine guarding standards,” which Dayton did not follow. Thus, from
the LOTO standard’s inception, McCowan’s faulty analysis and unsupportable conclusions
forced Dayton down a path of noncompliance with the standard’s fundamental requirements.

In September 1989, Dayton hired Mattocks to work alongside McCowan as a junior
safety engineer. Mattocks had recently graduated from college with a degree in industrial safety,
and when McCowan was given other duties in April 1990, Dayton assigned her to replace him.
Mattocks then had primary responsibility for OSHA compliance at the plant and, in December
1992, she became the sectional manager for safety, security and fire protection and continued in
her role as plant-wide safety manager through the period covered by the citation. Although
Mattocks reported to Dayton’s human resources manager, ultimate responsibility for safety
within the plant rested with her. Mattocks often consulted with Robert Walker, the director of
health, safety and industrial hygiene for Bridgestone/Firestone, but he had no supervisory
authority over her and thus acted only in an advisory capacity.

At the hearing, Mattocks testified that McCowan “instructed [her] in the operations of the
machine[s] and what the responsibilities of the employees were,” and that she spent time on the
shop floor—initially “every day”—“to become familiar with all ten departments.” Indeed, she
stated that “within the first couple of months [she] felt like [she] had a . . . fair working
knowledge of all of the jobs in the plant.” Nonetheless, Mattocks’s testimony was somewhat
imprecise as to whether she had personally observed the particular job tasks at issue here, but she
certainly knew of them based on her admitted review of the written descriptions in Dayton’s job
evaluation forms and safe operating procedures directives. Moreover, she acknowledged that
she had read the LOTO standard around the time she was hired by Dayton in the fall of 1989,
and had read the preamble at some point. Although Mattocks admitted that she could not recall
ever having had an in-depth conversation with McCowan regarding his LOTO compliance
assessment for the plant, she nonetheless adopted and perpetuated his approach without ever
conducting her own assessment of the LOTO standard’s applicability to Dayton’s employees.

Indeed, even though the minor servicing exception explicitly refers the reader to OSHA’s
machine guarding standard, 29 C.F.R. § 1910.147(a)(2)(ii) (note), Mattocks did not recall taking
even the “initial step” of looking at that provision before deferring to McCowan’s conclusions
regarding Dayton’s compliance with the LOTO standard.

Beginning in 1992, however, at least five separate events confronted Mattocks with
concerns and warnings about LOTO compliance at the Dayton plant. On those occasions,
Mattocks was either explicitly instructed to review the LOTO standard’s application to Dayton’s
operations or concerns were raised with her that should have prompted such a review. Because
of the significance of these incidents to our conclusion regarding the characterization of the
violations at issue here, we discuss each in some detail.

1992 – Safety Consultant and Corporate LOTO Memorandum

Questions about Dayton’s LOTO compliance were first brought to Mattocks’s attention
in August 1992, when Dayton retained John Lepkowski, Bridgestone/Firestone’s recently retired
corporate safety officer, to provide affected-level LOTO training to Dayton employees.
Following the training session, some concerns were raised about “whether employees
performing mold changes on curing presses, size changes on [TAMs], and grinding stone
replacements on [module] machines should continue to be treated as ‘affected’ employees,” an
issue which Mattocks specifically discussed with Lepkowski and the union representative. And
second, just a few months later, Robert Walker, the new Bridgestone/Firestone director of health,
safety, and industrial hygiene, sent a strongly worded memorandum to Mattocks and other
Bridgestone/Firestone safety personnel in which he issued the following admonition regarding
the LOTO standard:

During a recent audit by a major customer, one of our plants was found in non-compliance with OSHA’s lockout standard. I also recently talked with a plant
engineering associate who was unaware of the requirements of the standard. Both
situations are cause for concern . . . . Please revisit your plant’s practice
regarding this very important, fundamental safety procedure. Remember, this
standard has been in effect for over two years, so you will have little defense for
non-compliance in the event of an OSHA citation, and OSHA is aggressively
enforcing this standard. Furthermore, and of greater importance, compliance with
this [standard] will lessen the risk to our associates.

Walker attached a sample LOTO procedure, a copy of the LOTO standard, and OSHA’s LOTO
enforcement directive to this memorandum. In response, Mattocks simply asked Dayton’s
various production supervisors whether the nature of any of the jobs performed by Dayton
employees had changed since McCowan had first determined that all of those employees should
be classified as affected. Receiving no indication from supervisors that any of the jobs had
changed, she ended her inquiry and took no further action.

Mattocks made no attempt to assess
whether McCowan’s original determination was correct.

May through September 1993 – OSHA Ergonomics Inspection

The third event occurred after OSHA commenced a lengthy ergonomics inspection of Dayton’s
plant in May 1993. See  

Dayton Tire, Div. of Bridgestone/Firestone, Inc. , 18 BNA OSHC 1225, 1998 CCH OSHD
¶ 31,515 (No. 93-3327, 1998) (ALJ). Mattocks conceded that she and CO Kearney, who conducted the
ergonomics inspection, discussed LOTO issues at least three times between May and September 1993. Mattocks
admitted that during these conversations, Kearney “suggested that [the plant had] some opportunities” with respect
to LOTO, and “we should look at [LOTO] again.” However, in contrast to Kearney’s account of the conversations,
Mattocks testified that Kearney spoke “more in generalities” and “[t]here were no specifics directed at us in terms of
what it would be that we would do.” Mattocks also testified that “[o]n a couple of occasions [CO Kearney] inquired
as to our program. And I provided some instruction to her as to how we were structured, how we recognized our
employees, the relationship that we had with our contractor, who provided servicing and maintenance.” Indeed,
Mattocks acknowledged that Kearney had requested and received a copy of Dayton’s LOTO program. Moreover,
Kearney’s testimony that she requested, received, and reviewed Dayton’s job evaluation forms, which she stated
“describe[d] maintenance and service” tasks “in accordance with the standard,” is unrebutted. Mattocks denied,
however, that Kearney had discussed LOTO-related hazards regarding specific machines. She also denied
discussing the application of LOTO in a conference call with Kearney.

Kearney’s recollection of her conversations with Mattocks was quite different and more detailed.

Kearney testified that during the course of her inspection, she pointed out to Mattocks specific LOTO hazards
involving several machine types. According to Kearney, Mattocks responded by asserting that the employees were
“not doing service and maintenance; that Ogden Allied performed service and maintenance on the equipment; and
that Dayton employees are affected employees.”

Kearney also testified that around October 1, 1993, she held a
conference call with Mattocks, another OSHA CO, and another Dayton official, in which she impressed upon
Mattocks her concerns about LOTO compliance in the areas of the plant she had pointed out during two “walk
arounds,” and reiterated that there was a need to reevaluate the LOTO program as it related to certain machinery.
Finally, Kearney’s testimony that she again mentioned her LOTO concerns to Mattocks at the closing conference,
and told Mattocks she was referring those concerns to an OSHA safety specialist, is unrebutted.

The record contains evidence showing that Kearney took certain actions during the
inspection that lend credibility to her version of events. For example, the record establishes that
Kearney raised concerns about Dayton’s LOTO compliance with her supervisor and the OSHA
Area Director at the time her inspection was ongoing in June 1993. Furthermore, in early July
1993, she prepared an OSHA worksheet describing what she believed to be willful violations of
the LOTO standard specifying four of the seven machine types that are at issue here.  Asked to
explain the willful characterization, Kearney testified that she concluded Dayton’s actions
showed plain indifference to the standard based on Mattocks’s failure to take any corrective
action in response to Kearney’s identification of LOTO hazards.

Finally, immediately
following the October 1993 accident, Kearney submitted the referral that formed the basis of
OSHA’s LOTO inspection.  In that referral, which was admitted into evidence, Kearney
described LOTO hazards in the six departments that are the foundation of this case. 

In these circumstances, we reject Mattocks’s testimony that Kearney spoke “more in
generalities” about “some opportunities” in LOTO, and that a conference call that included a
conversation about LOTO never occurred . We find Kearney’s testimony, which was specific,
direct, and corroborated by her actions, to be more credible than Mattocks’s testimony.   See
Waste Mgmt. of Palm Beach, 17 BNA OSHC 1308, 1309-10, 1995-97 CCH OSHD ¶ 30,841, p.
42,892 (No. 93-128, 1995) (declining to defer to judge’s findings that were not based on
“demeanor or [factors] peculiarly observable by the hearing judge[,]” and resolving conflict in
testimony based on other record evidence). But even if we were to credit only Kearney’s
unrebutted and/or corroborated testimony, we find that she specifically alerted Mattocks to
possible LOTO violations involving Dayton employees. As she had on previous occasions,
Mattocks simply dismissed these warnings, and made no attempt to determine whether, as CO
Kearney suggested, Dayton was properly complying with the LOTO standard.

October 1993 – Accident Follow-up and OSHA LOTO Inspection

The fourth event culminated with Mattocks’s inadequate response to yet another specific
request from corporate safety director Walker to reevaluate the application of the LOTO
standard to the entire Dayton operation. Once again, Mattocks concluded that LOTO
requirements, other than training at the affected level, did not apply. Following the fatal
accident on the TAM that led to OSHA’s inspection in this case, Walker and various Dayton
managers and supervisors met with Mattocks, members of the joint safety committee, and certain
employees who performed the same job function as the decedent. Together, they investigated
how the accident occurred and what safety “countermeasures” should be implemented.
According to Walker, although LOTO was not viewed by those participating in the meeting as
relevant to the accident, the participants committed to reexamining the application of LOTO to
Dayton’s entire operation. After the meeting, Walker reminded Mattocks of this commitment.
Th ereafter, despite some review of the LOTO standard, Mattocks concluded—based on what she
described as her “own experience”—that setup operations on the TAMs were part of normal
production operations rather than servicing or maintenance. Mattocks testified that, at the time,
she believed the other job tasks at issue were either normal production operations or fell within
the standard’s minor servicing exception. There is no record evidence, however, showing that
she sought any guidance or confirmation regarding her understanding of the job tasks or
assessment of the standard’s requirements.

The fifth event that alerted Mattocks to the fact that Dayton might be in violation of the
LOTO standard arose during OSHA’s inspection in this case. Mattocks admitted that CO
George McCown, who had conducted the inspection, was “there solely [for] the purpose of the
lockout/tagout inspection . . . [a]nd . . . express[ed] that he felt we had some opportunities in
lockout/tagout.” She also testified that McCown specified that Dayton “had some opportunities
in [setting up the TAMs and conducting mold changes on the curing presses] to incorporate
lockout/tagout.” And Mattocks was asked directly “[w]hat operations in the plant [she and CO
McCown] review[ed] in connection with the alleged lockout/tagout violation[.]” After counsel
reminded Mattocks of her earlier testimony in another case, which was entered into evidence
here, Mattocks explicitly acknowledged that “in [their] closing conference” CO McCown
reviewed with her the alleged LOTO violations in the banbury, tuber, bead winding, setup, mold
change, and TUO module operator departments—each of which they had visited together in
November 1993. The record indicates, however, that Mattocks never acted on McCown’s
admonitions. Indeed, as of April 1994, when the citation in this case was issued, Dayton was
still treating all of its employees as affected under the LOTO standard; lockout procedures for
the job tasks at issue were not fully instituted until months later.

Taken together, this evidence shows that Dayton’s safety managers ignored repeated and
explicit warnings that Dayton might be in violation of the LOTO standard, and twice disregarded
specific instructions from safety director Walker, a high level corporate official, to review the
LOTO standard’s applicability to Dayton employees. Mattocks’s steadfast refusal to reassess the
basis of Dayton safety director Phillip McCowan’s decision to exempt Dayton from the bulk of
the standard’s requirements was nothing short of obstinate.  In contrast to the picture our
dissenting colleague paints of a proactively safety-conscious manager who initiated reviews of
her predecessor’s classification of Dayton employees, Mattocks invariably responded to each of
the five events chronicled above with the erroneous assumption that McCowan’s initial decision
had been correct and limited her inquiry to determining whether anything had changed since that
decision was made. Thus, although Mattocks professed familiarity with the work activities at
issue here, was well acquainted with Dayton’s written descriptions of the various job tasks and
safe operating procedures, and discussed several of the job tasks with safety consultant
Lepkowski and COs Kearney and McCown, Mattocks never ventured beyond her predecessor’s
false dichotomy between Dayton and Ogden Allied to analyze whether the job tasks performed
by Dayton employees actually fit within the meaning of servicing and maintenance as defined by
the LOTO standard .  Calang Corp. , 14 BNA OSHC 1789, 1791-94, 1987-90 CCH OSHD
¶ 29,080, pp. 38,870-74 (No. 85-0319, 1990) (affirming willful violation where employer
ignored compliance officer’s warning that condition violated OSHA standard).  Moreover, we
have serious doubts that Mattocks actually could have compared the job tasks at issue here with
the provisions of the LOTO standard yet not understood that the employees who engaged in
these tasks fell within the authorized category under the standard. See Falcon Steel Co. , 16 BNA
OSHC 1179, 1182, 1993-95 CCH OSHD ¶ 30,059, p. 41,331 (No. 89-2883, 1993) (consolidated)
(finding of willfulness based in part on “the uncompromising language of the standard itself”);
see also Johnson Controls, Inc. , 16 BNA OSHC 1048, 1051, 1993-95 CCH OSHD ¶ 30,018, p.
41,142 (No. 90-2179, 1993) (“A company’s conscious decision to adopt a policy deviating from
that which OSHA has pronounced to be the correct course of action under a standard is willful
behavior unless supported by a reasonable belief, held in good faith, that the company’s policy is
correct.”).

Based on Mattocks’s knowledge of the LOTO standard and of the job tasks at issue in
this case, and on the overwhelming evidence that she received repeated requests and warnings
about the standard’s application to Dayton’s operations, we find that Mattocks either knew that
her predecessor’s LOTO analysis was incorrect or chose to avoid such knowledge by refusing to
conduct her own assessment. See E. Smalis Painting Co. , 22 BNA OSHC at 1572 (finding
violation willful where evidence showed employer “had actual knowledge [of standard’s
requirements] or failed to avail itself of several opportunities to learn [of them]); United States v.
Ladish Malting Co. , 135 F.3d 484, 488 (7th Cir. 1998) (“‘actual knowledge and deliberate
avoidance of knowledge are the same thing’” and “[b]ehaving like an ostrich supports an
inference of actual knowledge” (citation omitted)); NLRB v. Regal Aluminum, Inc. , 436 F.2d
525, 527-28 (8th Cir. 1971) (“It is well-settled law that a party to a transaction, where his rights
are liable to be injuriously affected by notice, cannot willfully shut his eyes to the means of
knowledge which he knows are at hand, and thereby escape the consequences which would flow
from the notice if it had actually been received.” (quoting The Lulu , 77 U.S. 192, 201 (1869))).
In contrast to our dissenting colleague, we simply cannot find that Mattocks’s feeble excuses for
Dayton’s failure to comply with the LOTO standard add up to negligence. Rather, we find it far
more likely than not that when faced with the steady stream of LOTO-related inquiries and
warnings that confronted Mattocks, good faith would dictate more than cursory reviews of job
functions and a thirty-minute chat with a safety consultant when life and limb are at stake. In
these circumstances, we find that Mattocks’s failure to comply with the LOTO standard with
respect to Dayton’s employees showed conscious disregard of the standard’s requirements and
plain indifference to employee safety, in willful violation of the Act. Hern Iron Works, Inc ., 16
BNA OSHC at 1214, 1993-95 CCH OSHD at p. 41,257 (“A willful violation is differentiated by
heightened awareness of the illegality of the conduct or conditions and by a state of mind of
conscious disregard or plain indifference.”). Given that Mattocks was responsible for the plant’s
safety program and for its compliance with OSHA standards, her willful conduct is imputed to
Dayton. See Burkes Mech., Inc. , 21 BNA OSHC at 2140 n.7, 2004-09 CCH OSHD at p. 53,563
n.7 (noting that worksite superintendent’s state of mind could be imputed to employer for
purpose of finding that violation was willful). And as Dayton’s failure to comply with the cited
provisions hinges on its reliance on Mattocks’s unfounded determination that no Dayton
employee performed servicing or maintenance activities covered by the LOTO standard, this
willful conduct extends to each one of the citation items that we affirm today. We therefore
characterize all of those violations as willful.

VI. Penalty

Under section 17(j) of the OSH Act, 29 U.S.C. § 666(j), the Commission must give “due
consideration to the appropriateness of the penalty with respect to the size of the business of the
employer being charged, the gravity of the violation, the good faith of the employer, and the
history of the previous violations.” The principal factor in a penalty determination is gravity,
which “is based on the number of employees exposed, duration of exposure, likelihood of injury,
and precautions taken against injury.” Siemens Energy & Automation, Inc. , 20 BNA OSHC
2196, 2201, 2004-09 CCH OSHD ¶ 32,880, p. 53,231 (No. 00-1052, 2005).

For each of the citation items, the Secretary proposed a penalty of $70,000. The judge
disregarded the Secretary’s proposed penalty amounts based on his determination that the
Secretary failed to properly consider the statutory penalty factors. The judge separately
considered each affirmed citation item and found that no penalty reductions were warranted
based on size, history, or good faith, and that the gravity of the violations differed based on the
job tasks that Dayton employees performed.

We agree with the judge that Dayton’s 1200-employee workforce precludes any
reduction for size. We also find no basis to accord a reduction for good faith, as Mattocks
persistently failed to heed repeated entreaties from high level corporate officials and OSHA to
reassess Dayton’s LOTO compliance. We find, however, that a reduction for prior history is
warranted because the record sheds little light on the circumstances surrounding the 1993 Des
Moines citation, and there is no evidence that Dayton was cited for violating the LOTO standard
on any other occasion. See generally D & S Grading Co. , 899 F.2d 1145, 1148 (11th Cir. 1990)
(evaluating prior history for penalty purposes).

Based on the record, we also find that the gravity was high for all of the violations. The
unexpected energization of any of the cited machines during the job tasks at issue could have
resulted in serious injury or death to the Dayton employees exposed to this hazard, and at least
ninety employees were responsible for performing one or more of these job tasks. Even
momentary exposure to equipment that has not been fully deenergized and locked out poses a
significant risk of serious harm or death, as illustrated by the fatality here. See GM , 22 BNA
OSHC at 1048, 2004-09 CCH OSHD at p. 53,627 (“As evidenced by the fatality that prompted
OSHA’s inspection here, even momentary exposure to equipment that has not been fully deenergized and locked out
poses a significant risk of serious harm or death.”) . Dayton, however, provided no energy control
procedures for any of the job tasks that exposed its employees to the dangers of unexpected
energization. And the record indicates that Dayton employees received no locks during the
citation period. In fact, the record establishes that Dayton supervisors rebuffed a banbury
operator’s safety concerns when they rejected the employee’s requests for a lock in the fall of
1993.

Dayton argues that the citation items alleging its failure to provide its employees with
locks under § 1910.147(c)(5)(i) and train its employees at the authorized level under
§ 1910.147(c)(7)(i) are duplicative of the citation items alleging its failure to develop, document,
and utilize energy control procedures under § 1910.147(c)(4)(i). We reject this argument
because these provisions do not “require the same abatement measures” and “abatement of one
citation item [would not] necessarily result in the abatement of the other item as well.” See
Rawson Contractors, Inc. , 20 BNA OSHC 1078, 1082 n.5, 2002-04 CCH OSHD ¶ 32,657, p.
51,328 n.5 (No. 99-0018, 2003).

However, in calculating the penalty amounts for each citation item, we acknowledge that
the requirement to use energy control procedures under § 1910.147(c)(4)(i) bears some relation
to the requirements to provide employees with locks under § 1910.147(c)(5)(i) and to inspect,
and certify the inspection of energy control procedures under § 1910.147(c)(6). Specifically, we
note that (1) even though energy control procedures need not indicate who is responsible for
providing locks to employees, the locks themselves are necessary to utilize such procedures; and
(2) inspections of energy control procedures, and certification of such inspections, ensure that
the procedures remain effective when utilized.

29 C.F.R. § 1910.147(c)(4)(i), (5)(i), (6). We
have also considered that only one employee was exposed in each of the training citation items.
29 C.F.R. § 1910.147(c)(7)(i). Accordingly, we assess the following penalty amounts for the
items we affirm: Items 1 through 6 - $25,000 each; Item 7 - $15,000; Items 8a and 8b - $10,000
(grouped); and Items 9 through 12, 14 through 17, 20 through 30, 32 through 48, 50 through 83,
86, 87, 89 through 98, 100 through 106, and 108 - $20,000 each.

ORDER

We affirm Willful Citation 1, Items 1 through 6, 7, 8a and 8b, 9 through 12, 14 through
17, 20 through 30, 32 through 48, 50 through 83, 86, 87, 89 through 98, 100 through 106, and
108 as willful, and we vacate Item 19. We assess a total penalty of $1,975,000, as follows:
Items 1 through 6 - $25,000 each; Item 7 - $15,000; Items 8a and 8b - $10,000 (grouped); and
Items 9 through 12, 14 through 17, 20 through 30, 32 through 48, 50 through 83, 86, 87, 89
through 98, 100 through 106, and 108 - $20,000 each.

SO ORDERED.

/s/____

Thomasina V. Rogers

Chairman

/s/_____

Cynthia L. Attwood

Dated: 9/10/2010                                                          Commissioner

THOMPSON, Commissioner, dissenting in part:

I join in the majority’s decision in all but the following respects: (1) its decision to
affirm the violations alleged under 29 C.F.R. § 1910.147(c)(4)(i) on a per-machine-type basis
and (2) its decision to characterize all the affirmed citation items as willful.

Citation on a Per-Machine-Type Basis

Dayton organized the seven types of machines at issue into six production departments:
(1) banbury machines in the banbury department, (2) Dayton loaders and tread tubers in the
tubing department, (3) beadwinder machines in the beadwinding department, (4) tire assembly
machines (“TAMs”) in the setup department, (5) radial dopers and curing presses in the curing
department, and (6) module machines in the final inspections department.

In Items 1 to 6 of the citation, the Secretary alleged violations of § 1910.147(c)(4)(i) on a
per-department basis for Dayton’s failure to document, develop, and utilize lockout/tagout
(“LOTO”) energy control procedures. The judge concluded that while the Secretary had the
authority to issue per-instance violations under § 1910.147(c)(4)(i), the number of items should
be based on the number of machine-types at issue rather than the number of departments. While
I find that under appropriate circumstances, the Secretary has the authority to issue separate
violations of § 1910.147(c)(4)(i), she has failed to establish in this case that each type of
machine is so different that a separate procedure would be required for each department or
machine-type.

The majority simply reasons that these machines are so large, complex and different that
it is unfathomable an employer could use one procedure for all of the machine-types at issue.
But that approach ignores that § 1910.147(c)(4)(i) is a performance-based standard stated in
terms that refer to a single course of conduct rather than an individualized duty. Gen. Motors
Corp. (“ GM ”), 22 BNA OSHC 1019, 1046, 2004-09 CCH OSHD ¶ 32,928, p. 53,625 (No.
91-2834E, 2007) (consolidated) (noting that “‘per-instance violations and penalties are
appropriate when the cited regulation or standard clearly prohibits individual acts rather than a
single course of action”’ (citation omitted)). As such, it allows the employer to determine the
procedures necessary to provide effective LOTO protection for its employees. And the language
of the standard does not focus on an employer’s duty to control the energy sources of the
separate machines, but instead requires the employer to develop and document LOTO
procedures “for the control of potentially hazardous energy when employees are engaged in the
activities covered by [§ 1910.147].” 29 C.F.R. § 1910.147(c)(4)(i); GM , 22 BNA OSHC at
1046, 2004-09 CCH OSHD at p. 53,625 (“‘The key . . . [is] the language of the statute or the
specific standard or regulation cited.”’ (citation omitted)).

Moreover, as the Secretary explained in the preamble to the LOTO standard, an employer
does not always need separate procedures for each type of machine:

Where appropriate, [the sample procedure in Appendix to § 1910.147] may be
used as written in the Appendix by simply filling in the blanks. This procedure is
not considered unique and can be applied with considerable flexibility to groups
of machines or tasks. . . . The sample would need only minor changes to
methods, procedures and/or text to be acceptable for many different workplace
situations.

Control of Hazardous Energy Sources (Lockout/Tagout), 54 Fed. Reg. 36,644, 36,671 (Sept. 1,
1989) (final rule). As the Secretary acknowledges in the preamble, an employer’s procedures
“can apply to a group of similar machines, types of energy and tasks if a single procedure can
address the hazards and the steps to be taken satisfactorily.” Id . at 36,670. Indeed, as the
majority recognizes in its decision, the Secretary further explained that,

whereas the procedure is required to be written in detail, this does not mean that a
separate procedure must be written for each and every machine or piece of
equipment. Similar machines and/or equipment (such as those using the same
type and magnitude energy) which have the same or similar types of controls can
be covered with a single procedure.

Id ., amended by 55 Fed. Reg. 38,677, 38,681 (Sept. 20, 1990) (final rule).

So, while it is possible that an employer would need separate energy control procedures
for different machines, the Secretary must show that separate procedures are, in fact, necessary
in order to support citation on a per-machine-type basis. The Secretary would have to provide
evidence showing that the machines at issue neither have “the same or similar types of controls”
nor “the same type and magnitude [of] energy,” and that a single procedure would not
satisfactorily “address the hazards and the steps to be taken.” Id. at 36,670. Here, the Secretary
has pointed to no such evidence. In fact, her only argument is that the machine-types at issue are
all different merely because they are housed in different departments. It was never the
Secretary’s theory that the violations were based on the number of machine-types; rather this
was the judge’s theory alone.

Without more, I find that the Secretary has not established per-machine-type violations of
§ 1910.147(c)(4)(i) in this case.

Willful Characterization

As an initial matter, in its consideration of characterization, I find no fault in the
majority’s decision to disregard the Des Moines citation and the accompanying memorandum
that was sent to the Dayton plant’s president. I believe, however, that the evidence upon which
the majority does rely shows only that Dayton and its management acted negligently, conduct
that does not rise to the level of willfulness. See AJP Constr. Inc. v. Sec'y of Labor, 357 F.3d 70,
75 (D.C. Cir. 2004) (“[A]lthough constructive knowledge or mere negligence suffices for a non-willful violation, willfulness requires conscious disregard or plain indifference to the Act’s
requirements.”); Am. Wrecking Corp. v. Sec'y of Labor, 351 F.3d 1254, 1264 (D.C. Cir. 2003)
(“Mere negligence or lack of diligence is not sufficient to establish employer’s intentional
disregard for or heightened awareness of a violation.”); GM , 22 BNA OSHC at 1043, 2004-09
CCH OSHD at p. 53,622 (noting that “the Commission and courts distinguish ‘between mere
negligence and willfulness , holding that the former is sufficient for affirming a non- willful
violation, but that willfulness is characterized by an intentional, knowing failure to comply with
a legal duty’” (citation omitted)). Moreover, the majority’s discussion ignores evidence that
seriously undermines any conclusion that Dayton management manifested a willful state of
mind.

According to the record, Dayton’s sole reason for not complying with the various
provisions of the LOTO standard was its safety managers’ belief that Dayton employees were
properly classified at the “affected” level under the standard. For this reason, Dayton did not (1)
develop or document LOTO procedures for its employees under § 1910.147(c)(4)(i); (2) train its
employees at the affected level, provide them with locks and tags, and require them to utilize
LOTO procedures under 29 C.F.R. § 1910.147(c)(4)(i), (5)(i), (7)(i); and (3) inspect energy
control procedures on at least an annual basis and certify them under 29 C.F.R.

§ 1910.l47(c)(6). Thus, in my view, the central question here is whether Dayton either had
actual knowledge that its employees should be classified at the “authorized” level, or possessed
such a state of mind that it would not have cared even if it had been so informed.

McCowan’s Assessment of LOTO Standard

The majority’s willfulness analysis assumes that the language of the LOTO standard is so
plain that Dayton, through its safety managers, must have understood that the job tasks at issue
here fell within the definition of “[s]ervicing and/or maintenance.” 29 C.F.R. § 1910.147(b).
The Commission has indeed premised a willful violation on the “uncompromising language of
the standard itself.” Falcon Steel Co., 16 BNA OSHC 1179, 1182, 1993-95 CCH OSHD
¶ 30,059, pp. 41,330-31 (No. 89-2883, 1993) (consolidated) (characterizing violation as willful
where employer used method of transport that was clearly prohibited under 29 C.F.R.
§ 1926.550(g)(2) and employer’s failed impossibility defense merely demonstrated its
underlying motivation was “convenience and cost”) . But I find it inappropriate in this case to
characterize the violations at issue as willful based on any assumptions about Dayton’s
assessment of the LOTO standard and its application to the job tasks in question.

Phillip McCowan was Dayton’s senior safety engineer responsible for safety
management when the LOTO standard first went into effect. McCowan testified that soon after
the LOTO standard’s promulgation, he read the standard several times and discussed it with
Firestone’s corporate safety director, safety engineers at other Firestone plants, and Ogden
Allied, a contractor at the plant responsible for performing maintenance work. In light of the
new LOTO standard, he performed a hazard analysis for each of the different job classifications
of Dayton employees and reviewed “safe operating procedures” for the various machines at the
plant. As manager over the medical department, he performed a complete review of the plant’s
OSHA 200 logs as well as every “medical pass” to look for any injuries “caused by unexpected
energy sources,” and found none. Following this extensive review, McCowan reasoned that the
job tasks at issue fell within the minor servicing exception, 29 C.F.R. § 1910.147(a)(2)(ii) (note),
and that Dayton employees were not subject to unexpected energization because they performed
“one-man” operations, were in “complete control” of their machines, were in plain view of
operators when performing their job tasks, and were working on machines equipped with
emergency stop devices and safety ropes. Thus, he concluded that Dayton employees should be
classified at the affected level, while Ogden Allied employees should be classified at the
authorized level. 29 C.F.R. § 1910.147(b) (defining “[a]ffected employee” and “[a]uthroized
employee”).

The majority finds “conscious disregard” by Dayton because McCowan’s “flawed
assessments” were “patently inconsistent” with the definition of “[s]ervicing and/or
maintenance,” which references the types of activities that Dayton employees performed, such as
setting up the machines for production and installing machine parts. But this reading of the
definition ignores the further requirement that employees be potentially “exposed to the
unexpected energization or startup of the equipment or release of hazardous energy,” a
requirement that is also included in the standard’s scope provision. 29 C.F.R.
§ 1910.147(a)(1)(i), (b). Indeed, McCowan’s assessment was premised in part on his finding
after an extensive analysis that Dayton employees were not exposed to the hazard of unexpected
energization. Although I agree with the majority’s conclusion that certain employees whom
Dayton treated as “affected” should have been treated as “authorized,” evidence in the record
show that McCowan’s application of the standard to Dayton’s operations was made in good
faith.

On the issue of unexpected energization, the majority correctly cites evidence that the
curing presses could close quickly, “within seconds.” I agree this refutes Dayton’s position that
employees performing servicing and maintenance on slow moving TAMs, banbury machines,
and curing presses were protected from unexpected energization. Also, the majority agrees that
certain servicing and maintenance activities were visible from machine control panels, but
refutes Dayton’s position by correctly pointing out that observing such activities from the
machine control panels does not necessarily prevent possible inadvertent startup, a factor that
McCowan did not consider. While such subtleties in the record evidence support a finding that
the Dayton employees referenced in the affirmed citation items met the definition of
“[a]uthorized employee,” McCowan’s failure to make this same finding following his extensive
review of the job tasks, safe operating procedures, and injury logs does not justify the majority’s
conclusion that Dayton willfully disregarded an obvious interpretation of the definition of
“[s]ervicing and/or maintenance.” 29 C.F.R. § 1910.147(b); see Johnson Controls, Inc. , 16 BNA
OSHC 1048, 1051, 1993-95 CCH OSHD ¶ 30,018, p. 41,143 (No. 90-2179, 1993) (noting that
“[w]illfulness is negated if the employer held a belief in good faith that its own interpretation
was reasonable in the circumstances”; “[a] ‘colorable argument’ can be held in good faith ” if it is
“‘nonfrivolous ’” ; and “[a]n employer may in good faith hold even an erroneous belief as long as
the belief is plausible under the circumstances”).

Accordingly, I conclude that McCowan’s decision to classify Dayton employees at the
affected rather than authorized level shows negligence, not conscious disregard, nor plain
indifference to the requirements of the standard or to employee safety.

Conduct of Mattocks, Dayton’s Safety Manager

The remainder of the majority’s characterization analysis focuses at length on five
“events” that occurred once Kelley Mattocks became responsible for OSHA compliance at
Dayton. According to the majority, these five events “confronted Mattocks with concerns and
warnings about LOTO compliance at the Dayton plant.” I do not dispute the majority’s
recitation of factual matters pertaining specifically to the receipt of company memoranda, and
Mattocks’s conversations with the outside safety consultant and the corporate safety director.
But I do disagree with the majority’s decision to depart from the judge’s findings and credit the
testimony of OSHA industrial hygienist Faye Kearney over that of Mattocks. I also disagree
with the majority’s legal conclusion that these facts establish that Mattocks’s conduct here
evidenced plain indifference or conscious disregard.

Although the judge recognized that Kearney and Mattocks provided conflicting
testimony regarding what occurred during the ergonomics inspection, he made no credibility
determinations regarding this conflicting testimony. Ordinarily, the Commission will remand a
case to the judge if it finds that credibility findings are necessary to resolve conflicting
testimony. See Schuler-Haas Elec. Corp. , 21 BNA OSHC 1489, 1495, 2004-09 CCH OSHD
¶ 32,816, p. 52,601 (No. 03-0322, 2006). But where, as here, the judge who heard the testimony
has retired, the Commission has proceeded without the benefit of credibility findings. Id. , 2004-09 CCH OSHD at p. 52,601 (resolving matter based on record where judge who heard case is
deceased); Sal Masonry Contractors Inc. , 15 BNA OSHC 1609, 1611, 1991-93 CCH OSHD
¶ 29,673, p. 40,208 (No. 87-2007, 1992) (resolving matter based on record where judge who
heard case has retired).

Given that the Secretary bears the ultimate burden of proving willfulness and that
demeanor-based credibility findings were not made here by the judge, I see no basis to credit any
testimony from Kearney that conflicted with Mattocks’s version of events. See Schuler-Haas
Elec. Corp. , 21 BNA OSHC at 1495, 2004-09 CCH OSHD at p. 52,601 (concluding that, without
credibility findings, evidence was insufficient to establish willfulness in case brought under
construction asbestos standard where foreman’s testimony regarding his belief that area was safe
or was no longer a “regulated area” could not be discredited). In crediting and relying on
Kearney’s conflicting testimony, the majority emphasizes that it is “specific, direct, and
corroborated by her actions.” The implication is that Mattocks’s testimony exhibits none of
these characteristics. But while Kearney included some detail in her testimony regarding what
occurred during the two walk-arounds, Mattocks did as well. Indeed, Mattocks specifically
testified that (1) Kearney never told her of danger zones in the tubing, beadwinding, or setup
departments; (2) as to the curing department, Kearney expressed concern only regarding
employees who might stand on oily top hats; (3) as to the setup department, Kearney expressed
concern only regarding the use of alligator clips to hold the manual switch on the TAM, a
procedure that Mattocks acknowledged as inappropriate at that time of the inspection and for
which she took immediate corrective action; (4) Kearney never advised her of LOTO-related
hazards in any of the departments; and (5) Kearney never asked how any of the equipment at
issue worked.

As the majority points out, evidence in the record shows that Kearney raised concerns
about Dayton’s LOTO compliance with her supervisors and prepared an OSHA worksheet
describing several of the “violations” she observed. But this evidence does not establish, in my
mind, whether she ever discussed specific LOTO hazards with Mattocks. In fact, other evidence
in the record casts doubt on whether Kearney spoke in anything other than “mere generalities”
about LOTO compliance to Mattocks. For example, Mattocks took twenty-six pages of notes
during the various stages of the ergonomics investigation, and the only reference to LOTO was a
notation that Kearney had requested a copy of the LOTO program. Additionally, Kearney’s
claim she confronted Mattocks after her OSHA inspection with “concerns” about LOTO
compliance at the Dayton plant directly conflicts with undisputed evidence about the content of
the OSHA closing conference. None of the notes taken during the closing conference by
Kearney herself, or by a Dayton employee on behalf of Mattocks, included any reference to
LOTO. Certainly, Kearney’s testimony could be accurate in all respects, but I find nothing in
the record that warrants crediting her testimony over the equally specific testimony of Mattocks.
Accordingly, based on my review of the record, I would not defer to Kearney’s version of events
without the benefit of demeanor-based credibility determinations.

Unless Kearney’s conflicting testimony is credited over Mattocks’ contradictory
testimony, the record overall shows only that Kearney and George McCown—the CO who
subsequently conducted the LOTO inspection—made vague and general statements to Mattocks
about LOTO “opportunities” at Dayton’s plant. The majority suggests that “McCown reviewed
with [Mattocks] the alleged LOTO violations” in the six departments. Mattocks testified,
however, that while she and McCown visited these departments, McCown merely discussed
“some opportunities” or “situations” with respect to LOTO at the closing conference. Moreover,
based on Mattocks’s testimony, it is not even clear that they observed all of the specific servicing
and maintenance activities at issue here during McCown’s visit. Unfortunately, McCown was
not called as a witness, and these ambiguities in the record therefore persist.

But even if Kearney’s testimony were credited, the Secretary still falls short of
establishing that Mattocks’s conduct following her conversations with Kearney in any way
demonstrated conscious disregard or plain indifference. Kearney’s comments to Mattocks were
made in the context of an extensive ergonomics inspection, not a LOTO inspection. Kearney, an
industrial hygienist, admitted that she specialized in health-related inspections, not safety-related
inspections. Even the OSHA area director who received Kearney’s worksheet regarding
possible LOTO violations admitted that he was not comfortable with her “level of expertise”
because she “doesn’t normally look at mechanics’ things.” As such, it was not unreasonable for
Mattocks, a safety manager, to continue to rely on Dayton’s extensive analysis concluding that
Dayton employees were not exposed to the hazard of unexpected energization.

To ascribe a willful state of mind to Mattocks, the majority relies on precedent that
equates “deliberate avoidance of knowledge” to actual knowledge. United States v. Ladish
Malting Co. , 135 F.3d 484, 488 (7th Cir. 1998) (noting that “‘actual knowledge and deliberate
avoidance of knowledge are the same thing,’” and that “[b]ehaving like an ostrich supports an
inference of actual knowledge” (citation omitted)). But the majority either ignores or
misconstrues evidence showing that Mattocks did not deliberately avoid Dayton’s obligations
under the LOTO standard. Specifically, Mattocks discussed LOTO issues with the outside
safety consultant for thirty minutes, and there is nothing in the record to show that he ever
recommended that Dayton engage in any particular course of action. And even if the safety
consultant had made such a recommendation but Mattocks chose to adhere to her own
interpretation of the standard, it is inappropriate to cite such a choice as evidence of willful
intent. If anything, Mattock’s decision to provide Dayton employees with training at the
affected level and then pick the consultant’s brain for thirty minutes about the scope and
application of the LOTO standard confirms her good faith intent to fully examine the continuing
validity of McCowan’s analysis of the LOTO standard’s application to Dayton’s servicing and
maintenance activities. See Falcon Steel Co. , 16 BNA OSHC 1179, 1182, 1187, 1993-95 CCH
OSHD ¶ 30,059, pp. 41,331, 41,336 (No. 89-2883, 1993) (consolidated) (ascribing “neither
credit nor blame” where, after hiring safety consultant, employer failed to respond to
consultant’s warnings, because penalizing such behavior might discourage employer from
creating and developing its own safety programs). Additionally, in response to a December 1992
memorandum regarding LOTO compliance, it was Mattocks who took affirmative steps to verify
that the facts underlying McCowan’s legal conclusion classifying all Dayton employees at the
affected level had not changed. It stands to reason that had Mattocks intended to turn a blind eye
to the requirements of the LOTO standard, she would never have inquired and confirmed with
Dayton’s production supervisors that the nature of their employees’ jobs remained the same.
Finally, following the accident in October 1993, it was Mattocks who, yet again, reevaluated
how the LOTO standard applied to Dayton’s servicing and maintenance activities.

Based on the foregoing, I believe that any shortcomings in Mattocks’s efforts to comply
with the LOTO standard were mere negligence and do not evidence a state of mind that supports
a finding of willfulness. See Trinity Indus., Inc. , 20 BNA OSHC 1051, 1068, 2002 CCH OSHD
¶ 32,666, p. 51,414 (No. 95-1597, 2003) (finding violation not willful where “the Secretary
introduced no evidence that Trinity knew that its training program failed to comply with OSHA
standards or that Trinity would have failed to correct deficiencies in its program had it known of
the duty to do so”), aff’d without publication , 107 Fed. App. 387 (5th Cir. 2004).

Accordingly, I respectfully dissent.

/s/________

Horace A. Thompson III

Dated: 9/10/2010                                                         Commissioner

SECRETARY OF LABOR,    

Complainant,   

v.

OSHRC Docket No. 94-1374

DAYTON TIRE, BRIDGESTONE/
FIRESTONE

Respondent.

UNITED STEELWORKERS OF AMERICA,

LOCAL 998,   

Authorized Employee

Representative.

Appearances:

James E. Culp, Esq.                                                         Willis J. Goldsmith, Esq.                                 

Office of the Solicitor                                                     Jones, Day. Reavis & Pogue             

U.S. Department of Labor                                               Washington, D.C.                             

For Complainant                                                              For Respondent  

Tony Carr

USW Local 998

Oklahoma City, OK

For Employees

Before: Administrative Law Judge Robert A. Yetman

DECISION AND ORDER

This is a proceeding brought before the Occupational Safety and Health Review
Commission (“The Commission”) pursuant to section 10 of the Occupational Safety and Health
Act of 1970 (“Act”), 29 U.S.C. § 651 et. seq.

As a result of an inspection of Respondent’s worksite located at Oklahoma City,
Oklahoma during the period October 19, 1993 to November 17, 1993, the Occupational Safety
and Health Administration (“OSHA”) issued one willful citation to Respondent dated April 18,
1994 alleging one hundred and seven (107) violations of the so called lockout/tagout standard
(LOTO) set forth at 29 C.F.R. § 1910.147 et seq. with a proposed penalty of $70,000 for each
violation. The total proposed penalty was $7,490,000.00. Respondent filed a timely notice
contesting the citation and a complaint was filed by the Secretary of Labor (“Secretary”) with
this Commission on May 23, 1994. On June 15, 1994, Respondent filed its answer admitting the
jurisdictional allegations, generally denying the allegations within the complaint and citation,
and asserting ten affirmative defenses. In addition to filing its answer, Respondent filed a
Motion to Dismiss and/or For Summary Judgment on the ground that the complaint and citation
filed by the Secretary were time barred by the six-month statute of limitation set forth at section
9(c) of the Act. That motion was denied by the undersigned in an order dated July 26, 1994.

The citation issued to Respondent was incorporated in its entirety as an exhibit to the
complaint. As previously stated, the citation contained 107 separate alleged violations. These
violations fall within five categories. First, violations 1 through 6 alleged separate violations of
29 C.F.R. § 1910.147(c)(4)(i); that Respondent failed to develop, document and utilize
procedures for the control of potentially hazardous energy for seven distinct types of machines
within the plant. (Respondent’s Statement of Position dated April 11, 1995) Second, violation 7
alleges that Respondent violated 29 C.F.R. § 1910.147(c)(5)(i) by failing to provide locks, tags,
chains or other appropriate equipment to authorized employees in order to isolate, secure, or
block machines or equipment from energy sources. This single item applies to all of the
machinery and equipment which Complainant asserts were subject to LOTO procedures. Third,
violations 8(a) and 8(b) allege violations of 29 C.F.R. § 1910.147(c)(6)(i) and (c)(6)(ii),
respectively, in that Respondent failed to conduct an annual or more frequent inspection of its
energy control procedure (item 8(a)) and failed to certify that said inspections had been
conducted (item 8(b)). These violations apply to all of the machinery subject to LOTO and were
combined for purposes of proposing a single penalty. The fourth category constitutes the bulk of
the citation in terms of the number of alleged violations and the proposed penalty. Alleged
violations 9 through 106 list 98 employees who, according to Complainant, were not trained at
the “authorized level” as required by 29 C.F.R. § 1910.147(c)(7)(i). Each separate violation of
this standard has been assessed a proposed penalty of $70,000 by the Secretary. The total
proposed penalty for Respondent’s alleged failure to train its employees was originally
$6,860,000. Fifth, Respondent has been cited for one alleged violation of 29 C.F.R. §
1910.147(d) (item 107) in that Respondent failed to utilize LOTO procedures while an employee
was engaged in setup operations on a specifically identified machine on October 19, 1993. Each
alleged violation has been classified as “willful” and assessed the maximum proposed penalty of
$70,000.

During the course of this litigation, the Secretary moved to amend the citation and/or
complaint on four occasions. By motion dated July 18, 1994, Complainant sought to amend the
complaint by (a) adding the names of three additional employees exposed to alleged hazards, (b)
identifying an additional hazardous activity, i.e., changing P.C.I. rings for items 3,7,8(a), 8(b),
35, 41, and 50 of the citation, and (c) adding an additional alleged failure to train violation (item
108).

By motion dated August 3, 1994, Complainant sought leave to correct a clerical error set
forth at paragraph VI of the complaint. By motion dated February 10, 1995, Complainant sought
to amend the citation by withdrawing the alleged violations set forth at items 13, 18, 31, 49, 84,
88 and 99 and the proposed penalty for each violation for a total penalty reduction of $560,000.
Complainant also corrected misspelled names at items 46, 48, 60, 72, 74, and 77 as well as the
job classifications for employees listed in items 14 and 23 of the citation. By motion dated
September 6, 1995 Complainant moved to amend the citation and complaint to conform to the
evidence to include the “Dayton Loader” in the descriptive language of items 4, 19, 58 and 108
of the citation as a piece of equipment which present hazards to employees. All of these motions
were granted.

The parties engaged in vigorous and lengthy pretrial discovery which raised several
procedural disputes. These disputes were resolved and the matter was set for trial to commence
April 11, 1995 at Oklahoma City, Oklahoma. Respondent filed a Motion For Summary
Judgment prior to trial seeking judgment in its favor on the grounds that (1) the evidence
developed by the parties during discovery failed to support the Secretary’s allegation that
Respondent “willfully” violated the standards and (2) citing violations on an instance-by-instance basis is inappropriate in this case because all of the exposed employees were exposed to
a single alleged hazard resulting from a single course of conduct. This motion was denied in a
Decision and Order dated March 22, 1995.

The hearing commenced on April 11, 1995, at Oklahoma City, Oklahoma and concluded
on September 12, 1995 after thirty-one days of trial and ninety witnesses. This was a complex
litigation involving multiple legal and factual issues. Each member of the litigation team for
both the Secretary and Respondent, as well as the employee representative, represented their
respective clients in a vigorous but professional manner often under adverse conditions; not the
least of which was being in close proximity to the site of the Oklahoma City bombing on the day
of that tragedy.

BACKGROUND

Respondent, Dayton Tire, is a division of Bridgestone/Firestone, Inc. and is engaged in
the business of manufacturing tires. The Oklahoma City, Oklahoma facility which is the subject
of this litigation, is approximately 72 acres in size, employs approximately 1,200 employees and
produces an average of 35,000 tires per day. The plant was initially opened during 1969 and has
continuously produced tires since that time. Tire building is a complex process from the initial
mixing of the various grades of rubber to the final inspection function. The building of a tire
was described by one witness as similar to building a shoe. The final product consists of a
number of different components that are individually produced and assembled in stages along
the production process. Hundreds of machines performing a large variety of tasks are involved
in the process. The manufacturing process itself is divided into “departments” and certain types
of machines are located in each department. The following is a description of those departments
which are relevant to this proceeding.

The first department in the production process is the Banbury department. In this
department pigments and rubber used in the manufacturing process are weighed, sorted and
mixed. Various machines to be described infra are used to perform these functions. After the
rubber is mixed, it travels into a chute through a transfer mix and roller die to a slitter knife
which cuts the rubber into two sheets. The rubber sheets are placed into a lubricant solution and
run through a cooling “festoon.” The rubber is “wig-wagged” by a Dayton loader machine onto
pallets for transport to other departments. The rubber at this point has been formed into a long
flat and thin sheet approximately four feet wide.

The next department in the production process is the tubing department. In this
department rubber is fed into extruders and mills to produce sidewalls and treads for the tires.
Rubber is also processed in the beadwinding department. This department produces “beads”;
that is, that part of the tire which fits within the wheel rim. Employees in this department
operate a wire winding machine which coats strands of wire and forms the coated wire into a
circle. This circle of coated wire is assembled with other components during the tire building
phase.

The tire building department assembles the various components into a “green” tire. This
assembling process is performed on tire assembly machines (“TAM”) and is performed in two
stages; the so called first stage TAMS and the second stage TAMS. Only the second stage TAM
machines are relevant to this proceeding. In the second stage operation, the tire “carcass”
produced in the first stage has placed upon it bands of steel belt and the tire tread. Respondent
utilized three types of second stage TAMS: the “99”, the “85” and a modified 85 known as the
“M-6.” These machines are described in greater detail infra . At this point in the process, the
“green” tire, for the first time, resembles a finished product tire.

After the second stage tire building department, the green tires are moved to the radial
doper department. At this point, a machine known as the radial doper applies a lubricant to the
interior of the tire and paints the exterior of the tire. From the radial doper department, the tires
proceed to the curing department where, by application of heat and pressure in the curing press,
the tires are “cured,” the lettering is imprinted on the side walls and the tread design is formed.
Finally, the tires are run through a machine known as the “tire uniformity optimizer” (“TUO” or
“module”) which checks the tire for shape, grinds rubber from the white sidewalls and also
paints the white sidewalls.

STIPULATIONS

The parties stipulated to the following facts:

Module Operators (Joint Exh. #1)

1.           Prior to April 18, 1994, Dayton Tire did not train its employees at
the authorized level.

2.           In 1992, Dayton Tire provided its employees with affected level
training.

3.           Between October 19, 1993 and April 18, 1994, Dayton Tire
module operators did not change or install parts in the TUO
section of the machine.

4.           Dayton Tire module operators were not given locks prior to April
18, 1994.

5.           During the procedure of changing the grinding stone on the white
sidewall grinder, the module operator’s hands generally come into
contract with the grinding stone.

6.           The white sidewall grinder section of the module machine is in its
“manual” or “set-up” mode while the module operator performs a
grind stone change.

7.           The white sidewall grinder section of the module machine is in its
“manual” or “set-up” mode while the module operator performs a
dust scoop change.

8.           The white sidewall grinder section of the module machine is in its
“manual” or “set-up” mode while the module operator performs a
brake pad change.

9.           The white sidewall grinder section of the module machine is in its
“manual” or “set-up” mode while the module operator performs a
chuck change.

10.         When a safety rope on a module machine has been “pulled” and
has stopped or prevented the operation of the machine, the safety
rope must be manually reset before the machine can again begin
operations.

TAM Size Changers (Ct. Exh. #4)

1.           The second stage TAMs are used for producing 13- to 15-inch
passenger and light truck tires.

2.           The 99 TAM and 85 TAM differ in the at the 99 TAM has a
stationary bandbuilder and the entire tire building process proceeds
inline as contrasted to the 85 TAM, other than the M-6 which has
the bandbuilder connected to a swing arm which take the tread and
belts to grab assembly. In the 99 TAM, a large transfer ring moves
on a traverse in line with the bandbuilder to take the tread
assembly from the bandbuilder and then moves across the traverse
to the pie pans to transfer the tread package to the body ply
assembly which is on the pie pans. In the 85 TAM (other then the
M-6) the bandbuilder moves on a swing arm to the transfer
carriage, and then once the tread is transferred to the carriage, it
moves down the traverse and places the tread over the body ply
assembly. The M-6 is an 85 TAM but performs its functions in an
inline fashion without a swing arm.

3.           In order to build a tire of a different size or different specifications
of the same size on a TAM, either a partial or full size change must
be performed.

4.           On the 99 TAM, when energized, the bandbuilder and hub can be
rotated forward and reverse; the transfer carriage can be moved
from the pie pans to the bandbuilder; the 6 grab segments can be
moved from an open position (large gaps between the segments) to
a close position (smaller gaps between the segments); and the pie
pans can be rotated.

5.           On the M-6 TAM, when energized, the bandbuilder and hub can be
rotated forward and reverse and can be moved by the bandbuilder
assembly on a rail system from the tread tray to the grab assembly.

6.           On the M-6 TAM, when energized, the grab assembly can move
on a rail system from a home position to and from the pie pans; the
6 grab segments can be moved from an open position (large gaps
between the segments) to a close position (smaller gaps between
the segments); and the pie pans can be rotated.

7.           TAM size changes on the second stage TAMs vary from the
simple change of the specifications of the computer program to a
full TAM size change which include, inter alia , removing and
replacing the bandbuilder, the hub, the grabs and the pie pans,
removing and replacing the belts on the belt servers, adjusting the
grabs ands stitcher, and building the check tires.

8.           Robert Julian was employed by Dayton Tire as a TAM size
changer on October 19, 1993. On that date, he was assigned to
perform a full TAM size change on the M-6 85 TAM. Mr. Julian
completed the removal and replacement of the components of the
M-6 TAM.

9.           In 1992, Dayton Tire provided its employees with affected level
training.

10.         A full size change includes changing the hub, pie pans, grabs and
band builder.

11.         When a safety rope on the TAM has been pulled, and has stopped
or prevented the operation of the machine, the safety rope must be
manually reset before the TAM can again begin operations.

12.         The check tires built by TAM size changers which meet
specifications are sold by Dayton Tire.

13.         Immediately following the Bob Julian accident, Dayton Tire began
an investigation to analyze the possible causes of the accident.

14.         On October 19, 1993, TAM size changer Bob Julian was fatally
injured on the Mike 6 TAM.

15.         During the period of October 19, 1993 and April 18, 1994, Dayton
Tire facility had first stage TAMs known as BPA or 88B TAMs,
and second stage TAMs designated as 85, M-6 85 and 99 TAMs.

16.        There are approximately 18 TAMs of the 85 TAM type and 39 of
the 99 TAM type at the facility.

17.       The first stage machines produce what is known as body ply
assembly which consists of, inter alia , a inner liner, ply, beads and
sidewall depending on the type of tire being built.

18.         The purpose of the second stage machine is to produce what is
known as the “green tire” or uncured tire. In general, the second
stage TAMs perform this function by initially assembling the belts
and tread for the tire and then transferring the belt and the tread to
the body ply assembly which has been expanded on the pie pans to
form the tire. A stitcher seals the tire components together by
squeezing out the air in between the component parts to assure the
parts have adhered together.

19.       The person performing the TAM size change is known as a TAM
size changer or setup person and TAM size changers worked in
Department 134 or Setup.

20.         During the period of October 19, 1993 to April 18, 1994, there
were approximately 23 TAM size changers in Department 134.

21.       A TAM size changer can be called upon to perform size changes
on either the first or second stage TAM machines.

22.         A partial size change consists of removing and replacing some, but
not all, of the grabs, pie pans, and/or bandbuilder, individually or
in any combination.

23.        In order for the TAM size changer to perform a full size change on
the 99 TAM, 85 TAM and the M-6 TAM, the Tam size changer
must remove and replace the bandbuilder, grabs, pie pans, and hub,
utilizing a wrench to remove and insert bolts. The TAM size
changer must also lift, remove and insert these parts. During the
course of these activities of removing and replacing these parts, the
TAM size changer will at various times place parts of his body in
the transfer area of the TAM.

24.         The 99 TAMs have electrical, pneumatic, and hydraulic energy
sources; the M-6 85 TAM has electrical and pneumatic energy
sources; and the 85 TAM has electrical, pneumatic, and hydraulic
power with some having gas (nitrogen) assisted hydraulic power as
energy sources.

25.        Prior to April 18, 1994, Dayton Tire did not train any TAM size
changers at the authorized level for lockout/tagout purposes.

26.        Dayton Tire TAM size changer employees were not provided with
locks and/or tags prior to April 18, 1994.

27.        During the period of October 19, 1993 to April 18, 1994, Terry
Hughes, Willie Kinchion, Jackie Whitten, Darrell Mueller, Dennis
Packham, Mark Ward, Lewis Contreras, Richard Parker, Fred
Harris, III, Charles Brannum, Kevin Abrahamson, Larry Westrope,
Albert Starry, Larry Henry, Richard Thompson, Joe Hacker, Jim
Cossey and Helen Jones were employed by Dayton Tire as TAM
size changers.

Radial Dopers (Ct. Exh. #4)

1.           In 1992, Dayton Tire provided its employees with affected level
training.

2.           Radial doper machines are located in the curing department.

3.          During the period of October 19, 1993 to April 18, 1994, there
were seven (7) radial dopers in the curing department.

4.          The purpose of the radial doper is to take the green tire produced
by the second stage TAM machines and spray blem paint and dope
on the tire.

5.          The blem paint and dope sprayed on the tire is necessary to allow
the tire to be cured properly.

6.          The radial doper operator/attendant places the green tires on a
conveyor leading to a clamp arm which picks up the tire and
carries the tire into a spray booth which sprays the blem paint and
dope on the tire. The clamp arm spins the tire quickly so that the
blem paint and dope can be sprayed throughout the tire.

7.           As the clamp arm is spinning the tire, spray nozzles located around
the exterior of the tire spray blem paint on the outside of the tire.
During this process another spray nozzle rises up into the center of
the tire and sprays dope on the inside of each tire.

8.          Some of the spray booths of the radial dopers are enclosed in
plexiglass and others are open.

9.          Once the blem paint and dope have been sprayed on the green tire,
the clamp arm drops the tire on a conveyor which leads back to the
operator. The operator/attendant then removes the tires from the
conveyor and places them on a rack.

10.        A radial doper operator/attendant is expected to remove the
buildup of blem paint and dope on the clamp arm and spray
nozzles approximately every two (2) hours.

11.        During the period of October 19, 1993 to April 18, 1994, the radial
doper attendant/operator placed the machine in manual and
brought the clamp arm into the booth in order to remove the
buildup of blem paint and dope on the clamp arm.

12.        Once the clamp arm was in the booth, the operator/attendant used a
wire brush, knife and/or paper towels to remove the blem paint and
dope buildup on the clamp arm. The operator/attendant had to
place his hands, his arms, and at times his upper body in the
cabinet to clean the clamp arm. During this process, the
operator/attendant’s body would come within a couple of inches
from the clamp arm.

13.        To remove the buildup of blem paint and dope from the spray
nozzles, the radial doper operator/attendant reached into the
cabinet and removed the collar around the nozzles. Using a wire
brush, knife and/or paper towels, the radial doper
attendant/operator removed the buildup of blem paint and dope
from the nozzles and then reinstalled the collar.

14.        The energy sources for the radial doper included electrical and
pneumatic sources.

15.        During the period of October 19, 1993 to April 18, 1994, the
energy sources were not locked out during the removal of blem
paint and dope from the clamp arm and spray nozzles.

16.        During the period of October 19, 1993 to April 18, 1994, the
following people were employed by Dayton Tire as radial doper
operators/attendants: Herman Ashlock; Robert Pound; Phil
Burrous; Kevin O’ Connor; Brad Hall; Chris Guthery; Alfred
Watson; Allen Van Meter; Mike Woody; and John Decesaro.

17.        Radial doper operators/attendants employed by Dayton Tire
between October 19, 1993 to April 18, 1994 removed the buildup
of blem paint and dope from the clamp arm and spray nozzles as
part of their duties.

18.        Prior to April 18, 1994, none of the radial doper
operators/attendants had been trained at the authorized level for
lockout/tagout purposes.

19.        During the period of October 19, 1993 to April 18, 1994, Dayton
Tire considered all the radial doper operators/attendants to be
affected employees, and none of the radial doper
operators/attendants used lockout/tagout procedures when they
removed the buildup of blem paint and dope from the clamp arm
and spray nozzle.

20.        Before April 18, 1994, none of the radial doper
operators/attendants had been provided with locks, tags, chains,
wedges, key blocks, adapter pins, self locking fasteners, or other
hardware for isolating, securing, or blocking of machines or
equipment from energy sources.

21.        During the period of October 19, 1993 to April 18, 1994, Mr. Lee
Jones was employed by Dayton Tire as a utility and service
employee in the curing department.

22.        As a utility and service employee for the curing department, Mr.
Lee Jones was subject to and performed the duties of a radial doper
attendant during the period of October 19, 1993 to April 18, 1994,
including removing the buildup of blem paint and dope from the
clamp arm and spray nozzles.

23.        Prior to April 18, 1994, Lee Jones had not been trained at the
authorized level for lockout/tagout purposes, and Dayton Tire
considered Lee Jones to be an affected employee.

24.        During the period of October 19, 1993 to April 18, 1994, Lee
Jones never used lockout/tagout procedures when he removed the
buildup of blem paint and dope from the clamp arm and spray
nozzles.

25.        Before April 18, 1994, Lee Jones had not been provided with
locks, tags, chains, wedges, key blocks, adapter pins, self locking
fasteners, or other hardware for isolating, securing, or blocking of
machines or equipment from energy sources.

Mold/Bladder Changer (Ct. Exh. #4)

1.          In 1992, Dayton Tire provided its employees with affected level
training.

2.          A mold changer never performs a PCI ring change without also
performing a mold change.

3.          The Dayton Tire plant at Oklahoma City, Oklahoma also includes
Department 132, the Curing Department.

4.          The Curing Department includes 220 curing presses of which 180
are normally in use.

5.          The curing press takes the green tire from the radial doper area and
vulcanizes the tire through heat and pressure into the shape of the
finished tire.

6.          The plant has curing presses of two sizes. The presses have a pair
of either 40-1/2 inch or 43 inch diameter platens.

7.          The curing press has two sides. On the front side is a large and
heavy press which contains two molds primarily made of
aluminum and steel which sit side by side. The upper part of the
press can be moved up and down. Among the other parts of the
front side of the curing press are the tire loaders which are attached
to the front of the press. The tire loader can move with the upper
portion of the press, and can move independently of the press. On
the back side of the press are four post cure inflators.

8.          Green tires are placed in front of the press and tire loaders move
mechanically down on a motor and chain system to pick up the
tires and place them in the molds for curing. Once inside and with
the press closed, the bladder which is made of rubber, inflates and
pushes the tire against the mold to form the tread design and
lettering. The tire is vulcanized by a combination of steam, heat
and pressure. When that process is complete, the tires are removed
onto post cure inflators (PCI) to be inflated and cooled. The PCI
then mechanically places the cured tires onto a conveyor to be sent
to final inspection.

9.           Two functions which the mold/bladder changer must perform are
changing the molds and PCI rings.

10.        The molds are changed to accommodate a different type or size of
tire. To accomplish a mold change, the mold/bladder changer
removes the bladders, the ejector head, and the mold. Once those
components are removed, the mold/bladder changer installs new
molds, new ejector head and new bladders.

11.        In order to accomplish these functions, the mold changer must
reach inside the center of the mold to remove the bladder and
ejector heads. During various parts of this function, the mold
changer will have parts of his body directly below the tire loader.
The mold changer must move the press up and down to remove the
bolts to allow the mold to be removed. While loosening the bolts,
the mold changer must reach across the mold. The employee uses
a forklift to move the molds out of the press and place molds into
the press. Similarly, the mold changer reverses the process to
reinstall the parts which again caused him to be at times below the
tire loader and the press itself.

12.        At all times during the mold change the curing press is placed in
manual and energized.

13.         A PCI ring change is performed whenever the bead size of the tire
being cured changes, e.g. 13 inch to 14 inches.

14.         To perform PCI ring change, the mold changer places the PCI in
manual and closes the yoke. The mold changer removes the two
bolts on the top ring and two bolts on the bottom ring. The mold
bladder changer opens the yoke then removes the old rings and
installs new rings. The mold changer closes the yoke and reinstalls
the four bolts. The mold changer would repeat this process for the
other side.

15.         The energy sources on the curing press are pneumatic, electrical
and steam.

16.        The PCI is energized throughout the installation of new rings.

17.        The energy sources for the PCI are electrical and pneumatic.

18.         During the period of October 19, 1993 to April 18, 1994, Mr.
Daniel Trine, Ms. Stephanie Todd, Mr. Don Perkes, Mr. Tom
Elwell, MR. Jim Lindsey, Mr. Jodie Turner, Mr. Roy Weil, and
Mr. Jim Earle were employed by Dayton Tire as mold/bladder
changers.

DISCUSSION

At the conclusion of the hearing, the parties filed post hearing memoranda of law and
reply memoranda. Before discussing the particular merits of this case, it is necessary to consider
two issues raised by Respondent in its memoranda which, if decided in Respondent’s favor,
would dispose of this matter without further analysis of the facts and the application of law.

First, Respondent renews its argument that the citation issued in this case was not timely
issued in accordance with § 9(c) of the Act and, therefore, should be vacated. Respondent points
to the testimony of compliance officer Kearney that she viewed conditions at Respondent’s
worksite which she believed presented “lockout/tagout hazards” as early as June 14, 1993. (Tr.
4632-33, 4667) Since the citation was issued more than six months after that date, Respondent
argues that the citation is time barred by section 9(c) of the statute. This argument was made and
considered at length by the undersigned in a decision issued July 26, 1994, in response to
Respondent’s Motion For Summary Judgment , wherein it was concluded that the citation was
not time barred. Relying upon Secretary of Labor v. Safeway Store No. 914 , 16 BNA OSHC
1504 (1993), this ALJ stated:

“[A]ccording to the pleadings...the citation issued in this matter is based upon information
gathered during the inspection conducted from October 19, 1993 to November 17, 1993. Section
9(c) does not bar the Secretary from citing the employer for violations observed during that
inspection notwithstanding the fact that the same or similar violations were observed, but not
cited, during an earlier inspection.” Respondent has not raised anything at this point in the
litigation which was not before the court prior to the issuance of that decision. Accordingly,
there is nothing in this record which mandates a reconsideration and reversal of that decision.

The second dispositive issue raised by Respondent asserts that the LOTO standard is
unenforceably vague by its terms and the citation and complaint, without any reference to the
specific facts of this matter, should be vacated on that basis. Respondent points specifically to
the term “unexpected energization” set forth at 29 C.F.R. § 1910.147(a)(1)

and the terms
“minor servicing activities” and alternative “effective” protection set forth in the note at 29
C.F.R. § 1910.147(a)(2)(ii)(B)

as being undefined, vague and imprecise. Respondent asserts
that the aforesaid terms are subject to multiple interpretations and it is not possible to predict or
anticipate the Secretary’s interpretation of those terms.

It is well established that “statutes and regulations which purport to govern conduct must
give an adequate warning of what they command or forbid.” Diebold, Inc. v. Marshall, 585 F.2d
1327 (6th Cir. 1978). The Commission has stated that “[a]n employer can only be required to
comply with requirements of which it has either actual notice or notice derived from the
language of the regulation and surrounding circumstances.” Secretary of Labor v. J.A. Jones
Construction Company, 15 BNA OSHC 2201, 2205 (1993) (quoting Diebold, Inc. v. Marshall
supra). See also United States v. L. Cohen Grocery, 255 U.S. 81 (1921). Moreover, “the
applicability of penal sanctions in regulations is to be narrowly construed by the judiciary
and...OSHA regulations must ‘be written in clear and concise language so that employees will be
better able to understand and apply them’....” Kropp Forge v. Secretary of Labor, 657 F.2d 119,
122 (7th Cir. 1981) (quoting Dravo Corporation v. OSHRC, 613 F.2d 1227, 1234 (3rd Cir.
1980)). The Commission has held, however, that “[a]bsolute precision of language...is not
required, and a standard is not impermissibly vague simply because it is broad in nature.” J.A.
Jones supra at 2205. The Commission further stated that “a broad regulation must be
interrupted in the light of the conduct to which it is being applied, and external, objective
criteria, including the knowledge and perceptions of a reasonable person may be used to give
meaning to such a regulation in a particular situation.” Id. In Secretary of Labor v. R&R
Builde rs Inc., 15 BNA OSHC 1383 (1991), the Commission stated that a standard is not vague
and unenforceable “if ‘a reasonable person,’ examining the generalized standard in light of a
particular set of circumstances, can determine what is required, or if the particular employer was
actually aware of the existence of a hazard and of a means by which to abate it.” Id. at 1387.

Without any reference to the particular merits of this case or the specific operation of any
of the machines cited by Complainant, Respondent broadly asserts that the lockout standard is
unenforceable because the term “unexpected energization” (see footnote 4) is not defined. This
precise issue was considered by the Review Commission in Secretary of Labor v. General
Motors Corporation, Delco Chassis Division, 17 BNA OSHC 1217 (1995). The Commission
concluded that “by its plain meaning, the standard applies only to those machines and pieces of
equipment for which energization or start up would be unexpected by employees.” The
Commission reasoned that “the standard clearly and unambiguously applies only where the
Secretary shows that unexpected energization, start up or release of stored energy could occur
and cause injury. Under these circumstances, we find it unnecessary to look outside the standard
itself for guidance as to its meaning.” Id at 1219. The Court of Appeals for the Sixth Circuit
affirmed the Commission and stated:

We conclude that the plain language of the lockout standard
unambiguously renders the rule inapplicable where an employee is
alerted or warned that the machine being serviced is about to
activate. In such a situation, “energization” of the machine cannot
be said to be “unexpected” since the employee knows in advance
that machine startup is imminent and can safely evacuate the area.
The standard is meant to apply where a service employee is
endangered by a machine that can start up without the employee’s
foreknowledge. In the context of the regulation, use of the word
“unexpected” connotes an element of surprise, and there can be no
surprise when a machine is designed and constructed so that it
cannot start up without giving a servicing employee notice of what
is about to happen.

Secretary of Labor v. General Motors Corporation, Delco Chassis Division , 17 BNA OSHC
1673 (1996).

Thus, contrary to Respondent’s assertion, the term “unexpected energization” is not so
vague as to render the standard unenforceable. However, whether the standard has been violated
because an employee is exposed to “unexpected energization” is dependent upon the facts
surrounding the alleged servicing and/or maintenance performed for each type of machine cited
and whether an employee is exposed to injury without warning if said machine is activated.
Faultless Div. v. Secretary of Labor, 674 F.2d 1177, 1185 (7th Cir. 1982). Moreover, the
interpretation placed upon that language in light of the factual setting must be “consistent with
the regulatory language and...the intent of the regulation.” Georgia Pacific Corp. v. OSHRC, 25
F.3rd 999, 1004, (11th Cir. 1994). See also Martin v. OSHRC, 499 U.S. 144 (1991). These rules
of construction have been applied in the analysis of each individual citation discussed infra .

Respondent also focuses upon the note accompanying the standard set forth at C.F.R. §
1910.147(a)(2)(ii)(B) (see footnote 5) as containing language which renders the entire LOTO
standard unenforceably vague. Specifically, Respondent points to the phrases “minor servicing
activities” and “effective” alternative protection for employees engaged in minor servicing
activities as being so unclear and ambiguous that those terms require “men of common
intelligence to guess at its meaning.” Secretary of Labor v. Culbersen Well Service, Inc., 12
BNA OSHC 1535, 1536 (1985). S ee also Connolly v. General Construction Company, 26 U.S.
383, 391 (1926). Respondent makes this global assertion without any reference to the particular
allegations contained in the complaint or the specific work activities performed by Respondent’s
employees.

In Secretary of Labor v. Westvaco Corp. , 16 BNA OSHC 1374 (1993), the Review
Commission faced a similar attack upon the language of the note referenced by Respondent in
this case. In Westvaco, Respondent had been cited for a violation of C.F.R. § 1910.147(c)(1) by
failing to lockout the slitter section of a printer/slitter machine. The machine, during normal
operation, printed and scored corrugated paperboard. An employee was required to make
adjustments between “runs” in the slitter section. The Secretary alleged that the employee was
exposed to unexpected energization during that work activity. Respondent Westvaco claimed
that the work activity fell within the exception which Respondent complains of in this case. The
Commission stated that the burden to establish the exception falls upon Respondent. Moreover,
based upon the facts of that case, the work activity performed by the employee was preparatory
to normal production and constituted “set up.” Thus, the activity was not performed during
normal production operations and, therefore, fell outside the exception to the standard. Id. at
1379.

It is clear that in Westvaco the Commission analyzed the exception “in light of a
particular set of circumstances,” as well as the conduct to which the exception is applied. R&R
Builders Inc. supra . See J.A. Jones supra . Respondent, however, boldly asserts that the LOTO
standard is unenforceably vague for all times and circumstances without any reference to the
particular facts of this case. Under these circumstances, Respondent has failed to meet its
burden (a) to establish that the referenced exception applies to the particular work activities cited
by the Secretary or (b) to establish that the language of the exception was so unclear when
applied to those work activities that persons of common intelligence could not understand the
meaning and intent of the exception. For these reasons, Respondent’s argument that the standard
is unenforceably vague must be rejected.

THE VIOLATIONS

Item 1 TAMS

Item 1 of the Citation reads as follows:

29 C.F.R. § 1910.147(c)(4)(i): Procedures were not
developed, documented and utilized for the control of potentially
hazardous energy when employees were engaged in activities
covered by this section: At the plant[,] a documented procedure to
control potential hazardous energy for each type of machine was
not being used by employees setting up tire assembly machines.

This alleged violation relates to the activities of employees engaged in the operation of
machines known as tire assembly machines (TAMS). During the period of inspection,
Respondent’s work place contained first stage and second stage TAM’S. The first stage TAMS
are known as 88 and the second stage TAMS are designated as 85, 99 and, in one instance M-6.
The first stage machines produce the body ply assembly consisting of an inner liner, beads and
side wall. The second stage TAMS build upon the body ply assembly produced by the first stage
TAMS. Respondent’s work place contained eighteen (18) 85 TAMS, thirty-nine (39) 99 TAMS
and one M-6 at the time of Complaint’s inspection, a total of 58 second stage TAMS. A “green
tire” is produced at the completion of the work performed by the second stage TAMS. All of the
alleged violations relating to this item result from the operation of the second stage TAMS.

Second stage TAMS attach the tire tread to the body ply assembly produced by the first
stage TAMS. The machine operator operates the machine by using foot pedals placed at the
front bottom of the machine. The machine operator places the body ply assembly produced by
the first stage TAMS on two circular metal disks known as pie pans. Air is introduced into the
machine spreading the pie pans apart and expanding the body ply assembly (“the carcass”). The
operator then places the tire tread upon a circular drum known as the band builder. In the 99
TAM, a transfer carriage moves in a straight line over the band builder, removes the tread
package, moves along a rail approximately three feet to the pie pans at which time the tread
package is placed on the carcass. The machine seals the tire components together by squeezing
out the air between the component parts to ensure that the parts adhere. The pie pans and the
band builder are connected by a drum shaft which spins during normal operation and weighs in
excess of 100 pounds. In the 85 TAM, the band builder moves on a swing arm to the transfer
carriage and deposits the tread package on the transfer carriage. The transfer carriage then
moves to the pie pans where the tread is placed on the carcass. One machine known as Mike-6 is
a modified 85 TAM and is a one of a kind machine. The machine was modified by Respondent
from a swing arm 85 to an in-line TAM.

The second stage TAM machines are used to produce 13, 14 and 15 inch passenger and
light truck tires. In order to prepare the machines to produce a different size tire, employees
known as TAM size changers must perform either a partial or full size change. Size changers do
not operate the machine during normal production. This work activity varies from a simple
change of specifications in the machine’s computer to removing and replacing the bandbuilder,
pie pans, the hub, grab segments of the transfer carriage, and other adjustments to the machine.
Typically, a size changer will perform four or five full changes in an eight hour shift. It is during
the performance of these activities that the Secretary alleges Respondent violated the LOTO
standard.

The 99 and 85 TAMS are energized by electrical, pneumatic and hydraulic energy
sources and the Mike 6 has electric and pneumatic energy. In order to change or adjust the
bandbuilder, pie pans and component parts of the transfer carriage, the employee places the
machine in the “manual mode.” Each machine has a control panel which controls the movement
of the machine in addition to the foot pedals. The M-6 machine has two control panels and a
bandbuilder panel on the front of the machine. The machines are energized when placed in the
manual mode and the transfer carriage for the 99 and 85 machines may be moved by depressing
buttons on the control panels. Other machine parts including the pie pans may also be energized
via the foot pedals or the applicable control panel while the machines are in the manual mode.
The employee is required to place his/her arms, hands and upper body in the path of the transfer
carriage (between the pie pans and the bandbuilder) while engaged in removing and attaching
machine parts during a size change operation. The Secretary asserts that the employees are
exposed to being crushed between the transfer carriage and non moving parts of the machine
while engaged in a size change if the machine is unexpectedly energized. Moreover, parts of the
transfer carriage known as “grabs” could open or close if the machine is unexpectedly energized
resulting in hand injury to the employee. The employee would also be exposed to injury to arms,
hands and upper body if struck by the swing arm of the TAM 85. The moving parts of the
machines move instantaneously upon being energized leaving the employee little or no time to
leave the zone of danger.

Respondent has no written procedure which employees are required to follow when
performing a size change. Size changers are trained by fellow workers when first assigned as a
size changer and each person develops his/her own system for performing the task. The
machines, however, are basically identical; that is, all 99's are the same configuration as are all
85's. As previously noted the M-6 is unique. Thus, the work activity is performed in a similar
fashion by all employees with slight variations among the size changers. Each machine is
equipped with an emergency stop button located on the control panel and a safety line is strung
along the length of each machine. The electrical power to each machine may be disconnected
either by hitting the emergency stop button or by pulling the safety rope. Neither the stop button
nor the safety rope are activated by employees to disconnect the electrical source during a size
change. Employees are not required by Respondent to lockout machines while performing size
changes.

Sufficient evidence has been presented by the Secretary to support the conclusion that
Respondent’s employees were exposed to serious injury or death while performing size changes
on the 99, 85 and M-6 tire assembly machines. Specifically, with respect to the TAM 99,
employees were exposed to serious injury when placing parts of their bodies in the path of the
transfer carriage while changing or adjusting machine parts. Moreover, employees were
exposed to serious injury when working in close proximity to the grab segments. Since
employees could be injured by the transfer carriage or the grab segments if the machines become
unexpectedly energized, procedures should have been developed and utilized to prevent such
energization as required by the standard. The TAM 85's also present the same hazards to
employees; that is, employees were exposed to the swing arm of the bandbuilder and the grab
segments. Employees performing size changes on the M-6 were exposed to similar hazards
relating to the grab segments and movement of the bandbuilder.

The hazards presented by the M-6 machine have been tragically demonstrated by the
death of an employee who was performing a size change on that machine. The machine became
energized moving the transfer carriage and fatally injuring the employee.

See Item 107
Discussion infra . Moreover, other size changers testified that they experienced unexpected
movement of the machines while performing size changes. Some of the movement was
unexplained while other movements were accidental by inadvertently activating the machines
via the foot pedals. In addition, many size changes were completed by two employees working
together. This arrangement often increased the risk of inadvertent activation of the machines.

In order to establish that Respondent failed to comply with the cited standard, the
Secretary must prove that (1) the standard applies; (2) the employer failed to comply with the
terms of the standard; (3) employees had access to the cited condition; (4) the Respondent knew,
or with the exercise of reasonable diligence, could have known of the violative condition. Astra
Pharmaceutical Products, Inc., 1981 CCH OSHC ¶ 25,578, aff’d 681 F.2d 69 (1st Cir. 1982);
Secretary of Labor v. Gary Concrete Products, 15 BNA OSHC 1051, 1052, 1991-93 CCH
OSHD ¶ 29, 344 (1991). Although Respondent disputes the applicability of the standard on the
ground that the employees are not engaged in “servicing or maintenance” while engaged in a
size change, the activities of the employees clearly fall within the definition of those terms as set
forth at section 147(b) of the standard.

The facts clearly establish that employees are exposed
to unexpected energization of the machine while performing set up operations. Moreover, the
facts support the conclusion that the activities of the size changers as described above do not fall
within the exception to the standard for minor servicing performed during normal operations for
the simple reason that the second stage TAM machines are not engaged in producing anything
while undergoing a size change. See footnote 4.

The record established that Respondent failed to institute the lockout procedures required
by the standard during the size change when employee were exposed to the movement of the
transfer carriage and the grab segments. The evidence supports the conclusion that employees
were exposed to serious injury or death from the transfer carriage and the grab segments and the
employer knew or with the exercise of reasonable diligence could have known of the violation.
For the foregoing reasons, it is concluded that Complainant has sustained his burden of proof
and the violation is affirmed.

WILLFULNESS

The Secretary alleges that this violation, as well as every other alleged violation
disclosed during the inspection of Respondent’s worksite, was committed in a “willful” manner
within the meaning of section 17(a) of the Act. Although not defined in the Act, “willful” has
been defined by the Courts as “conscious and intentional disregard of the conditions,”
“deliberate and intentional misconduct,” “utter disregard of consequences” and other similar
descriptions. See Brock v. Morello Brothers Construction, Inc. , 809 F.2d 161 (1st Cir. 1987). In
order to establish a willful violation, it is necessary to determine the “state of mind” of the
employer at the time of the violations. The standard of proof requires that the Secretary produce
evidence establishing that the Respondent displayed an intentional disregard for the requirements
of law and made a conscious, intentional, deliberate and voluntary decision to violate the law or
was plainly indifferent to the requirements of the statute. A. Schenbek and Company v.
Donovan, 646 F.2d 799, 800 (2nd Cir. 1981); Morello Brothers Construction supra at 164;
Georgia Electric Co. v. Marshall, 595 F.2d 309, (5th Cir. 1979). Willful violations are
distinguished by a “heightened awareness of illegality - of the conduct or conditions - and by a
state of mind-conscious disregard or plain indifference.” Williams Enterprises, Inc., 13 BNA
OSHC 1249, 1986-87 CCH OSHD ¶ 27,893. The Tenth Circuit has determined that an
employer’s failure to comply with a safety standard under the Act is “willful” if done knowingly
and purposely by an employer who having a free will or choice, either intentionally disregards
the standard or is plainly indifferent to the requirements. United States v. Dye Construction Co.,
510 F.2d 78, 81 (10th Cir. 1975).

Complainant’s burden to establish a willful violation has been defined by the
Commission as follows:

To establish that a violation was willful, the Secretary bears the
burden of proving that the violation was committed with either an
intentional disregard for the requirements of the Act or with plain
indifference to employee safety. Williams Enterp. , 13 BNA
OSHC 1249, 1256-57, 1986-87 CCH OSHD ¶ 27,893, p. 36,589
(No. 85-355, 1987). There must be evidence that an employer
knew of an applicable standard or provision prohibiting the
conduct or condition and consciously disregarded the standard.
Hern Iron Works, Inc., 16 BNA OSHC 1206, 1215, 1993 CCH
OSHD ¶ 30,046, p. 41,256 (No. 89-433, 1993). A violation is not
willful if the employer had a good faith belief that it was not in
violation. The test of good faith for these purposes is an objective
one - whether the employer’s belief concerning a factual matter, or
concerning the interpretation of a rule was reasonable under the
circumstances. General Motors Electro-Motive Div., 14 BNA
OSHC 2064, 2068, 1991-93 CCH OSHD ¶ 29,240, p. 39, 168 (No.
82-630, 1991).

Secretary of Labor v. S.G. Loewendich and Sons , 16 BNA OSHC 1954, 1958 (1994).

Although an employer’s good faith belief that alternative protective measures are
superior to the requirements of a safety standard will not relieve that employer of a finding of a
willful violation, Secretary of Labor v. Trinity Industries, Inc. , 16 BNA OSHC 1670, 1673,
(11th Cir. 1994), the Review Commission has held that “[a] willful charge is not justified if an
employer has made a good faith effort to comply with a standard or to eliminate a hazard even
though the employer’s efforts are not entirely effective or complete” (citations omitted),
Secretary of Labor v. Keco Industries, Inc., 13 BNA OSHC 1161, 1169 (1987). In other words,
an employer who knowingly and in good faith substitutes its own safety measures to provide
employee protection in place of the requirements of a standard may be found in willful violation
of the standard; however, an employer who seeks, in good faith, to comply with the standard and
fails may not be found to have willfully violated the act.

The failure to comply with the lockout standard during the set up of the TAM machines,
as well as every other violation alleged by the Secretary, has been characterized as a willful
violation; that is, the Respondent consciously disregarded or was plainly indifferent to the
requirements of the lockout standard as it may apply to all of the production activities at the
Oklahoma City plant. Mr. Barrien Zettler, the Deputy Director of the Directorate of Compliance
Programs, testified that he was responsible for reviewing the file developed in this matter by the
Department of Labor and authorized the issuance of the citation by the Area Director, William
White. Mr. Zettler is a high ranking official within the national office of the Occupational
Safety and Health Administration with responsibility for the review and issuance of citations
listing violations on an instance by instance basis. (S ee Tr. 5334 et seq. ) In this case, Mr.
Zettler was briefed by his staff prior to issuance of the citation and concluded that all of the
alleged violations uncovered during the inspection of Respondent’s worksite should be
characterized as willful with a maximum penalty of $70,000 per violation. Mr. Zettler did not,
however, analyze each individual violation to determine whether sufficient facts exist to support
each willful finding. Rather, Mr. Zettler “grouped them all together” and concluded that the
facts support a finding that Respondent was in flagrant violation of the lockout standard
throughout the Oklahoma City plant as a matter of policy. (Tr. 5357-59, 5450)

The Secretary’s conclusion that Respondent either intentionally disregarded or was
plainly indifferent to the requirements of the LOTO standard as a matter of corporate policy
throughout the Oklahoma City facility is based upon the following factors. First, Respondent’s
Oklahoma City site had corporate knowledge of the existence and requirements of the standard.
The standard was promulgated as a final rule on August 31, 1989 with an effective date of
October 31, 1989. By memo dated September 15, 1989, Mr. John Lepkowski, Respondent’s
Corporate Safety Director, informed all of Respondent’s manufacturing facilities, including the
Oklahoma City site, of the existence of the new standard and attached a copy of the standard and
its preamble to his memo. By memo dated November 8, 1990 from R.M. Schall, corporate
headquarters requested all manufacturing facilities, including Oklahoma City, to review
manufacturing equipment for lockout capabilities. Complainant asserts that a memo dated
December 7, 1992 from Robert Walker, Corporate Manager of Safety, Health and Industrial
Hygiene to all plants including Oklahoma City is particularly significant. In that memo Mr.
Walker states with regard to the LOTO standard:

Please revisit your plant’s practice regarding this very important,
fundamental safety procedure. Remember, this standard has been
in effect for over two years, so you will have little defense for
noncompliance in the event of an OSHA citation, and OSHA is
aggressively enforcing this standard. (Exh. C-91)

Complainant also points to a Corporate Safety Manager’s conference which was held on June
14, 1993. The Safety Manager for the Oklahoma City location, Ms. Kelley Mattocks, was at the
conference and attended a presentation by Corporate Safety Manager Walker wherein the LOTO
standard was discussed (Tr. 4924, Exh. C-94).

Second, Complainant relies upon a visit to the Oklahoma City plant during August 1992
by John Lepkowski to support the willful finding. Mr. Lepkowski, at the time, had retired as
Corporate Safety Director and was engaged by Respondent as a safety consultant to provide
LOTO training to its production employees at the so called “affected level.”

Mr. Lepkowski
spent approximately one week at the Oklahoma City plant. As a result of information obtained
during a training session, the union representative, Mr. Tony Carr, expressed concern to Mr.
Lepkowski regarding certain machine operations and whether the activities were subject to
LOTO requirements. Mr. Lepkowski and Ms. Mattocks accompanied Mr. Carr to the production
floor and observed the machines. According to Mr. Carr, Mr. Lepkowski recommended to Ms.
Mattocks that the job functions should be reviewed to determine whether the employees engaged
in those activities should be trained at the “authorized level.”

(Tr. 4535)

Third, Complainant points to a safety citation issued to Respondent’s Des Moines, Iowa
plant by the State of Iowa Occupational Safety and Health Department as support for a willful
finding. By memo dated March 1, 1993, Respondent’s Vice President of Human Resources
forwarded a copy of the citation to all manufacturing plants including Oklahoma City with a
cover memorandum.

Moreover, Respondent received other warnings from OSHA compliance officers. During
June 1993, compliance officer Faye Kearney, an industrial hygienist, initiated an inspection of
Respondent’s worksite for so called ergonomic violations. Ms. Kearney conducted “walk
arounds” of the facility accompanied by Respondent’s Safety Director Mattocks and observed
employees placing parts of their bodies “in the point of operation” of various machines. (Tr.
4633-34) Ms. Kearney pointed these occurrences out to Ms. Mattocks and expressed her
opinion that employees were exposed to injury if the machines were to be unexpectedly
energized. Ms. Kearney discussed the LOTO issues with Ms. Mattocks on at least three separate
occasions. (Tr. 4965, 5007) Complainant also relies upon statements made to Ms. Mattocks by
the safety compliance officer, George McCown, who conducted a safety inspection of
Respondent’s plant commencing November 16, 1993. His inspection forms the basis for the
citation issued in this matter.

Fourth, Complainant points to the reaction of Respondent to a fatal injury sustained by
one of its employees as support for willfulness. Mr. Robert Julian sustained fatal injuries while
performing a size change on a second stage tire assembly machine on October 19, 1993.
Respondent declined to institute LOTO procedures, according to Complainant, “even in the face
of Mr. Julian’s death and the resulting OSHA inspection by George McCown.” (Complainant’s
Brief at pg. 95)

Fifth, Complainant asserts that the job evaluations created by Respondent for the TAM
size changer and the mold/bladder changer establish that “these jobs constitute primarily setup
operations” and therefore, fall within the LOTO standard requirements. (Complainant’s Brief at
pg. 96) Lastly, Complainant argues that injuries and “near-misses” experienced by
Respondent’s employees should have alerted Respondent to hazards presented by various
machines and the need for implementation of LOTO procedures for those machines.

Respondent, on the other hand, argues that the evidence supports the conclusion that it
attempted in good faith to comply with the provisions of the LOTO standard and that good faith
negates the Secretary’s allegations even if they fell short of full compliance. (Respondent’s
Brief at pg. 30 citing Secretary of Labor v. Morrison-Knudsen Co./Yonkers Contracting, 16
BNA OSHC 1105, 1124 (1993)) Respondent relies heavily upon the fact that as early as 1969,
when the Oklahoma City plant commenced operations, a distinction was made between
production work and service and maintenance work performed upon the large number of
machines in the plant. At that time Respondent entered into a contract with an outside
contractor, Ogden Allied, to perform all of the servicing and maintenance functions on the
machines. Ogden maintained a permanent work force of approximately 190 employees at
Respondent’s plant and was paid approximately one million dollars a month by Respondent to
service and maintain the machines. This work activity included preventative and breakdown
service and maintenance. Thus, Respondent argues that as early as 1969 and continuing until the
time of the inspection which initiated this litigation, there was a dichotomy of work functions
performed on the manufacturing machines: major servicing and maintenance performed by
Ogden Allied and production activities including minor servicing and maintenance performed by
Respondent’s employees. Moreover, Respondent ensured that Ogden Allied complied with
LOTO procedures when servicing or maintaining the machines. According to Respondent, this
relationship with Ogden Allied “is central to the facts of this matter and Dayton’s state of mind.”
(Respondent’s Brief at pg. 37) Respondent also points to the fact that after a complete
inspection of Respondent’s worksite, Complainant alleges LOTO violations for only seven
discrete job functions of the hundreds of machine operations performed by Respondent’s
employees.

With respect to the grounds relied upon by the Secretary to support a plant wide
intentional disregard or plain indifference to the LOTO standard, Respondent freely
acknowledges that it had corporate and plant knowledge of the LOTO standard. “Dayton has
argued over and over again that it was at all relevant times knowledgeable of the standard.”
(Respondent Reply Brief at pg. 7) Respondent agrees that it received the memoranda from
Messrs. Lepkowski, Schall and Walker supra . The Lepkowski memo was received shortly after
the LOTO standard was promulgated. Mr. Phil McCowan, Respondent’s Safety Manager
reviewed the memo and conducted an analysis of the machinery within the plant for LOTO
compliance. Mr. McCowan was the author of the safe operating procedures for each
classification of machine in the plant and had significant experience in the operation of those
machines. Mr. McCowan concluded, based upon his reading of the new standard, that
Respondent’s employees were engaged in production activities and that Ogden Allied personnel
were engaged in service and maintenance within the meaning of the standard. McCowan
contacted Ogden Allied to ensure that they complied with the standard when performing
servicing and maintenance activities as required. Mr. McCowan did not perform a formal
analysis of each machine; rather, he relied primarily upon his experience and discussions with
Mr. Lepkowski to arrive at the conclusion that none of the activities which are the subject of this
litigation required that the machines be lockout. (Tr. 4411- 37, 4454, 4458) The Schall memo,
supra , was received by Mr. McCowan after he had completed his review of the machines in
relation to the LOTO standard. This memo requested a review of equipment to determine which
machinery “cannot be physically locked out.” (Exh. C-85) Mr. McCowan testified that Ogden
Allied locked out all machines as required to perform servicing or maintenance. Ms. Kelley
Mattocks, Respondent’s Safety Manager during December 1992, received and reviewed the
Walker memo supra . Ms. Mattocks had succeeded Mr. McCowan and, upon receipt of the
Walker memo, she contacted the supervisors of the production departments to determine whether
any of the production activities performed by the Dayton Tire machine operators had changed.
She made this inquiry because she knew that a distinction had been made at the time the plant
had opened between service and maintenance activities and production work and that division of
labor had been confirmed by her predecessor, Phil McCowan, during 1989. (Tr. 4939, 4994)
She also knew that service and maintenance work was to be performed by the outside contractor,
Ogden Allied, and production work was performed by Respondent’s employees. It was her
belief, upon being notified by the production supervisors that no change had been made in the
work activities of machine operators, that the company remained in compliance with the LOTO
standard. (Tr. 4939, 4970) Moreover, Ms. Mattocks knew that the Oklahoma City plant was in
a “unique situation”; that is, most of the other manufacturing plants within the company
performed their own servicing and maintenance activities and the Oklahoma site contracted
these activities out to Ogden Allied. (Tr. 4945) Ms. Mattocks also participated in the hiring of
Mr. Lepkowski as a consultant to train Respondent’s production employees at the so called
“affected” level. See footnote 8. In addition, Ms. Mattocks required Ogden Allied to conduct
periodic inspections as required by the standard (1910.147(c)(6)(i) and (ii)) to ensure that they
(Ogden Allied) complied with the LOTO standard. (Tr. 4961-62)

Respondent also disputes the Secretary’s argument that the events surrounding the visit
of John Lepkowski to Respondent’s worksite during August 1992 supports the willful
allegations. According to the union representative, Tony Carr, he accompanied Kelley Mattocks
and John Lepkowski onto the production floor and observed the TAMS, the curing presses and
the module machines. According to Mr. Carr, Mr. Lepkowski stated that these operations should
be considered for training at the authorized level. (Tr. 4533-35) Ms. Mattocks, on the other
hand, acknowledged that she accompanied Messrs. Carr and Lepkowski onto the production
floor; however, they did not view a size change on the TAM nor a mold change on the curing
press or a stone change on the module machine. (Tr. 4997-98) It is alleged by the Secretary that
these activities in part, exposed employees to injury or death. Respondent argues that Carr’s
testimony, in his capacity as the employee representative, is hearsay

and should not be given
any weight. Moreover, Mr. Lepkowski was listed as a government witness but was not called to
testify. According to Respondent, Lepkowski’s statements were “equivocating and merely
suggestive,” and not notice of noncompliance with the LOTO standard.

With respect to the citation issued to Respondent’s Des Moines, Iowa plant by the State
of Iowa and distributed to Respondent’s Oklahoma plant, Respondent asserts that the Secretary
failed to establish any similarity between the operations at the Iowa plant and the Oklahoma City
location. Indeed, in Respondent’s view, the face of the citation itself removes any probative
value of the document by stating “the issuance of this citation does not constitute a finding that a
violation of the Act has occurred....” (Exh. C-92) The Secretary also failed to present any
evidence as to the disposition of the Iowa citation and, Respondent argues, the citation should
not be used as notice that violations were present at the Oklahoma City plant. Respondent also
argues that the concern expressed by Industrial Hygienist Faye Kearney and Ms. Mattocks’
reaction to those concerns are consistent with Respondent’s good faith effort to comply with the
LOTO standard. Ms. Mattocks believed in good faith that all servicing and maintenance
activities requiring LOTO procedures were performed by employees of Ogden Allied.
Moreover, Ms. Kearney had not concluded that the activities that she observed violated the
LOTO standard and she referred the matter to a safety specialist in her office. (Tr. 4651, 4653)
Indeed, the Area Director, Mr. White did not place any reliance upon Ms. Kearney’s
observations because he was not “comfortable” with her level of expertise in the recognization
of safety hazards. (Tr. 4731-32) Ms. Mattocks also testified that Ms. Kearney did not tell her
that employees working in the tubing department, the beadwinding department, the set up
department (TAMS ), the banbury department or the curing department were exposed to hazards
or were working in a zone of danger with respect to those areas with the exception that
employees could slip and fall on oil accumulated on the “top hat” of the curing press. (Tr. 5002-05) In addition, the other “warning” received by Respondent was conveyed by compliance
officer George McCown whose investigation formed the basis for the citation. Respondent
clearly disagrees with Mr. McCown. Moreover, Mr. McCown did not testify at the trial in this
matter; thus, there is no direct evidence of the statements made by Mr. McCown, if any, to
Respondent’s representatives.

Respondent also disagrees that its reaction to the death of employee Robert Julian
supports a willful finding in this case. Respondent points to the fact that an investigation was
immediately conducted by Respondent to determine the cause and necessary corrective action.
As a result of its investigation, Respondent reprogrammed the machine’s computer and instituted
pinning devices which prevent machine parts from moving during size changes. (Tr. 4497-4500,
4976-78, 5743-46, 5761-64; Exh. C-17)

With respect to the written job descriptions (Exhs. C-9, 14, 15,16), Respondent argues
that the job tasks that Complainant describes as “clearly” falling within the definition of
servicing or maintenance are on the face of those job descriptions, just as easily characterized as
minor servicing within the meaning of the standard and, therefore, fall within the exception to
the standard. Moreover, with respect to the so called “near misses” and injuries cited by
Complainant in support of the claim that Respondent had knowledge of the hazards to which its
employees were exposed, Respondent asserts that none of the instances listed by Complainant
support the conclusion that noncompliance with the LOTO standard caused the injuries or near
misses.

Based upon the foregoing, it cannot be concluded that Respondent intentionally
disregarded or was plainly indifferent to the standard as a matter of corporate policy throughout
the Oklahoma City location. Complainant ignores the fact that since 1969 Respondent had
assigned the service and maintenance function to Ogden Allied which maintained
approximately 190 permanent employees on site at the plant. According to Ms. Mattocks,
service and maintenance was and is performed by Respondent’s employees at other
manufacturing plants within the corporate family. (Tr. 4948) It is undisputed that Respondent
had corporate knowledge of the LOTO standard. It cannot be said, however, that the facts
support the conclusion that it was Respondent’s state of mind to disregard the standard nor was it
plainly indifferent to its requirements throughout the Oklahoma City site. The various
memoranda from corporate headquarters to all of the production locations as well as the actions
of Mr. McCowan and Ms. Mattocks, in light of the memoranda, indicate an effort was made to
comply with the standard on a plant wide basis. The management team at the Oklahoma City
location relied, in large measure, upon the division of labor between Ogden Allied and
Respondent’s production employees and all of Respondent’s production employees were trained
at the affected level. The evaluation of that division by Mr. McCowan in relation to the new
LOTO standard was not, in retrospect, sufficiently thorough to disclose activities performed by
Respondent’s employees which required LOTO procedures; however, the Secretary, after a
complete investigation of Respondent’s worksite, discovered only seven discrete work activities
which, he believes, necessitates LOTO procedures. Those findings, in a 72 acre manufacturing
facility containing hundreds of different types of machines, do not support a conclusion that, as a
matter of corporate policy, Respondent had the state of mind to intentionally disregard or be
plainly indifferent to the requirements of the LOTO standard on a plant wide basis.

This is not to say, however, that the Secretary has failed to establish willful conduct on
the part of the Respondent with respect to individual violations cited by the Secretary. Although
the Secretary has failed to establish a intentional disregard or plain indifference and a state of
mind to violate the LOTO standard plant wide as a matter of policy, the facts supporting each
alleged violation must be analyzed, assuming that a violation has been established, to determine
whether a sufficient basis exists to conclude that the Secretary was correct in characterizing each
violation as willful. I turn now to an analysis of the facts surrounding Respondent’s violation of
the standard with regard to the TAM machines to determine whether Respondent’s violation of
the standard, as found above, is willful.

As previously stated, a willful violation is characterized by a heightened awareness of
conduct or conditions which present hazards to employees and by a state of mind consistent with
an intentional disregard or plain indifference to the violative conduct or conditions. Williams
Enterprises, Inc. supra . Because Respondent was in a unique corporate situation by contracting
the service and maintenance functions out to another contractor, it is reasonable to conclude, as
is strongly argued by Respondent, that its actions were consistent with a good faith belief and
effort to comply with the LOTO standard throughout the Oklahoma City plant. The issue,
however, is whether Respondent had notice of possible violations of the LOTO standard within
its Oklahoma City plant relating to specific machines or activities. In other words, did
Respondent possess information which created or should have created a heightened awareness of
hazardous conditions relating to specific machines or work activities within the plant. That
information was transmitted to Respondent via a memorandum dated March 1, 1993 from C.R.
Ramsey, Vice President of Human Resources to all company presidents including the manager
of the Oklahoma City location. (Exh. C-93) Attached to the memorandum was a copy of a
citation issued to Respondent’s Des Moines, Iowa manufacturing plant wherein, inter alia ,
various violations of the LOTO standard were alleged with respect to specific machines. (Exh.
C-92) It is remarkable that these significant documents were offered and entered into evidence
without any testimony being elicited by either party regarding the actions of Respondent, if any,
upon receipt of the documents.

The Ramsey memo expressed concern regarding the number of violations and the size of
the penalty assessed as a result of the Des Moines safety inspection conducted by the State of
Iowa. Included in the memo is the following language:

I ask that you share this information with your plant managers and
have them review all of the specific violations (attached) and
implement countermeasures to correct similar deficiencies; and
establish methods to maintain compliance in the future. Under
OSHA law, should you have similar violations as Des Moines, you
could be subject to a repeat citation which carries a penalty of up
to $70,000 per violation.

The citation attached to this memo lists violations of the LOTO standard relating to machines
and production activities with the same identity as machines and production activities located at
Respondent’s Oklahoma City facility.

Moreover, one of the alleged violations should have
alerted the management team at the Oklahoma City location that service and maintenance
functions were also performed by an outside contractor at the Des Moines plant, if they were not
already aware of that fact. The alleged violation stated that “outside contractors on site had not
signed an agreement to assure an exchange of LOTO programs with the employees.” (Exh. C-92, Item 24 alleging a violation of § 1910.147(f)(2)(i)) Thus, the same division of job functions
between service and maintenance and production work existed at the Des Moines and Oklahoma
City locations and should have; indeed, must have, heighten the awareness of Respondent’s
management personnel at the Oklahoma City plant that the violations cited at the Des Moines
location were likely to exist at their location. There is nothing in the record indicating that
Respondent took any action after receiving the Ramsey memo to determine whether the
conditions described in the Des Moines citation were present at the Oklahoma City plant. That
failure to act, notwithstanding a heightened awareness of possible LOTO violations at the plant,
strongly supports the conclusion that Respondent was, at the least, plainly indifferent to the
requirements of the LOTO standard for the activities and machines listed in the citation. See
United States v. Dye Construction Co. supra ; Georgia Electric Company supra ; Williams
Enterprises, Inc. supra. Moreover, Respondent’s failure to act in response to the Des Moines
citation undermines its good faith defense regarding conditions in its Oklahoma City plant which
were similar to the violations uncovered at the Des Moines location. See Secretary of Labor v.
Mel Jarvis Construction Co. Inc. , 10 BNA 1052 (1981); Secretary of Labor v. Morreson-Krudsen Co./Yonkers Contracting Co., A Joint Venture , 16 BNA 1105 (1993).

For the foregoing reasons, it is necessary to analyze each alleged violation in relation to
the Des Moines citation to determine whether the across the board finding of willful conduct by
the Secretary can be sustained by the facts. With respect to the tire assembly machines (TAMS),
it is clear that the Des Moines citations cited the failure of that manufacturing facility to institute
hazardous energy control procedures (LOTO) for the tire building machines located within that
plant. A review of that citation by the Oklahoma City management team should have
“heightened” their awareness of the need to evaluate the work activities of their TAM operators
and provide necessary LOTO procedures. In light of Respondent’s failure to act responsibly
under the circumstances, item 1 of the citation is affirmed as a willful citation. The issue of
“willfulness” for each of the remaining violations will be discussed seriatim .

Item 2 Beadwinder

Item 2 of Citation I reads as follows:

29 C.F.R. § 1910.147(c)(4)(i): Procedures were not developed,
documented and utilized for the control of potentially hazardous energy when
employees were engaged in activities covered by this section: At the plant[,] a
documented procedure to control potential hazardous energy for each type of
machine was not being used by employees setting up bead winding machine.

This alleged violation relates to the activities of employees engaged in the operation of
the bead winding machine which produces beads (circles) of bronzed steel wire coated with
rubber. The beads are similar to fan belts and are designed to secure the tire at the rim of the
steel wheel. Specifically, Dayton Tire is cited for a failure to implement LOTO procedures
when employees are changing reels of wire, chucks and ply blocks as well as rethreading broken
wires.

Background

During the inspection period of October 19, 1993 through April 18, 1994, there were five
beadwinder machines located at the Respondent’s plant. Nos. 3, 4 and 5 are conventional
winders which require an operator to remove the finished bead from the machine as well as to
change the wire reels, chucks and ply blocks. Nos. 1 and 2 are automated machines with a fence
and interlocked gates surrounding the area where large reels of wire are located. Thus, there is
no evidence that employees are exposed to hazards from the automated beadwinders when
changing reels of wire because Nos. 1 and 2 are de-energized when the gates are opened.
However, employees are require to change the chuck and ply blocks on Nos. 1 and 2 as they do
for the conventional beadwinders. The beadwinder is a large machine, measuring approximately
40' long x 8' wide x 12' high and operates at high speed. The beadwinder consists of the wire
letoff area, extruder, slab stock feeder, auger type screw, drive motor, Festoon assembly and the
winder head assembly which consist of the chuck and pulleys. Reels of wire located in the letoff
area feed four or five strands of wire parallel to each other through a number of pulleys. These
wires are coated with rubber in the extruder head assembly, travel across the precast wheel,
through the slitter assembly and feeder bar, and then as a “bead”, rotates four or five times on a
circular disk known as a chuck. (Tr. 3571-80; Exhs. 1E, 1F, 1G, 1H, 2C1, 2C2 and 2C3)

The beadwinder is energized by electrical and pneumatic power as well as gravity, and
produces approximately 6,000 to 8,000 beads in a 10 hour day. During normal operations, the
beadwinder operator is seated to the right of the chuck which is approximately three (3) feet
above the floor, and removes the bead from the chuck after they are formed. (Tr. 3570) The
temperature of the beads is approximately 150 degrees as they come off the chuck and the
operator usually has gaze tape around his/her fingers to prevent burning. (Tr. 3625) In order to
produce different size beads for different size tires, the beadwinder operator must change the
chuck size and the ply blocks. He also has to increase or decrease the size of the wire depending
on the specifications. The machine must be stopped to perform these activities. (Tr. 3646-48)

  1. Reel change

The operator is required to replace the reels of wire in the letoff area when the reel is
empty. Reel changes occur as frequently as 10 times a day. The operator must also “rethread”
the wire when it breaks. The wire reels are located in the letoff area which is enclosed by
protective gates. However, unlike the automated beadwinders, the gates on Nos. 3, 4 and 5 are
not interlocked and will not disengage the machine when opened. Rather, a magnetic sensor
switch in the letoff is designed to shut the beadwinder down automatically when a wire breaks or
is defective. The machine will also stop if a reel runs out of wire. There is testimony that
occasionally the magnetic sensor will not function and the beadwinder continues to run
notwithstanding a problem with the wire or the reels. (Tr. 3594-98)

When a reel change is required, the operator turns the beadwinder switch off and unlocks
the fenced letoff area so that he can raise the clamps and remove the old reel. The wire reels
weigh between 350 and 1025 lbs. Once the reel is pulled out, the operator removes the shaft and
bearing from the old reel and reinserts them in the new reel. The new reel is rolled onto slicer
ramps, loaded into the staging area and clamped in place. The operator threads the wire from the
reel across groups of pulleys in a figure eight pattern and through the extruder to the extruder
head assembly where the wires are coated with rubber. A typical reel change takes about 6
minutes. (Tr. 3599-3601) The Secretary asserts that employees are exposed to being struck by
the moving parts in the letoff area and are exposed to nip points between the rolls and the wire
resulting in serious injuries if the machine is unexpectedly energized during a reel change.

In the event that a wire strand breaks during production, the operator turns the
beadwinder switch off, cuts the wire and removes the wire remnants from the system. The
operator rethreads the wire from the point where it broke through the extruder head assembly
where it is coated with rubber. (Tr. 3594-3601) The Secretary asserts that employees are
exposed to the hazard of being jerked or pulled into the other tensioned wires resulting in
amputation or lacerations of the fingers when engaged in rethreading a broken wire.

  1. Chuck and Ply block change

The chuck change requires the operator to manually jog the chuck to the top center
position by operating the manual control on the winder head control panel above the chuck. The
power on the control panel is turned off and the two bolts on the chuck are removed. The old
chuck is removed and a new one is inserted. The chuck is aligned and the bolts are tightened.
(Tr. 3648-50) The Secretary asserts that employees are exposed to being struck by the chuck if
it unexpectedly energized when the bolts were removed. The Secretary also alleges that
employees were exposed to the hazard of having their hands entangled in the chuck if the
beadwinder unexpectedly energized during the chuck change.

The operator follows the same procedure for changing the ply block located in the arm
that rotates the chuck. First the ply block is jogged into position from the control panel. The
operator then switches the power off at the control panel and proceeds to the back of the winder
head assembly. The operator cannot see the control panel from this position. By bending over
the ply block lugs and inserting a T-handle tool to rotate the ply block counterclockwise, the
operator physically forces the ply block out and inserts a new one. (Tr. 3652-55) The Secretary
alleges that employees engaged in this activity are exposed to having their arms struck by the
rocker assembly or fingers crushed by the ply block in the event that the machine is
unexpectedly energized.

Beadwinder operators are trained by other employees when they first start operating the
machine. Dayton Tire has no written LOTO procedures for reel, chuck or ply block changes.
Employees were never trained at the authorized level or required to lockout the beadwinder
during tool changes. (Tr. 3661-62) Only Ogden Allied personnel were authorized to lock out
the on/off power switch on the main control panel. (Tr. 3633-34) Dayton Tire has equipped the
beadwinders with emergency stop buttons, a kick plate and safety ropes. Emergency stop
buttons are located on the winder head control panel and the electric control panel for the drive
motor. An emergency switch is also located on the control panel for the drive motor. A kick
plate to stop the machine is located at the foot of the chuck. Safety ropes are strung above the
chuck, the catwalks where the slab stock is feed into the overhead converter, and above the drive
motor to the letoff area; however, the layout of the safety ropes differs from one beadwinder to
the other. An employee hitting a stop button, kicking the safety plate, or pulling a safety rope or
switch can disconnect the electrical power to the machine. (Tr. 3683-87; Exh. C-144) These
safety measures are not usually used by employees during reel, chuck or ply block changes if the
machine is unexpectedly energized. The only beadwinder who testified stated that he would
release the wire and back away rather than pull the safety rope in the event the machine became
unexpectedly energized. (Tr. 3690-91)

Discussion

Respondent contends that the activities performed by operators of the beadwinder are not
service and maintenance as defined by the standard. As stated at footnote 7 supra , tool changes,
where the employee may be exposed to the unexpected energization or release of hazardous
energy, constitutes service and maintenance under the LOTO standard. Respondent has failed to
establish that the tooling activities on the beadwinder fall within the exception of minor
servicing, footnote 5 supra, for the simple reason that the beadwinder is not engaged in
production during the chuck and ply block change or during the rethreading of the wire when it
breaks. Further, the beadwinder is not in production during the reel change.

In order to prevail on this violation, the Secretary must prove that: (1) the standard
applies; (2) Dayton Tire failed to comply with the terms of the standard; (3) employees had
access to the cited condition; and (4) Dayton Tire knew or, with the exercise of reasonable
diligence, could have known of the violative condition. Astra Pharmaceutical Products, Inc.
supra ; Gary Concrete Products supra .

The Secretary has presented sufficient evidence to support the conclusion that employees
were exposed to the hazards of unexpected energization of the beadwinders Nos. 3, 4 and 5
during reel changes. These conventional beadwinders do not have a multiple step process to
activate the machine. See General Motors Corp., Delco Chassis Div. supra . The sensors in the
letoff area which shut the machine down when a wire breaks allows the machine to operate when
wire is rethread in a figure 8 around the pulleys. (Tr. 3612-13) Thus, employees rethreading
wire have no foreknowledge of an accidental start up until the machine is energized with an
immediate exposure to injury. Employee testimony established that employees changing a wire
reel in the letoff area could be struck by a rotating post, the brake arm assembly moving back
and forth or the movement of the pulleys if the beadwinder was unexpectedly energized.
Further, employees were exposed to hazards of having fingers severely cut or amputated by the
wires or pulleys by a sudden startup. Finally, the operator could be pulled and jerked into the
other wires and sustain serious lacerations while engaged in rethreading the wire if the machine
was unexpectedly energized. (Tr. 3612-13)

The only beadwinder employee who testified stated that he has experienced unexpected
energization during reel changes but was not injured. The employee stated that on a number of
occasions, supervisors and maintenance people have accidentally activated the beadwinder while
he was working in the letoff area. Moreover, the letoff sensor shut off switch does not prevent
unexpected startups once the wire is rethread through the pulleys in a figure eight pattern. The
drive motor control panel is located 20 feet to the left of the letoff area and is not readily
accessible to the employee during a reel change. (Tr. 3610-13)

With regard to changing the chuck and ply block, the Secretary has established that
employees were exposed to serious injuries while performing these changes on all five
beadwinders. Unexpected energization of the beadwinder during a chuck change would likely
throw the chuck onto the employee or the employee’s hands could be entangled in the rotating
chuck with resulting serious injuries. (Tr. 3651) Moreover, employees were exposed to the
hazard of having fingers crushed by the ply block if it unexpectedly rotated. Employees were
also exposed to the danger of being struck on their arms by the rocker assembly during a ply
block change if the machine became unexpectedly energized. (Tr. 3656-68)

Although the beadwinder operator testified that he has not experienced unexpected
movement of the machine during chuck and ply block changes, unexpected energization could
occur if someone accidentally hit a control button and energized the beadwinder when the
operator is engaged in a chuck change. (Tr. 3673) Further, there is testimony that the location
of the beadwinder control panel to the chuck would not prevent hazards of unexpected
energizations because another employee could reset the control panel without the operator’s
knowledge. (Tr. 5139) Likewise, an operator changing the ply block is exposed to the hazard of
another person unexpectedly energizing the beadwinder since the operator is behind the winder
head assembly and can not be seen from the control panels at the front of the machine.

Employee testimony also established that safety ropes, stop buttons, stop switch and kick
plates are not reliable alternative means to LOTO procedures because they do not always
deactivate the machine. These safety measures were designed to stop the machine in an
emergency. They were not designed to prevent unexpected energization of the machine. (Tr.
3697-98) Moreover, employees have little or no time to get out of the zone of danger in the
event of an unexpected energization of the machine.

The facts establish that Dayton Tire failed to implement the required LOTO procedures
for tool changes on beadwinders. Dayton Tire employees were exposed to the unexpected
release of hazardous energy from the conventional beadwinders (Nos. 3, 4 and 5) while changing
wire reels, chucks and ply blocks, and they were exposed to unexpected energization during
chuck and ply block changes on the automated beadwinders (Nos. 1 and 2). Based upon the
record, there is insufficient evidence to find a violation as to the automated Beadwinders Nos. 1
and 2 during reel changes since the machines are de-energized when the gates are opened.
However, employees were exposed to unexpected energization during chuck and ply block
changes on Nos. 1 and 2. For the foregoing reasons, the Complainant has met his burden of
proof and a violation of the standard as to the aforesaid Beadwinders is affirmed.

The Secretary alleges that Respondent willfully failed to institute LOTO procedures
when employees were engaged in performing the aforesaid work activities on the bead winding
machine. This allegation is based upon Complainant’s belief that Respondent, as a matter of
plant wide corporate policy, intentionally disregarded or was plainly indifferent to the
requirements of the LOTO standard (supra pgs. 24-27). As previously discussed the evidence
does not support the conclusion that Respondent, as a matter of plant wide corporate policy,
willfully violated the LOTO standard. Moreover, there is nothing in the record in support of the
conclusion that Respondent possessed a “heightened awareness” that LOTO procedures should
have been instituted when beadwinder operators were engaged in the activities described above.
Beadwinders were not included in the “Des Moines citation.” Therefore that citation did not
provide the Respondent with a “heighten awareness” of the violation. Thus, there is no basis for
concluding that this violation is “willful” within the meaning of the Act.

It is clear, however, that a violation of the standard has been established and
Respondent’s employees were exposed to serious physical harm. Section 17(k) of the Act
defines a serious violation as follows:

For purposes of this section, a serious violation shall be deemed to exist in
a place of employment if there is a substantial probability that death or serious
physical harm could result from a condition which exists, or from one or more
practices, means, methods, operations, or processes which have been adopted or
are in use, in such place of employment unless the employer did not, and could
not with the exercise of reasonable diligence, know of the presence of the
violation.

29 CFR § 666(k).

The Secretary does not have to prove that there is a substantial probability that an
accident will occur, but rather that death or serious physical harm could occur. See East Texas
Motor Freight, Inc. v. OSHRC , 671 F.2d 845 (5th Cir. 1982); Bethlehem Steel Corp. v. OSHRC ,
607 F.2d 1069 (3rd Cir. 1979). Employee testimony supports the conclusion that failure to
implement LOTO procedures could cause serious physical harm to the employees such as severe
lacerations of the hands and arms or amputations of fingers. (Tr. 3612-14, 3657-58) According
to the testimony, employees reported that supervisors and maintenance would unexpectedly
energized the beadwinder while the operator was engaged in a tool or reel changes. (Tr. 3610-12,
3643-46) This evidence was elicited by Complainant’s Counsel without objection by
Respondent that the evidence was irrelevant to the willful litigation, or was beyond the scope of
the citation.

Although the pleadings allege that Respondent “willfully” violated the alleged standard,
the Secretary also presented evidence in support of a serious violation; that is, (a) that the
employer knew or with exercise of reasonable diligence, should have known of the violations
and (b) that employees were exposed to serious physical harm or death. The first element was
satisfied by Complainant in his attempt to establish willfulness. The second element was
established by employee testimony. Therefore, it is concluded that the parties tried this item by
implied consent as a serious violation of 29 CFR 1910.147(c)(4)(i). See Secretary of Labor v.
Dye Construction Co. , 6 BNA OSHC 1685 (1978); Secretary of Labor v. Central Plains
Contracting , 1 BNA OSHC 2188 (1981). See also Secretary of Labor v. Dye Construction Co. ,
4 BNA OSHC 144 (1976). Accordingly, the citation and complaint are amended pursuant to
Rule 15(b) of the Federal Rules of Civil Procedure to allege a serious violation and the citation,
as amended, is affirmed.

Item 3(a) Curing Press and 3(b) Radial Doper

Item 3 of Citation I reads as follows:

29 C.F.R. § 1910.147(c)(4)(i): Procedures were not developed,
documented and utilized for the control of potentially hazardous energy when
employees were engaged in activities covered by this section: At the plant[,] a
documented procedure to control potential hazardous energy for each type of
machine was not being used by employees setting up curing presses and cleaning
doper machines.

This violation relates to the alleged service and maintenance functions of setting up and
changing the PCI rings, mold and bladder in the curing press and the activities of employees
engaged in cleaning doper machines. Although the Secretary issued a separate violation of the
above standard for each type of machine for which LOTO procedures are required (Tr. 5401), in
this instance two distinctly different types of machines have been combined into one item.

Based upon the evidence presented as well as a personal view of Respondent’s plant, the
functions of the machines as well as the employee’s work activity are clearly different and
require separate analyses. For these reasons, item 3 of the citation will be separated into item
3(a) curing press and 3(b) doper machine.

Item 3(a) Curing Press

Background

During the period of inspection, Respondent’s plant contained two hundred and twenty
curing presses of which one hundred and eighty are normally in use. (Tr. 3894; Ct. Exh. 4-Curing Press 4) The curing press vulcanizes treated green tires by heat and pressure into a
finished tire. A curing press is 10 feet long, 12 feet wide and 20 feet tall and consist, in pertinent
part, of two molds, two tire loaders, two “top hats” and a post cure inflator (PCI) unit. (Tr.
3899-3900; Exh. C-149) The molds, located adjacent to each other inside the press, are made of
aluminum and steel and weigh approximately 400 pounds. Inside each mold is a rubber bladder
which is inflated with steam to press the tire into the side of the mold. The top half of the molds
are bolted to 2 inch thick metal platens on the top half of the curing press. The bottom half of
the molds are bolted to the bottom half of the press. The tire loaders are attached to the top half
of the press. Top hats sit on the floor in front of the press. (Tr. 3897-99) The four PCIs located
at the rear of the curing press cool the tires upon completion of the curing process. A PCI has a
top and bottom chuck, PCI rings and PCI ring bolts. Two bolts secure a PCI ring to a chuck.
The PCI rings have teeth or gears that must line up to close the rings.

A bull gear and a side link located on the right side of the curing press rotate to move the
top half of the press up and down. (Tr. 3900-04; Ct. Exh. 4-Curing Press 7) A safety bar
surrounding the tire loader and a safety bar located near the bottom half of the press will stop the
press and the loaders if an employee pushes either bar. To open the press, an employee pushes
the bar until the press is opened to the desire width. A T-shape safety rope is located inside the
tire loader safety bar and an emergency stop button is located on the front control panel. (Exhs.
C-149; C-2F1; Tr. 3958-64, 4026-27, 4153-54)

The curing press is energized by electric, pneumatic, and steam energy. Both the top half
and the bottom half of the press move up and down. The tire loaders move with the top half of
the press or they can move independently along a chain system. The rubber bladders are inflated
with steam and hot water from the bag well to press the tire into the mold. (Tr. 4101-03)
Electrical and pneumatic energy power the PCI rings. The bottom PCI ring moves up to a close
position and down to an open position while the top PCI ring remains stationary. (Tr. 3904) The
curing press main control panel is located on the right front of the press; however, the PCI unit
has its own control panel at the rear of the press. (Tr. 4059) The two control panels are separate
and distinct except that both contain a tire loader button. (Tr. 4060-63) If the tire loader is
malfunctioning and cannot be activated from the curing press control panel, it can be activated
from the PCI control panel as long as the press is in automatic, the stop/play switches are in a
certain position, and if there are no tires on the loader. (Tr. 4228, 4264)

A Curing press operator is responsible for approximately 50 to 60 curing presses. The
operation is initiated by placing the green tires on the top hats. (Tr. 4071) The tire loaders move
on a motor and chain system and pick up the green tires from the top hats and set the tires in the
center of the bottom mold. The rubber bladder inflates and presses the tire into the mold to form
the tread design and lettering. As the tire is stretched, the top half of the press comes down to
meet the bottom half of the press. The tire is then vulcanized by a combination of steam, heat
and pressure. Upon completion of this process, the tires are transferred from the molds to the
PCI unit. Air is inflated into the tires until they are cooled. Finally, the PCI rings release the
cooled tires onto a conveyor which moves them to the Finally Inspection Department. (Tr.
3905-06)

An employee known as a mold/bladder changer changes the molds and the PCI rings
consistent with the type or size of tire that is produced. Mold/bladder changers are trained by
fellow employees. (Tr. 4000, 4016) There are not written procedures for a mold and PCI ring
change except that Respondent requires its employees to tagout the curing press during this
process. (Tr. 4031-32) To complete a mold change, an employee must change the mold, the
bladder, ejector head, the heat shield, the split rings, the ball nose and the rings around the dowel
pins. The mold/bladder changer stands on the tophats and is positioned between the press and a
safety bar. (Exh. C-2F1) The curing press is placed in the manual mode but remains energized.
The mold/bladder changer jogs the press approximately 25 times into different positions during a
mold change. First, the changer opens the press and removes the bladder, the split rings and the
bottom mold bolts. At this point, the top half of the press is approximately 4 feet above the
changer’s head. The mold/bladder changer’s arms and upper body are positioned beneath the
tire loader while loosening and tightening the bolts for the bottom mold. The changer then jogs
the press into a half open position to remove the ball nose. At this point, the tire loader is
approximately 2 feet above the mold/bladder changer’s head. To change the ejector head, the
press is lowered 18 inches and is right above the changer’s arm. The top mold bolts are then
loosened which requires the mold/bladder changer to work directly underneath the tire loader.
(Tr. 3908, 3968, 3979-85)

After the bolts are loosened, a forklift is used to lift the molds out of the press and insert
the new top mold. The top mold bolts are tightened and the press is raised approximately 18
inches to install the new ejector head. The press is raised another foot to install the ball nose.
The press is then fully opened so that the bottom mold can be inserted and tightened. Finally,
the mold/bladder changer inserts a new split ring and bladder. A mold change takes
approximately two hours to complete. (Tr. 3996-99) The Secretary argues that mold/bladder
changers are exposed, in the event of unexpected energization, to the hazards associated with
movement of the top half of the press which could cause serious bodily injury (crushing) when
performing setup operations on the curing press. The Secretary asserts that employees are also
exposed to the hazard of the tire loaders unexpectedly descending on the employee while
performing tool changes. Finally, the Secretary alleges that employees are exposed to the
unexpected release of steam and hot water which could cause severe burns.

To change the PCI rings, the mold/bladder changer places the PCI unit in manual. Next,
the changer pneumatically opens the chuck and turns the air off. The bottom chuck and ring are
lowered in order to open the chuck. The top chuck and ring are stationary. (Tr. 3904) The bolts
are loosened and the yoke is then opened to remove the old rings. After the new rings are
inserted, the mold/bladder changer closes the yoke and reinserts the bolts. This process is
repeated until all four PCI have been serviced. A PCI ring change takes approximately 2 hours
to complete. (Tr. 3908, 4013-15; Ct. Exh. 4-Curing Press 14) The Secretary contends that
employees performing PCI ring changes are exposed to the unexpected movement of the PCI
which could result in broken fingers or hands caught between the pinch points of the two rings.

Discussion

Respondent disputes the applicability of the LOTO standard to the curing press and
asserts that the above described tool changes fall within the minor service and maintenance
exception. Dayton Tire argues that mold/bladder changers were not exposed to unexpected
movement of the top half of the press or the tire loader for the following reasons. First,
Respondent argues that the top half of the press and the tire loader cannot fall or move
unexpectedly because they are geared in such a manner that they can only be lowered by the
curing press motor. Respondent points to the fact that the configuration of the track on which
the side link travels keeps the press open and placing the press in manual prevents it from
moving unless an employee pushes the control button. Moreover, a pneumatic safety device on
the top of the curing press prevents the loader from descending unexpectedly. (Tr. 4029-30,
4084) Respondent also argues that emergency stop buttons, safety ropes and bars are alternative
measures to LOTO since they will stop all movement when engaged. In addition, Dayton Tire
requires mold/bladder changers to tagout the machine to prevent other employees from starting
up the machine. (Tr. 4040-44) The Respondent also asserts that mold/bladder changers were
not exposed to unexpected movement during PCI ring change. Finally, Dayton Tire argues that
it is infeasible to lockout the curing press because it will take an entire shift to complete a mold
and PCI ring change and therefore, compliance will unreasonably disrupt production.
Respondent states that blocking the top half of the mold and the Dayton Loader will cause the
entire press to jack out of the floor, breaking the mechanism holding the loader, and causing the
loader to crash to the floor. (Respondent’s Post-Trial Brief at pg. 64-66)

The Secretary has established that the LOTO standard, which covers service and
maintenance in which unexpected energization of equipment could cause injury to employees,
applies to the curing press. The tasks performed by mold/bladder changers constitute service
and maintenance as defined by the LOTO standard. See footnote 7 supra . The mold, bladder
and PCI ring changes are basic setup operations required to be performed in order to prepare the
curing press for production. Although Dayton Tire argues that these activities are minor, they
have failed to establish that mold and PCI ring changes fall within the minor servicing exception
standard for the simple reason that the curing press is not engaged in production during these
servicing activities. Westvaco supra . Moreover, the work activity clearly constitutes major
modifications to machine components and go far beyond the minor machine adjustments made
during production operations that are contemplated by the “minor adjustment” exception to the
standard.

The Secretary has presented sufficient evidence to establish a violation of the cited
standard. Mold/bladder changers were exposed to unexpected energization of the curing press
which could result in serious bodily injury or death when placing their bodies in the path of the
press during a mold change. The evidence indicates that an employee could inadvertently hit a
button on the front control panel and unintentionally energize the press. (Tr. 4042-46)
Furthermore, the curing press has continued to descend unexpectedly even though the
mold/bladder changer had released the close button. (Tr. 4077-80, 4274-75) The top mold has
descended because of brake failure. (Tr. 4295-97) The press has unexpectedly closed with such
force as to break the dowel pins. (Tr. 4342-44)              Employee testimony reveals that the tire loader could unexpectedly energize during a
mold change if an employee accidentally puts the curing press in automatic and turns the tire
loader switch on the PCI control panel while a mold/bladder changer is working on the other side
of the press. (Tr. 4090, 4228, 4264) Mold/bladder changers have inadvertently pressed the
wrong button on the front control panel and caused the tire loader to descend rather than ascend.
(Tr. 4081) On one occasion, the tire loader fell because the chains broke. (Tr. 3937-38, 4009,
4057) The cause of some machine movements were unexplained. (T. 4342-44) The facts are
clear that mold/bladder changers could sustain crushing injuries from unexpected energization of
the curing press because their upper body is in the path of the press and the tire loader during a
mold change.

The Secretary has also established that employees have sustained severe burns from the
hazardous release of steam and hot water during a bladder change. Employees were not required
to control the steam and hot water in the bag well when removing the bladder. (Tr. 4119, 4260,
4307, 4324) Employee testimony reveals that steam and hot water were frequently released
during a bladder change which caused severe burns. (Tr. 4101-03, 4011-12, 4222, 4278, 4312)

With regard to the PCI rings, employees were exposed to serious injury such as broken or
crushed fingers and hands when they place their fingers in the path of the rings during the ring
change. (Tr. 4017) Employee testimony reveals that in the past the PCI unit has unexpectedly
energized during a tool change. Some movements were unexplained while other movements
were accidental. (Tr. 4247-48) On one occasion, an employee completed a ring change and
attempted to line up rings when the rings snapped shut and crushed his thumb. (Tr. 4018)

The evidence does not support a finding that utilization of a tagout system in this case
coupled with alternative safety measures provided full employee protection as required by
section (c)(2)(ii) of the standard. Dayton Tire failed to rebut the conclusion that the safety rope,
safety bars and the emergency stop button at the front of the press do not provide effective
means of protection against unexpected energization and the hazards associated therewith. The
facts support a finding that these safety measures are not alternative means of protection. During
a mold change, the employee must stand on the tophats and is positioned between the curing
press and the safety bar. If the press is accidentally energized at that time, the employee is
exposed to being struck without warning by the tire loaders before he can push the safety bar.
(Tr. 4007; Exh. C-2F1)

Respondent has asserted the affirmative defense of infeasibility and argues that it did not
violate the standard because it is infeasible to lockout the curing press during a mold/bladder
change. In Secretary of Labor v. Seibel Modern Manufacturing & Welding Corp. , 15 OSHC
1218, 1991 OSHD 29,442 (1991), the Commission held that the employer must meet the
standard of proof regarding both elements of the defense, i.e., the infeasibility of the abatement
measure required by the cited standard and the infeasibility of any alternative measure.

Id. at
1228. See also Westvaco supra at 1380 (quoting Mosser Construction Co., 15 BNA OSHC
1408, 1416, 1992 CCH OSHD ¶29,546, p. 39,907). Respondent states that a mold/bladder
change using lockout measures takes 6.5 hours to complete. (Tr. 6113) Respondent argues that
this unreasonably interferes with the work activities since it normally takes 1.5 hours to complete
a mold/bladder change and therefore, it is infeasible to comply with LOTO. Although a
mold/bladder change may take 6.5 hours to complete, Respondent cannot argue that this is
unreasonable in light of the fact that employees are exposed to serious bodily injury or death
during a mold/bladder change in absence of LOTO procedures. It is clear that Respondent is not
arguing technological infeasibility since the mold and PCI ring change may be achieved while
the machine is locked out. See Ace Sheeting and Repair Co. v. OSHRC , 555 F.2d 439 (5th Cir.
1977); General Electric Co. v. OSHRC , 540 F.2d 67 (2nd Cir. 1977); Castle and Cooke Foods ,
692 F.2d 641 (9th Cir. 1982). Respondent is apparently arguing that increasing the time to
complete the work from 1.5 hours to 6.5 hours constitutes economic infeasibility. However,
there is no evidence in the record that instituting LOTO procedures for the curing press will
threaten Respondent’s long term profitability and competitiveness. RMI Co. v. Secretary of
Labor , 594 F.2d 566 (6th Cir. 1979). The fact that compliance with the standard may
inconvenience Respondent is no defense. U.S. Steel Corp. v. OSHRC , 1976-1977 CCH OSHD
¶20,865 (3rd Cir. 1976); Sheet Metal Specialty Co. , 1974-75 CCH OSHD ¶19,546 (Rev. Com.
1975). Further, Respondent has failed to establish that alternative measures are infeasible as
required by the second part of the infeasibility defense. Although Respondent presented
evidence that blocking is not feasible (Tr. 5877-84), there is no evidence that it looked at other
alternatives or that it attempted to develop other alternative measures. Therefore, Respondent
has not met its burden of proof regarding both elements of the infeasibility defense.

Based on the record, the Respondent has failed to institute the lockout procedures
required by the standard during the mold and PCI ring change when employees were exposed to
the unexpected movement of the top half of the press, the tire loaders and the PCI rings. The
evidence supports the conclusion that employees were exposed to serious injury or death from
the curing press and the PCI unit, and the employer knew or, with the exercise of reasonable
diligence, could have known of the violation. For the foregoing reasons, it is concluded that the
Secretary has sustained his burden of proof and the violation as to the curing press and the PCI
unit is affirmed.

As previously discussed, a willful violation is defined as “intentional disregard” or “plain
indifference” toward the standard. See Willful Analysis Section supra pg. 22. On February 12,
1993, Dayton Tire’s Des Moines, Iowa plant was issued a citation for failure to implement
LOTO procedures which included the curing press. The facts support a finding that the
Respondent had a heighten awareness that mold/bladder changers were exposed to hazardous
energy. However, the Respondent was indifferent towards the standard and did not take any
measures to protect their employees from unexpected energization of the curing press.
Therefore, the violation as found above constitutes a willful violation within the meaning of the
Act.

Item 3(b) Doper Machine

Background

During the period of inspection, Respondent’s plant contained seven radial dopers
(“doper machines”). Each doper machine operates substantially in the same manner; however,
the layout of Nos. 1, 2, 3, 5, and 7, as depicted in Exh. C-146, is the mirror image of the layout
of Nos. 4 and 6. Respondent reversed the layout of two doper machines to efficiently use the
space available in the plant. (Tr. 3704, 3711-12) The doper machine applies lubricant to the
interior of the green tire and paints the exterior to facilitate the curing process. Specifically,
“blem” paint is sprayed on the sidewalls, tread wash is applied to the treads, and dope is sprayed
on the interior of the tire. (Tr. 3704-05)

The doper machine is 25 feet long and 20 feet wide. (Tr. 3713) It consists of a U-shaped
conveyor system, load table, clamp arms, a cabinet which contains the dope gun, blem spray
nozzle (also referred to as the paint gun) and tread wash applicator, exit conveyor and
accumulator conveyor. Green tires are transported on beehive racks from the tire room to the
doper machine. During normal operations, the operator stands at the end of the conveyor belt
and loads the tires onto the conveyor which moves the tires to the load table. The clamp arm
picks each tire from the load table and rotate as the tire is transported into the cabinet where
blem, tread wash and dope are applied. After this process is completed, the clamp arm traverses
out of the cabinet, releases the tire onto the exit conveyor and cycles back to the load table to
pick up another tire. From the exit conveyor, the treated tire travels to the accumulator conveyor
where the operator stacks it on a beehive rack. (Tr. 3704-05, 3713-14)

The doper machine is energized by electric and pneumatic energy. (Tr. 3753-54; Ct.
Exh.4-Radial Doper 14) Pneumatic energy powers the traverse on which the clamp arm travels
to the dope gun, the blem spray gun and the tread wash roller. (Tr. 3754) The dope gun moves
up and down inside the cabinet to spray dope on the interior of tire. The tread wash roller flips
onto the tire. (Tr. 3745)

There are five control panels on the doper machine. Control panel 1 is located near the
beginning of the conveyor system where the tires are loaded onto the machine and contains a
manual button and an emergency stop button. Control panel 2 is a cabinet that holds the
computer system for the doper and is located in the U-shaped area of the conveyor system.
Control panel 3 is located on the front of the load table and contains an emergency stop button,
an automatic start button, a manual stop button, a button to jog the conveyors, a button to run the
traverse in and out of the cabinet and one to move the dope gun up and down. Control panel 4 is
located at the upper left hand corner of the paint cabinet and has a number of switches to move
and test the dope and spray guns. Finally, control panel 5 is located on the right hand corner of
the end of accumulator conveyor. From this location, a doper attendant can turn the tread wash
and the paint gun on and off, switch the machine into manual and move the paint gun up and
down. (Exh. C-146; Tr. 3706-10, 3722-23, 3756-57)

In addition to the emergency stop buttons located on the control panels, the doper
machine is also equipped with safety ropes, safety switches and photo eyes. Safety switches are
located on both ends of the U-shaped conveyor and the upper right hand corner of the cabinet.
Safety ropes are also strung from above the cabinet across to the right hand corner of the load
table. Additional safety ropes starting from the exit conveyor are strung on both sides of the
accumulator conveyor and on both sides of the U-shaped conveyor. (Exh. C-146) Photo eyes
are located on both sides of the load table interior to start and stop the conveyor so that only one
tire at a time moves onto the load table. (Tr. 3786-89)

The violations alleged by the Secretary with respect to the doper machine relate to
cleaning the paint cabinet and its component parts. Respondent has no written procedures which
employees are required to follow when cleaning the clamp arm, spray gun, dope gun and the
paint cabinet floor. Employees were not trained at the “authorized level” and are not required to
utilize lockout procedures when engaged in these activities. (Ct. Exh. 4-Radial Doper 15; Tr.
3722-23) In order to clean the various pieces of equipment in the cabinet, the doper attendant
places the machine in manual from either control panel 1 or 3. (Tr. 3754) The doper machine is
not deenergized either pneumatically or electronically. The clamp arm is manually jogged into
the cabinet and cleaned in the open position. The doper attendant is positioned in front of the
cabinet to clean the equipment. Some doper attendants use a long handle wire brush
approximately 10 to 12 inches long to remove the blem and dope build up on the clamp arm
while others use their hands, a scraper and paper towels. (Tr. 3743) With regard to cleaning the
cabinet floor, the attendants use either a 3-4 foot long scrapper or a short scrapper which requires
the employee to lean into the cabinet. To clean the spray nozzle, the doper attendant removes
the nozzle collar and using a wire brush, knife and/or paper towels, removes the blem and dope
buildup before reinstalling it. (Ct. Exh. 4-Radial Doper 13) It is necessary for the employee to
lean into the cabinet to clean the clamp arm, the spray nozzle, dope gun and the cabinet floor.
(Tr. 3746-53)

The doper attendant is required to load green tires onto the machine, unload the treated
tires, monitor the machine and clean various pieces of equipment inside the cabinet.
Specifically, the doper attendant is required to clean the clamp arm and the paint guns
approximately every two hours. The clamp arm takes about five minutes to clean. The dope gun
and the cabinet floor are usually cleaned at the end of the shift. (Tr. 3748-50; Ct. Exh. 4-Radial
Doper 10) The Secretary asserts that employees removing build up on the clamp arm are
exposed to the hazard of unexpected movement of the clamp arm which could result in
lacerations or broken bones of the hand or arm. Further, the Secretary contends that unexpected
energization of the clamp arm during the spray nozzle cleaning could break or bruise an
employee’s hand. The Secretary also alleges that employees are exposed to unexpected
movement of the clamp arm when cleaning the cabinet floor which could result in serious injury.
Finally, the Secretary argues that employees are exposed to the hazard of unexpected movement
of the clamp arm and the dope gun when cleaning the tip of dope gun.

Discussion

Respondent argues that cleaning the clamp arm, the spray nozzles, the dope gun and the
cabinet floor does not constitute service and maintenance as defined by the standard but rather
fall within the exception of minor servicing, see footnote 5 supra, on the ground that cleaning
the clamp arm and the dope gun constitutes minor servicing and maintenance because these
activities are performed at routine intervals and are integral to the function of the doper machine.
Moreover, Dayton Tire argues that alternative safety measures to LOTO procedures such as
safety ropes, safety switches and emergency stop buttons provide effective means of protection.

The LOTO standard covers service and maintenance in which unexpected energization of
equipment could cause injury to employees. See footnote 4 supra . Removing the buildup of
blem, tread wash and dope from the clamp arm, dope gun, spray nozzle and the cabinet floor fall
within the definition of service and maintenance which includes cleaning of machines where
employees are exposed to unexpected energization. See footnote 7 supra . Although Dayton
Tire argues that these activities are minor, they do not fall within the minor servicing exception
standard because the doper machine is not engaged in production during these servicing
activities. Moreover, safety ropes, switches and emergency buttons do not provide effective
means of protection. First, doper attendants cleaning the clamp arm, dope gun, spray nozzle and
the cabinet floor cannot simply reach up and pull the safety rope or the safety switch. The ability
to reach the safety ropes also depends on type of the tool used for cleaning. Although an
employee is able to keep his body outside the cabinet and away from the zone of danger by using
a long handle scraper or brush, an employee using a short handle scraper or brush would have
insufficient time to step back from the cabinet and pull the safety rope. There are no emergency
stop buttons on control panel 4, the control panel on the lefthand side of the cabinet opening.
(Tr. 3774-77; Exh. C-146)

The Secretary has established that the doper machine unexpectedly energized during
service and maintenance activities. See General Motors Corp. supra at 1219. The evidence
supports the finding that doper attendants were exposed to the hazard of being struck by moving
clamp arms when cleaning the clamp arm, spray nozzle, dope gun and the cabinet floor. During
the clamp arm cleaning process, an employee’s body would come within a couple of inches of
the clamp arm. (Ct. Exh. 4-Radial Doper 12) Further, employees were exposed to the hazard of
being hit on the head, shoulders or hands during a dope gun cleaning by rotating clamp arms.
Employee testimony reveals that the clamp arms have moved unexpectedly due to a leak in the
air cylinder in the traverse or as a result of other employees accidentally jogging the clamp arms.
(Tr. 3768, 3876-79, 3891) Employees are also exposed to the unexpected rotation of the clamp
arm because another employee could unexpectedly switch the doper machine into automatic
during the cleaning process (Tr. 5259). In one instance, a leak in the traverse air cylinder caused
the clamp arm to jog in towards the cabinet approximately 6 inches. (Tr. 3892) The clamp arm
can fully traverse into the cabinet depending on the amount of pneumatic energy in the air
cylinder. According to testimony, an employee accidentally jogged the clamp arm in and out of
the cabinet while another employee was cleaning the equipment in the cabinet. (Tr. 3876-79)

Respondent acknowledges that employees were not required to lockout the doper
machine when cleaning the clamp arm, dope gun, spray nozzle and the cabinet floor. The
evidence establishes, however, that employees were exposed to serious physical harm in the
event of unexpected energization while engaged in these activities. Moreover, as previously
stated, the activities do not fall within the “minor maintenance” exception to the standard. For
these reasons, the citation is affirmed.

Although a violation exists as to the doper machine, the Secretary has failed to prove that
it is a willful violation. As discussed above, a willful violation is defined as “intentional
disregard” or “plain indifference” toward the standard. The Respondent has made a good faith
effort to comply with the LOTO standard by hiring Ogden Allied to perform all service and
maintenance activities on all the machines and training their employees at the affected level. See
Willful Analysis Section supra pgs. 23-27. Moreover, the facts support a finding that Dayton
Tire did not have a heighten awareness that it was violating the standard as to the doper machine
since the doper was not cited in the Des Moines, Iowa plant. Supra pg. 25-26. See also footnote
12 supra .

The evidence does support the conclusion, however, that failure to implement LOTO
procedures could cause serious physical harm such as severe lacerations of the hands and arms
or impact to the head and shoulder in the event of unexpected energization. Therefore, the
violation as found above constitutes a serious violation within the meaning of the Act.
Moreover, this item was tried as a serious violation by the implied consent of the parties. Dye
Construction Co. , 6 BNA OSHC 1685 (1985). Accordingly, the citation and complaint are
amended pursuant to Rule 15(b) of the Federal Rules of Civil Procedure to reflect a serious
violation of the cited standard.

Item 4 Tread Tuber and Dayton Loader

Item 4 of the Citation reads as follows:

29 C.F.R. § 1910.147(c)(4)(i): Procedures were not developed,
documented and utilized for the control of potentially hazardous energy when
employees were engaged in activities covered by this section: At the plant[,] a
documented procedure to control potential hazardous energy for each type of
machine was not being used by employees unjamming mills and extruders.

This alleged violation relates to the activities of employees engaged in unjamming mills
and extruders of the tread tubers. The citation was amended to include the Dayton Loader. The
tread tubers and the Dayton Loader make up the Tubing Department where white sidewall, black
sidewall and treads are produced. During the period of inspection, Respondent’s plant contained
four tread tubers which are essentially the same. The tread tuber is a large machine consisting of
mills, extruders, conveyors and a mechanical knife. Tubers Nos. 1, 2, and 3 have four mills and
extruders. However, No. .5 has two extruders and a conveyor system. (Tr. 2294-97) Each mill
consists of two stainless steel rotating drums which are also known as mill rolls. A drive is
located between each

mill. (Tr. 2342; Exh. C-135)

Background The Dayton Loader transports rubber stock from the Banbury Department and feeds it
into the tread tubers. A take away conveyor transfers the rubber from the Dayton Loader into the
mills. The mills breakdown (heat) the rubber stock on two counter-rotating stainless steel drums
approximately eight feet long and two and a half feet diameter. The rubber is transferred onto a
feed conveyor which brings it to the knife area where it is cut into different size strips. The
strips of rubber are then fed into an extruder which contains an eight to ten-inch auger or worm
screw that spins the rubber and pushes it out onto the conveyor that leads to the calender. The
calendar applies veneer to the treads and the white sidewalls. A “cushion” is also applied to the
white sidewalls. After this process is completed, the white sidewalls and the treads go through
the marker wheels where labels are put on the treads. The rubber moves onto an elevated
cooling conveyor where it is sprayed with water. The cooled rubber descends by conveyor to the
skiver knife which cuts the rubber into appropriate lengths. Cement is applied to the treads and
“booked” (stacked) into trays. The sidewalls are also wound up on spools. (Tr. 2295-2326; C-135)

A group of 4-5 employees consisting of mill operators, BEI attendants and mill
attendants operate a tuber. The tuber employees work in a protective hearing area and
communicate via intercom. (Tr. 2355) Mill attendants supply blackwall, veneer and cushion for
the extruder and the main sidewall extruder and monitor the tuber for malfunctions. Mill
operators, BEI attendants and mill attendants clear rubber jams on the mills, extruders, Dayton
Loader and conveyors (feed and take away).

Various parts of the tuber are energized.

The mill rolls rotate counterclockwise. The
auger spins at approximately at 60-70 rpms. (Tr. 2394) Pinch points are located between the
Dayton Loader conveyor and the roller. There are also pinch points between the feed conveyor
and the take away conveyor and rollers. (Tr. 2353-71, 2383-85, 2391-97) Safety ropes, stop
buttons and belly bars (safety bars) are located at various points on the tuber. Belly bars
surround the mill rolls and will stop the mill rolls when actuated. Each belly bar has a single
reset button on the side of the mill. Safety ropes are strung over the mills, extruders, Dayton
Loader and the conveyors. There are thirteen stop buttons and thirteen start buttons on the tuber.
They are located at the end of each mill, on each drive, on the Dayton Loader, on the feed
conveyor and the extruder. The control box for the take away conveyor is located on the right
side of the mill. The control box for the Dayton Loader is located on the left side of the mill.
The reset box for the belly bar is located under the Dayton Loader control box. ( Tr.2351-52;
2419-66; Exhs. 2B1, C-135)

Rubber jam ups occur at various points of the tuber and the Dayton Loader. Depending
on the severity of the jams, it may take up to two hours to unjam the tuber. Rubber is often
jammed on the first roll leading to the Dayton Loader and at the roll where it is dropped into the
mills stalling the loader or causing the motor to overload. Jams on the Dayton Loader occur a
couple of times a week. To unjam the loader, the mill attendant hits the stop button and cuts the
rubber out with a knife as the mill operator runs the belt backwards. Mill attendants also stand
on top of the mill roll to unjam the Dayton Loader. In order to stop the mill roll, the belly bar is
actuated. Mill attendants use their left hand to pull the conveyor belt down as they cut with their
right hand. After the loader is unjammed, the belly bar is pulled back into place, the safety is
reset and the tuber is activated. (Tr. 2348-72) The Secretary asserts that mill attendants are
exposed to the hazard of unexpected energization when unjamming the Dayton Loader which
could result in crushing injuries to the hand.

Rubber also adheres to the serrated roller and jams the mill rolls. To unjam the mill rolls,
a mill attendant cuts across one of the serrations of the mill roll. Next, the mill attendants
partially peel off the sheet of rubber roll by hand. The mill operator jogs the mill roll on one side
of the mill as two mill attendants knock the rubber off with flat metal tip poles on the other side
of the mill. The mill attendants hit the belly bar as the mill operator jogs the mill roll to prevent
it from over rotating. (Tr. 2373-76) Some mill attendants roll the rubber by hand. (Tr. 2423-27)
The Secretary asserts that if the mill roll unexpectedly energized while employees’ hands were
on the roll, they would sustain burns or crushing injuries.

Finally, rubber jams occur in the extruder hopper. Rubber tends to stick to the auger
which is located inside the hopper. Mill attendants either physically pull the rubber out of the
augers while it is still operating or turn the machine off and use a pry bar. To pull the rubber out,
the mill attendant reaches into the hopper and down to the auger. One employee testified that his
hands were approximately 3 inches away from the moving auger when removing the rubber. If
the rubber was severed, the mill attendants would hit the stop button and use a pry bar to remove
the rubber. Once the rubber is cleared out, the auger is activated by hitting the start button. (Tr.
2394-97, 2500-01) The Secretary asserts that employees are exposed to the hazard of being
pulled into the auger or having their arm amputated by the auger while it is operating or
unexpectedly energized during the unjamming process.

Respondent has no written procedures which employees are required to follow during the
unjamming process on the Dayton Loader, mills and extruders. Respondent’s safe operating
procedures for the Tubing Department during the period of inspection did not specify which
tools to use in unjamming. Employees are trained by fellow employees in the Tubing
Department when assigned to that department and are not required to utilize LOTO procedures
when unjamming rubber. (Tr. 2377, 2384, 2391-92, 2397, 2486, 2502-03)

Discussion

Respondent disputes the applicability of the standard to the cited job tasks. It contends
that unjamming activities on Dayton Loader and the tuber are not service and maintenance
activities as defined by the standard. Assuming that the standard is applicable, Respondent
argues that these cited job tasks fall within the minor servicing exception which is defined as
unjamming activities that are minor, routine, repetitive and integral to the production process.
See footnote 5 supra . Respondent argues that minor unjamming activities are performed by the
employees, whereas, major unjamming activities are performed by Ogden Allied, the service and
maintenance contractor.

The LOTO standard covers service and maintenance in which unexpected energization of
equipment could cause injury to employees. See footnote 4 supra . The Secretary has
established that the standard applies to the unjamming activities on the tuber and the Dayton
Loader. Unjamming and removing rubber from the mills, the extruders and the Dayton Loader
clearly falls within the definition of service and maintenance which covers unjamming of
machines or equipment where employees are exposed to unexpected energization. See footnote
7 supra . Although Dayton Tire argues that these activities are minor, they do not fall within the
minor servicing exception standard because the tuber is not engaged in production during the
removal of the rubber jam ups. (Tr. 2487-90)

The evidence supports the finding that mill operators, mill attendants and BEI attendants
were exposed to the hazard of being pulled into the mills and extruders, or sustaining crushing
injuries from pinch points. Specifically, during the unjamming of the Dayton Loader,
employees’ hands were inches away from the moving parts of the machine. If the Dayton
Loader accidentally started up during the unjamming, an employee’s right hand could be caught
between the rolls resulting in a broken hand. In the event that the Dayton Loader unexpectedly
started in reverse, the employee’s left hand would be caught and sustain possible crushing
injuries to the fingers or a broken wrist. (Tr. 2371) Further, employees were exposed to the
unexpected start up of the mill roll while standing on it to unjam the Dayton Loader. Employee
testimony established that in the event that the mill unexpectedly started, the employee could be
pulled into and crushed between the mill rolls. (Tr. 2372) Finally, employees were exposed to
the auger’s point of operation which could result in crushing injuries or amputation of the hand.
Specifically, employees were exposed to the spinning auger as they pull the rubber from the
extruder hopper. One employee testified that on one occasion his hands were approximately 3
inches from the moving auger as he attempted to remove the jammed rubber and his glove was
pulled into the auger. Fortunately, his hands were not pulled into the auger and he was able to
pull the safety rope to stop the machine. (Tr. 2507)

Testimony revealed that employees were exposed to unexpected energization of the
mills, extruders and the Dayton Loader because another employee could accidentally or
unexpectedly hit a start button during the unjamming process. (Tr. 2482-84, 5259) Given the
size of tuber and the number of employees (4 or 5) operating it, there is risk that one of the
employees could inadvertently activate the machine while another is in the zone of danger. The
Dayton Loader, the mills and extruders move instantaneously upon being energized leaving the
employees little or no time to leave the zone of danger or to remove their hands from the points
of operation. The evidence supports the conclusion that employees were exposed to serious
injury or death during these unjamming activities and the employer knew or with the exercise of
reasonable diligence could have known of the violation. For the foregoing reasons, the
Complainant has met his burden of proof and the violation as to the aforesaid Tread Tuber and
Dayton Loader is affirmed.

The Secretary alleges that this violation is “willful” within the meaning of the Act. As
discussed above, a willful violation is defined as “intentional disregard” or “plain indifference”
towards the standard. With regard to the Tread Tuber and the Dayton Loader, the facts support a
finding that Dayton Tire did not have a heighten awareness that it was violating the standard for
the reasons stated supra at pg. 25-26 and footnote 12 supra . Moreover, Respondent was not
placed on noticed of this violation by the “Des Moines” citation. A serious violation, however,
exists if there is a substantial probability that death or serious physical harm could result from a
condition which exists unless the employer did not, and could not with the exercise of reasonable
diligence, know of the presence of the violation. 29 CFR § 666(k) supra . The Secretary does
not have to prove that there is a substantial probability that an accident will occur, but rather that
death or serious physical harm could occur. See East Texas Motor Freight, Inc. supra ;
Bethlehem Steel Corp. supra . The evidence supports the conclusion that failure to implement
LOTO procedures when unjamming the tuber and the Dayton Loader could cause serious
physical injuries such as broken bones, amputation or being pulled into the equipment resulting
in death. Moreover, for the reasons stated supra pg. 41, this item was tried as an alleged serious
violation by the implied consent of the parties. See Dye Construction Co. , 6 BNA OSHC 1685
(1985). This item is amended pursuant to Rule 15(b) of the Federal Rules of Civil Procedure to
reflect a serious violation of the standard cited. The citation as amended is affirmed.

Item 5 Banbury

Item 5 of Citation I reads as follows:

29 C.F.R. § 1910.147(c)(4)(i): Procedures were not developed,
documented and utilized for the control of potentially hazardous energy when
employees were engaged in activities covered by this section: At the plant[,] a
documented procedure to control potential hazardous energy for each type of
machine was not being used by employees unjamming mixers and feed belts.

This alleged violation relates to the activities of employees engaged in the operation of
the first and second floor Banbury. During the period of inspection, Respondent’s Oklahoma
plant contained three banburys known as 271, 272 and 273. The banburys are basically the
same. (Tr. 1921, 1943-44) The Banbury Department mixes pigments and raw rubber together to
produce slabs of rubber to be processed into treads and sidewalls in the Tubing Department.
(Tr.5669-70)

Background

Banbury is electrically, hydraulically, and pneumatically energized. (Tr.1982) It
occupies three floors and consists of the following equipment. On the third floor, pigment is
measured and weighed and sent down a chute to the second floor mixer. Pigment bins are either
automatic or manual. Dayton Loaders, weight and charge conveyor belts and mixers are located
on the second floor. Skids of re-mill (previously mixed) rubber are fed through the Dayton
Loader which consist of a series of conveyors and a knife. Rubber is then transferred onto the
weigh conveyor belt and is cut by the Dayton Loader knife once it reaches the pre-programed
weight. The charge conveyor belt takes the cut re-mill rubber to the mixer. If master batch
rubber is being used then seventy to ninety pound bags of raw rubber are loaded directly onto the
weigh belt bypassing the Dayton Loader. From the mixer, the rubber drops down a chute to the
first floor auger. In addition to the auger, the roller die, slitter knife, soap tank and festoons are
located on the first floor banbury. Rams push the rubber through the auger screw to the roller
die which is made up of two mill rolls about 5-6 feet long and 3-5 feet in diameter which flatten
out the rubber. The roller dies can be hydraulically raised and lowered. (Tr. 2230; Exh. C-153)
The auger and roller die are located in a pit. The roller die take away conveyor belt takes the
rubber to the slitter knife, where it cuts the rubber into slabs. The slabs of rubber are sent
through a soap tank and then travel on the chain conveyor belt to two sets of festoons where it is
draped between bars and dried by cooling fans. A festoon is made up of a series of bars six
inches apart and configured in an oval. (Tr.1925-29, 1964-70, 2033, 2118, 2131, 2186-93; Exh.
C-133)

The actual number of employees overseeing the banbury operations is not clear from the
record. On the third floor, compounders measure and weigh the pigments and monitor the
manual pigment bins. Belt loaders and lead belt loaders monitor the speed of the belts and the
mixer on the second floor. Depending on the type of rubber used, they either feed re-mill rubber
through the Dayton Loader or directly load bags of raw rubber onto the weight belt for master
batch rubber. (Tr.1972) Transfer mixer attendants (T-mixers) monitor the operations on first
floor banbury. They control the speed of the auger, roller die, and the conveyors as it takes the
rubber slabs through the slitter knife, soap tank and the festoons to ensure that production runs
smoothly. Belt loaders are required to remove jams on the second floor and T-mixers are
required to clear jams on the first floor banbury. Belt loaders and wigwags assist T-mixers with
severe jams on the first floor. (Tr.1923, 2033, 2188, 2113-20) For the purposes of this
discussion, there are at least three employees that monitor the first and second floor banbury: the
lead belt loader, belt loader and T-mixer.

The Dayton Loader control panel is located on the side of the loader and contains nine
buttons which include the power button, start button and other controls. (Tr.2088, 2109; Exhs.
2A2, C-127, C-163) The T-mixer control panel located at the end of the roller die controls the
speed of the rams, auger, roller die take away belt, chain belt, stitcher wheel (which secures the
rubber on the festoon bars) and coolant fans. The T-mixer can stop the entire production process
on the first and second floor banbury by engaging the on/off switch on the control panel.
However, activating the stop button on the control panel does not shut down the Dayton Loader
on the second floor. Another control panel for first floor operations is located near the festoon
area.

(Tr.2119-21, 2144-46, 2178; Exh. C-133)

Banbury operations on the first and second floors are either enclosed, guarded or
equipped with safety ropes. The Dayton Loader knife is in the loader and is surrounded by a
guard. Operations from the second floor mixer to the first floor roller die are enclosed except for
the area where the rubber comes out between the rolls. Safety ropes are strung around the
Dayton Loader, mixer, weigh belt and charge belt on the second floor. The skid shifter which
feeds rubber into the rear of the Dayton Loader is also surrounded by safety ropes. A mesh wire
area holds the empty skids. (Exh. 2A7) On the first floor, safety ropes run from the roller die
along the conveyor system to the festoon area. Pinch points are located between the rolls of the
roller die, the soap tank and chain belt, the chain belt and the festoons. There are no guards
around the roller die or the festoons. (Tr.1964, 2134, 2209-18, 2258-80; Exh. C-133)

During the banbury production process, rubber accumulates or jams up at the Dayton
Loader, roller die, slitter knife, soap tank and festoons. On the first floor, rubber jams occur at
the rear of the Dayton Loader where slabs of rubber are fed in and at the top of the loader where
the rolls are located near the knife area. To unjam the rear of the Dayton Loader, the belt loader,
with the assistance of the lead belt loader, pulls the safety rope and uses a mill knife to cut the
rubber across the length of the rolls. (Tr.1976-80) The Secretary asserts that employees are
exposed to the nip point between the conveyor and rollers which could result in injuries ranging
from crushing or degloving (skin removal) to amputation of the hand if the Dayton Loader
unexpectedly energized when unjamming the back of the loader.

In order to remove a rubber jam at the top of the loader, the belt loader pulls the safety,
hits the emergency stop button, climbs onto a bale cutter (“S” marked on Exh. 2A6) and stands
on top of the Dayton Loader (“T” marked on Exh. 2A6) to cut the rubber from the rolls of the
loader. The bale cutter is a bench on wheels that cuts rubber. The belt loader uses a mill knife
and a hay hook to remove the jam. There is no guard or obstruction where the conveyor drops
the rubber down to the knife in the Dayton Loader. The belt loader’s hands are approximately a
foot from the knife. Depending on the severity of the jam, the belt loader will climb up and
down the Dayton Loader a number of times to pull the rubber out and to jog the belt in reverse
until the jam is cleared. Each time the belt loader climbs up or down, he has to reactivate or
deactivate the loader. (Tr.1974-2009; Exhs. 2A2-2A6) The Secretary asserts that employees are
exposed to the unexpected energization of the Dayton Loader when unjamming the top of the
loader which could result in broken bones or a concussion from falling off the side of the loader.
The Secretary also asserts that employees could be pulled into the Dayton Loader knife area and
suffer amputation.

Rubber accumulates at the roller die which is located in a pit on the first floor
approximately 40-50 feet from the T-mixer control panel. Rubber backs up into the roller die
because the roller die take away conveyor hesitates, causing the rubber to pile up. To unjam the
roller die, the T-mixer turns the power off at the T-mixer control panel and pulls the safety rope.
The T-mixer stands next to the roller die take away conveyor in the pit and reaches across the
belt to unjam the rubber. The belt loader cuts and pulls the rubber from the rolls using a mill
knife and hay hook. If the jam is severe then the T-mixer climbs onto the conveyor belt to
remove the rubber from the rolls. Occasionally, the T-mixer or the belt loader raises the rolls up
to pull the rubber out from underneath. (Tr.2033-40, 2081-82, 2141-47) The Secretary contends
that employees are exposed to the pinch points of the rolls and could sustain injuries such as
degloving, crushing or amputation.

Rubber jams occur under the slitter knife because the roller die is ragged or cold. In
order to unjam the slitter knife, the T-mixer turns the power off and hits the stop button at the
control panel. The T-mixer pulls the safety rope and removes the rubber with a mill knife or hay
hook. For a severe jam, the T-mixer climbs onto the conveyor belt and lifts the knife to clear the
jam. The T-mixer’s hands are inches from the knife and sometimes touches it when unjamming
the rubber. (Tr.2046-48, 2153-55) The Secretary asserts that employees are exposed to the
unexpected energization of the slitter knife which could result in crushed or amputated fingers.

Rubber sticks and builds up underneath the belts between the soap tank and the chain belt
resulting in a jam. In order to unjam the point where the soap tank belt transfers to the chain
belt, the T-mixer turns the power off and hits the stop button on the control panel. He engages
the safety rope and removes the rubber from the side of the conveyor. If the jam is severe, the T-mixer climbs onto the chain belt which is approximately three feet above the ground to remove
the rubber between the two conveyor belts. (Tr. 2041, 2155-58) The Secretary alleges that the
employee could be caught between the pinch points of the belts and the rollers and sustain
crushing injuries or broken bones if the conveyors unexpectedly energized.

Finally, rubber jams occur at the end of chain belt at the festoon drop off area. The chain
conveyor belt drops half of the rubber slabs over the first set of festoon bars and transfers the
other half to the second set of festoon bars. Rubber from the chain belt occasionally hits the top
of the first set of festoons and wraps around the chain belt. In order to remove the jam, the T-mixer pulls the safety rope and climbs onto the catwalk to cut the rubber out from in between the
belts. If the T-mixer cannot reach the rubber from the catwalk, he climbs onto the conveyor belt
to straighten out the slabs so that they drape between the festoon bars. (Tr.2042, 2048-50, 2159-62) The Secretary asserts that employees are exposed to the hazard of unexpected energization
of the festoons which could result in crushing injuries from the stitcher wheel.

Respondent has no written procedures which employees are required to follow to unjam
the various parts of the banbury. Banbury employees are not trained at the authorized level or
required to lockout the equipment when clearing a jam. Belt loaders and T-mixers are trained to
operate and unjam the banbury by fellow employees when they first start. (Tr.1981, 2050,
2276)

Discussion

The Respondent disputes the applicability of the standard to the unjamming activities on
the banbury. Dayton Tire argues that unjamming the Dayton Loader, the roller die, slitter knife,
the area between the soap tank and the chain belt, and the festoons are not service and
maintenance activities as defined by the standard. See footnote 7 supra . Even if the LOTO
standard is applicable, Respondent argues that these unjamming activities occur only during
normal production operation and thus, fall within the minor servicing exception which is defined
as unjamming activities that are minor, routine, repetitive and integral to the production process
so long as alternative safety provide effective protection. See footnote 5 supra . Finally, Dayton
Tire states that Ogden Allied services severe jams that halt production on the banbury.

The Secretary has established that the LOTO standard applies to the unjamming activities
on the first and second floors of the banbury. See footnote 4 supra. Unjamming and removing
rubber from the Dayton Loader, roller die, slitter knife, between the soap tank and chain belt,
and the festoons constitute service and maintenance. See footnote 7 supra . Although Dayton
Tire argues that these activities are minor, they do not fall within the minor servicing exception
standard because the banbury is not engaged in production during the unjamming process.
Safety ropes and emergency buttons are not alternative means of protection to LOTO. Safety
ropes and emergency buttons can malfunction or be reset and will not prevent someone from
unexpectedly starting up the banbury. The record shows that safety ropes have failed to
deactivate the machine when pulled on the first and second floor banbury. (Tr.2198-2202, 2227,
2240-41)

The evidence supports the finding that banbury employees were exposed to the hazards
of unexpected energization of the Dayton Loader, roller die, the area between the soap tank and
chain belt, and the festoons in the banbury when unjamming rubber. The record shows that
employees unjamming the Dayton Loader could sustain crushing injuries from the pinch points
between the rolls and conveyor. Specifically, during the unjamming of the Dayton Loader,
employees’ hands were inches away from the moving parts of the machine. If the Dayton
Loader accidentally started up during the unjamming, the employee’s right hand would be
caught around the roll which could result in a broken hand. If the Dayton Loader accidentally
started in reverse, the employee’s left hand would get caught and the employee would sustain
crushing injuries to the fingers or a broken wrist. (Tr. 2371) With respect to unjamming the top
of the loader, employees’ hands could be caught between pinch points or under the knife and
sustain serious injury. Further, employees could fall of the Dayton Loader if it unexpectedly
energized when unjamming and sustain serious physical harm.

In addition, if the roller die unexpectedly started up when employees were unjamming it,
they could be pulled under the unguarded bottom roll and the scraper blades sustaining severe
cuts or crushing injuries to the hand. (Tr. 2167, 2241-43) Employees were exposed to the
hazards of having their hands severely cut or amputated by the slitter knife if it accidentally
descended during the unjamming process. (Tr. 2284) While unjamming the area between the
soap tank and the chain belt, employees were exposed to the pinch point created by the soap tank
belt circling back around the chain belt which could result in a mangle or broken arm.
Employees were also exposed to the pinch point created by the belts in the festoons and could
sustain serious hand injuries. (Tr. 2285)

Although there is no testimony that the Dayton Loader or the slitter knife has
unexpectedly energized during unjamming activities, the record shows that the Dayton Loader
has unexpectedly cycled without explanation. (Tr. 2228) Employee testimony reveal that the
banbury has unexpectedly energized while employees were unjamming the roller die, the area
between the soap tank and chain belt and festoons. With regard to unjamming the roller die,
maintenance has reset the safety and accidentally energized the banbury while a T-mixer was
unjamming the rolls in the pit. An individual at the T-mixer control panel cannot see the T-mixer in the pit. (Tr. 2164-67) In another incident, an individual reset the safety and
accidentally started the banbury while a T-mixer was unjamming the area between the soap tank
and the chain belt. Only the T-mixer’s knees could be seen from the T-mixer control panel since
he was under the exhaust hood trying to unjam the rubber. (Tr. 2170-76) On two occasions, the
banbury unexpectedly energized while employees were unjamming the festoons. In the first
incident, maintenance reset the safety and unexpectedly energized the banbury while the T-mixer
was removing a rubber jam in the festoons. An individual standing at the T-mixer control panel
cannot see the festoons. In the second incident, an employee accidentally started the banbury
when a supervisor was standing on the belt in the festoons. (Tr. 2178-85) Given the fact that the
banbury consist of three floors and at least three employees monitoring the first and second floor
banbury operations, there is risk that someone will inadvertently reset the safeties and activate
the machine while an employee is in the zone of danger. (Tr. 2272-74) The banbury moves upon
being energized leaving the employees little or no time to leave the zone of danger or to remove
their hands from the points of operation.

The facts establish that Dayton Tire failed to implement the required LOTO procedures
during unjamming activities on the first and second floors of banbury 271, 272, and 273.
Employees were exposed to unexpected energization of the banbury while unjamming the
Dayton Loader, roller die, area between the soap tank and chain belt and the festoons on said
machines. For the foregoing reasons, the Complainant has met his burden of proof and the
violation as to the aforesaid banburys is affirmed.

A willful violation is defined as “intentional disregard” or “plain indifference” toward the
standard. See Willful Analysis Section supra pg. 22. The facts support a finding that the
Respondent had a heighten awareness that banbury employees unjamming operations on the first
and second floors were exposed to the hazard of unexpected startups of the machine since
Respondent received notice that the Banbury Department was cited in the Des Moines, Iowa
citation for failure to implement LOTO procedures. Based on the evidence, Respondent did not
take any measures to protect their employees from unexpected energization of the banbury in
light of the Des Moines citation; therefore, the violation as found above constitutes a willful
violation within the meaning of the Act.

Item 6 Module Machine

Item 6 of the Citation reads as follows:

29 CFR 1910.147(c)(4)(i): Procedures were not developed and
utilized for the control of potentially hazardous energy when
employees were engaged in activities covered by this section:

At the plant[,] a documented procedure to control potential
hazardous energy for each type of machine was not being used by
employees installing parts and unjamming module machines.

A module machine is approximately twenty-five yards long, eight feet wide and sixteen
feet high and consists of three sections; a tire uniformity optimizer (TUO), a white side wall
grinder and a side wall painter. There are 21 module machines at the Oklahoma City location.
As implied by its name, the tire uniformity optimizer ensures that each tire passing through the
machine is of the same size; the white side wall grinder removes the black rubber veneer
covering the white side walls of the tire and the painter paints the side walls. The Secretary
alleges that employees operating the module machine are exposed to serious injury or death if
the machine becomes unexpectedly energized while (1) unjamming tires that become jammed at
any point along their passage through the machine, (2) when installing grinding stones, dust
scoops and brake pads in the white side wall grinder and (3) when changing the chuck on the
white side wall grinder.

The record reveals that tires are fed into one end of the machine on a conveyor belt and
enter the TUO. Upon exiting the TUO each tire proceeds by conveyor belt to the white wall
grinder and thence to the painter. The tire is then ejected from the machine via conveyor belt.
Employee testimony established that tires occasionally become “jammed,” that is, the progress
of the tire through the machine operation is impeded because stop pins fail to operate properly or
photo eyes become obstructed. Tires also become jammed in the “chuck” mechanism of the
white side wall grinder, and the TUO (mischucks). Upon the occurrence of a jam, the operator
places the machine in “manual” mode thereby stopping the machine’s movement although the
machine remains energized (electrical, pneumatic and hydraulic). The tire causing the jam is
removed by the operator by hand or with a metal hook and the machine is activated in the
automatic mode thus resuming normal production. The operator’s hands are in close
proximately to moving parts such as the grinding stones and the top and bottom chucks when
unjamming tires in the white side wall grinder and the chucks in the TUO. The employees are
exposed to severe lacerations to the hands and arms while unjamming tires in the TUO and the
white side wall grinder in the event that the machine is unexpectedly turned on. Several
employees testified that they personally experienced “near-misses” when the module machine
was unexpectedly activated by other employees while engaged in unjamming tires. Based upon
the evidence, it is concluded that Respondent’s employees were exposed to serious injury while
engaged in unjamming tires in the TUO and the white side wall grinder and Respondent failed to
institute appropriate LOTO procedures, as alleged, to protect employees from injury in the event
of unexpected energization of the machine. Moreover, the unjamming activities did not occur
during normal production; that is, the machines were placed in the manual mode and were not
engaged in the production process during unjamming. Contrary to Respondent’s assertion, the
employees were not engaged in “minor servicing” activities and, therefore, exempt from the
requirements of the LOTO standard. See footnote 5 supra . The record clearly establishes that
employees were exposed to injury while unjamming tires and that exposure could be eliminated
by instituting lockout procedures.

Employees were also exposed to serious injury while changing the grinding stones, dust
scoops, brake pads and the chucks in the white side wall grinder. The chucks must be changed
whenever a different size tire is processed through the machine. The grinding stones, dust
scoops and brake pads must be replaced when they become worn. Each of these activities
exposes the machine operator to moving parts in the event that the machine is unexpectedly
energized. The grinding stone is a round disk with a sandpaper like edge which rotates at high
speeds to remove the rubber from the white side walls. Over time, the disk wears down and
must be replaced. In order to remove and replace the grinding stone, the operator must place his
or her hands on the stone. Activation of the stone at this point of the removal and replacement
process would result in severe injuries to the operator’s hands. In addition, the operator’s hands
and arms are in close proximately to the grinding stone while changing the brake pads and the
dust scoops. Similarly, the employees are exposed to severe injury to arms and hands in the
event that the grinding stone is activated during the replacement of dust scoops and brake pads.

The chuck in the white side wall grinder consists of two rotating steel cylinders. The
lower chuck which the tire sits upon raises the tire to the top rotating chuck in order for the
grinding stone to perform its rubber removal function. During a chuck change, the operator
places the machine in the manual mode and removes the screws holding the top and bottom
chucks in place. The chucks are than manually removed by the operator. This process requires
the employee to place his or her hands directly on the perimeter of the chucks. In the event that
the machine became energized at this point, the operator would be exposed to the spinning
motion of the chucks as well as the upward motion of the bottom chuck to the top chuck thus
exposing the employee to severe injury to the arms, hands and fingers including amputation.

Several employees testified as to their personal experiences regarding the energization of
the module machine while engaged in changing chucks, grinding stones, dust scoops and brake
pads as well as when unjamming tires. In each instance, the employee was exposed to the
unexpected movement of the machine. (Tr. 276-79, 283, 305-06, 371-75, 440-41, 459-60, 483,
547-48, 557-58, 737-38, 750, 775-84, 854-59, 911-12, 937-38, 990-93, 1013-14, 1122-23, 1483-84, 1524, 1779-80) The record is replete with instances wherein employees were exposed to the
unexpected movement of the machine while engaged in the activities described above.

In response to this evidence, Respondent asserts that the tasks were accomplished during
normal production operations and were minor, routine, repetitive and integral to the production
process. Respondent’s arguments are not persuasive. The massive amount of evidence
presented by the Secretary clearly established that Respondent’s employees were exposed to the
precise hazards that the standard was intended to eliminate. Moreover, the work activities were
accomplished when the machine was not producing anything. Thus, the work activities were not
performed during normal production operations and therefore exempt from the standard as
alleged by the Respondent.

Although this item is alleged to be a “willful” violation, the Secretary has failed to
establish that Respondent intentionally disregarded or was plainly indifferent to the LOTO
standard as it applied to the module machine. Furthermore, Respondent did not have a
“heightened awareness” of its obligations to comply with the LOTO requirements for the module
as a result of the “Des Moines” citation. The facts do support a finding of a serious violation
within the meaning of the Act and, for the reasons stated supra at pg. 41 this item was tried as an
alleged serious violation by the implied consent of the parties. Accordingly, this item is
amended pursuant to Rule 15(b) of the Federal Rules of Civil Procedure to reflect a serious
violation of the cited standard and the citation as amended, is affirmed.

Item 7 Failure To Issue Equipment

Item 7 of the Citation reads as follows:

29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key
blocks, adapter pins, self locking fasteners, or other hardware were
not provided by the employer for isolating, securing, or blocking
of machines or equipment from energy sources:

At the plant[,] the employer did not provide the necessary
protective materials and hardware such as locks, tags, chains, etc.,
for attachment to energy isolating devices in the following
operations:

a) Employees setting up tire assembly machines.

b) Employees setting up bead forming machines.

c) Employees setting up curing presses and cleaning doper
machines.

d) Employees unjamming mills and extruders.

e) Employees unjamming mixers and feed belts.

f) Employees installing parts and unjamming modules machines.

The Secretary alleges that Respondent failed to provide employees with the necessary
equipment to implement the LOTO procedures required to be instituted pursuant to section
147(c)(4)(i) for items 1-6 supra .

Respondent does not dispute this point. In fact, Respondent
asserts, in essence, that there was no need to provide the materials to employees because it
believed, in good faith, that LOTO procedures were not required for the activities listed above.
Thus, to provide the materials to employees would only constitute an unnecessary act. As
discussed above, however, the Secretary has demonstrated, by a preponderance of the evidence,
that LOTO procedures including providing the necessary equipment to employees were required
for the activities described. Moreover, the failure to institute the procedures and provide the
required materials exposed employees to a substantial probability that death or serious physical
harm could result.

Respondent argues vigorously that this violation, if supported by the evidence, was not
willful in nature for the reasons set forth at pg. 22 supra (Willful Discussion). However, based
upon the “Des Moines” citation, Respondent had a heightened awareness of the need to institute
LOTO procedures for the tire assembly machines (item 7(a)), the curing presses (item 7(c)) and
the banbury (item 7(e)). Accordingly, the failures to provide necessary protective materials and
equipment to employees engaged in the aforesaid work activities are affirmed as willful
violations.

The Secretary has established, however, that the work activities performed by
Respondent’s employees as described in items 7(b), &(d) and 7(e) of the citation exposed those
employees to serious physical harm or death. Moreover, this item was tried as a serious
violation within the meaning of the Act with the implied consent of the parties. Supra pg. 41.
Accordingly, items 7(b), 7(d), 7(f) and the doper machine (item 7(c)) of the citation and
complaint are amended pursuant to Rule 15(b) of the Federal Rules of Civil Procedure to allege
serious violations of the Act and the citation and complaint, as amended, are affirmed.

Items 8(a) Failure to Inspect and 8(b) Failure to Certify Inspection

Items 8(a) and 8(b) of the Citation read as follows:

(a) 29 CFR 1910.147(c)(6)(i): The employer did not conduct an
annual or more frequent inspection of the energy control procedure
to ensure that the procedure and requirements of this standard were
followed:

At the plant[,] periodic inspections were not performed at least
annually in order to verify and to ensure that the energy control
program was being properly utilized in the following operations:

a) Employees setting up the tire assembly machine.

b) Employees setting up bead forming machines.

c) Employees setting up curing presses and cleaning doper machines.

d) Employees unjamming mills and extruders.

e) Employees unjamming mixers and feed belts.

f) Employees installing parts and unjamming modules machines.

(b) 29 CFR 1910.147(c)(6)(ii): The employer had not certified that
periodic inspections of the energy control procedures had been
performed.

At the plant[,] the employer failed to certify that the periodic
inspections were performed at least annually in order to verify and
to ensure that the energy control program was being properly
utilized in the following operations:

a) Employees setting up the tire assembly machines.

b) Employees setting up bead forming machines.

c) Employees setting up curing presses and cleaning doper machines.

d) Employees unjamming mills and extruders.

e) Employees unjamming mixers and feed belts.

f) Employees installing parts and unjamming modules machines.

As previously stated, Respondent acknowledges that it did not institute LOTO procedures
for the machines and work activities listed above. Thus, Complainant has cited Respondent for
failing to conduct periodic inspections of a non existent energy control procedure as well as its
failure to certify that the inspections were performed.

There is evidence in the record that Respondent’s safety managers, Mr. McCowan and
Ms. Mattocks, at various times reviewed the existing procedures regarding the applicability of
the LOTO standard to the work activities performed by Dayton Tire employees. Mr. McCowan
first became safety and plant manager in 1972 and served in that capacity until 1990. (Tr. 4411)
He is familiar with the operations of each machine relevant to this matter and authored the safe
operating procedure for each machine. (Tr. 4426) He reviewed each type of machine and the
work activities relevant to this litigation during early 1990 shortly after the LOTO standard had
been promulgated and concluded that the standard was not applicable to those work activities
because, in his view, all of the activities were performed during normal production and exempt
from the standard. (Tr. 4414, 4458) He also conducted safety “walk throughs and reviews” of
each department on a monthly basis. (Tr. 4446) In addition, Mr. McCowan’s successor, Ms.
Mattocks, relied upon Mr. McCowan’s determination that all service and maintenance functions
were performed by Ogden Allied personnel and Dayton employees were engaged solely in
production work. However, upon being alerted by Industrial Hygienist Kearney that LOTO
procedures may be applicable to some work activities performed by Dayton employees, Ms.
Mattocks contacted production supervisors and foremen to determine whether any job functions
performed by Dayton employees had changed since McCowan’s evaluation. After receiving a
negative response, Ms. Mattocks concluded that Ms. Kearney’s observations were incorrect. All
of this leads to the conclusion that safety procedures were being reviewed regularly by Mr.
McCowan and Ms. Mattocks. Those reviews confirmed the initial, but erroneous, conclusion
that the LOTO standard was not applicable to the work performed by Dayton employees. The
Secretary apparently takes the position that the required inspections, if conducted properly,
should have revealed the need to apply LOTO procedures to the work activities in question. To
the extent that the inspections failed to reveal that requirement, in the context of this case, the
citation is affirmed. Moreover, the failure of the inspections to reveal the need for the
application of the LOTO standard exposed employees to a substantial probability that death or
serious physical harm could result. Thus, the evidence supports a serious violation of the
standard.

The record does not, however, support a finding that Respondent willfully violated the
standard as alleged. It is clear that Respondent’s safety personnel were regularly and routinely
inspecting and reviewing safety procedures and practices in the Oklahoma City plant. The
requirements of the LOTO standard were reviewed and evaluated by Mr. McCowan and Ms.
Mattocks. Although their efforts were not entirely effective or complete, it cannot be said that
their actions justify a finding of willful conduct for this violation notwithstanding the fact that
the same violation was cited at the Des Moines location. See Williams Enterprises, Inc., 1986-87 CCH OSHD ¶ 27, 893; Secretary of Labor v. General Motors Corp., Electro-Motive Div., 14
BNA OSHC 2064 (1991); Secretary of Labor v. Keco Industries, Inc., 13 BNA OSHC 1161
(1987).

With respect to the failure to certify the results of inspections it is undisputed that
Respondent failed to comply with the provisions of that standard. There is no evidence,
however, that Respondent’s failure to comply with the standard exposed employees to serious
physical harm or death. Accordingly, this subitem is affirmed as an other than serious violation.
For the reasons stated above, there is no basis for concluding that the violation was willful as
alleged.

Citation I, 92 items

29 C.F.R. 1910.147(c)(7)(i): The employer failed to train each
authorized employee with respect to all training elements listed
under Item (A) of this section specifically training in the
recognition of applicable hazardous energy sources the type and
magnitude of energy available in the workplace, and/or the
methods and means necessary for isolation control.

The Secretary alleges that Respondent failed to train 92 employees

engaged, as part of
their work activities, in the service and maintenance of the machines and equipment discussed
supra (Items 1-6 of the complaint) at the “authorized” level. See footnote 9 supra . Respondent
agrees that the employees listed in the complaint were not provided with training at the
authorized level. Moreover, Respondent conceded that each named employee was assigned to
work in one of the job classifications listed in items 1 through 6 of the complaint.

See Joint
Stipulations supra. Accordingly, in light of the findings above (items 1 through 6), each of the
listed employees should have been trained at the authorized level prior to engaging in those work
activities. Thus, the aforesaid failure to train violations are affirmed.

Respondent vigorously disagrees with Complainant’s characterization of the violations as
willful. Respondent argues that it believed in good faith that it had complied with the LOTO
standard. Moreover, each employee listed in the complaint had received training at the
“affected” level. See footnote 8 supra . Thus, according to Respondent, there was no failure to
train; at most there was a failure to provide the proper level of training. In effect, Respondent
argues that it made a good faith effort to comply even though its efforts were not entirely
effective or complete. See Williams Enterprise, Inc., 13 BNA OSHC 1249, 1257 (1987);
Secretary of Labor v. Woolsten Construction Co., 15 BNA OSHC 1114, 1119 (1991), aff’d, 15
BNA OSHC 1634 (D.C. Cir. 1992).

Although Respondent provided “affected level” training to its employees, the issue is
whether Respondent intentionally disregarded or was plainly indifferent to its responsibility to
provide employee training at the authorized level. Respondent has recited a number of grounds
in support of its good faith defense. See pg. 27-31 supra . No convincing defense has been
offered, however, for Respondent’s disregard for the Des Moines citation (Exh. C-92), and the
notice to Respondent via that citation that work activities at the Oklahoma City facility may be
subject to LOTO requirements. As demonstrated above, an analysis of those machines and work
activities, items 1 (TAMS), 3 (curing press) and 5 (Banbury) of the complaint, should have
alerted Respondent of the hazards to which its employees were exposed and the need to provide
training at the authorized level for those employees. Based upon the record evidence, it is
concluded that Respondent willfully violated the training standard for twenty-one TAM size
changers (Items 9, 10, 11, 27-30, 32-34, 37-40, 45, and 51-56), ten curing press mold, bladder
and PCI ring changers (Items 22, 36, 44, 57-63), and two Banbury operators (Items 26 and 50).
S ee Willful Discussion supra at pgs. 31-34. For the reasons stated supra at pg. 41, the remaining
training violations are affirmed as serious violations.

Item 107 Fatal Injury on M6 85 TAM

Item 107 of the Citation reads as follows:

29 CFR 1910.147(d): No orderly application of energy control as
required by this paragraph was utilized on the M6 85 Inline tire
assembly machine during setup operations on October 19, 1993,
which resulted in the unexpected cycling of the machine, fatally
injuring an employee.

As to this item, the Respondent cites 29 CFR 1910.147(d) which reads, in relevant part,
as follows:

The established procedures for the application of energy control
(the lockout or tagout procedures) shall cover the following
elements and actions and should be done in the following
sequence:

Following the above language are six numbered subparagraphs listing the actions that must be
taken during a lockout or tagout procedure. The citation fails to give any notice of which
subsection is being cited or whether some or all of the subsections are cited. In his posthearing
memorandum, Complainant states without equivocation that Item 107 of the citation cites
Respondent for failing to comply with section 1910.147(d)(2). (Complainant’s Memorandum at
pg. 76) The citation clearly does not cite Respondent for violating 1910.147(d)(2) nor has
Complainant at any time sought to amend the citation to reflect that alleged violation. On the
other hand, Respondent has not objected to the citation as written nor raised the language of the
citation as an issue. The evidence elicited regarding this item relates to the fatal accident
sustained by one of Respondent’s employees while engaged in the setup of the M-6 TAM
machine. (Tr. 2661-62, 2779-82, 2798, 2814-16, 3248-49) Based upon the record, it is
concluded that the parties tried the issue of whether Respondent violated section 1910(d)(2) by
consent. Accordingly, pursuant to Rule 15(b) of the Federal Rules of Civil Procedure, citation
item 107 is amended to allege a violation of section 1910.147(d)(2). National Realty and
Construction Co. v. OSHRC, 489 F.2d 1257 (D.C. Cir. 1973); John and Ray Carlstrom, 6 BNA
OSHC 2101 (1978); Rodney E. Fossett, 7 BNA OSHC 1915 (1979).

Section 1910.147(d)(2) reads as follows:

(2) Machine or equipment shutdown.

The machine or equipment shall be turned off or shut down using
the procedures established for the machine or equipment. An
orderly shutdown must be utilized to avoid any additional or
increased hazard(s) to employees as a result of the equipment
stoppage.

This item alleges that Respondent failed to shutdown the machine using established
procedures for the machine and to insure an orderly shutdown of the machine. The citation
implies that LOTO procedures for the machine were in existence for the M-6 machine and
Respondent failed to follow those established procedures. The record clearly establishes,
however, that Respondent had no LOTO procedures for any of the TAM machines at the time of
the inspection. Thus, the violation is Respondent’s failure to have established LOTO procedures
in the first instance. Respondent has been cited for that violation and that citation has been
affirmed. Supra pg. 21. Since Respondent failed to establish LOTO procedures in accordance
with 1910.147(c)(4) for the M-6 TAM machine, this item is further amended pursuant to Rule
15(b) of the Federal Rules of Civil Procedure to reflect a violation of that standard and
incorporated as an additional violation under item 1 of the citation. For the reasons stated supra
at 41, this item, as amended, is affirmed as a willful violation.

Instance By Instance Citation (Egregious)

The citation initiating this action was issued to Respondent, in large part, pursuant to
Complainant’s so called “egregious policy.” The Department’s Deputy Director for the
Directorate of Compliance Programs, Mr. H. Barrien Zettler, testified on behalf of Complainant
to explain the basis for the egregious policy and its application in this case. According to
Zettler, the Department normally groups instances of the same or similar violations as one
violation with a single proposed penalty. See Secretary of Labor v. Caterpillar, Inc., 15 BNA
OSHC 2153, 2170 (1993). Under the egregious policy, each violation is cited separately and a
separate penalty is proposed for each item. Thus, as in this case, rather than citing Respondent
for one violation of the training standard (29 CFR 1910.147(c)(7)(i)); ninety-two separate
violations representing Respondent’s failure to train ninety-two employees at the authorized
level were alleged with a separate penalty for each violation. The genesis of the egregious
policy occurred during 1986 when the Department concluded that the penalties OSHA had been
proposing were “ineffectual”; that is, the penalties “were not having the effect that the statute
intended those penalties to have.”

(Tr. 5341) According to Zettler, “ the purpose of the
penalties is to persuade the violating employer to correct the violations” and “persuade the rest
of industry...they cannot with impunity violate the standards.” Id. Zettler further testified that
“the Agency believed that it needed to find a way to increase penalties for employers who
needed to be persuaded in a more effective manner, and industries that needed to be persuaded in
a more effective manner that they could not with impunity violate the standards.” (Tr. 5342)
Although the instance by instance program initially focused on record keeping violations, the
scope of the program soon expanded into safety and health matters such as ergonomics,
construction, the chemical industry and other areas where large numbers of fatalities and injuries
were occurring. The Agency “tried to focus on those areas which we believed employers were
neglecting, were determining not to try - not to come into compliance.” (Tr. 5346) In 1990, the
Agency issued CPL 2.80 (Exh. C-112), Complainant’s policy statement for issuing instance by
instance citations. The criteria which must be met before an instance by instance citation may be
issued pursuant to that instruction are (1) that the alleged violation must be classified as “willful”
and (2) at least one of the following elements must be present:

(a)         The violations resulted in worker fatalities, a
worksite catastrophe, or a large number of injuries
or illnesses.

(b)         The violations resulted in persistently high rates of
worker injuries or illnesses.

(c)         The employer has an extensive history of prior
violations of the Act.

(d)         The employer has intentionally disregarded its
safety and health responsibilities.

(e)         The employer’s conduct taken as a whole amounts
to clear bad faith in the performance of his/her
duties under the Act.

(f)          The employer has committed a large number of
violations so as to undermine significantly the
effectiveness of any safety and health program that
might be in place.

No statutory or judicial authority has been cited as a basis for this criteria nor is there any
indication as to the weight to be accorded each element. Moreover, it is unclear which elements
were present in this case which convinced Mr. Zettler that this matter should be treated as an
“egregious” case. Mr. Zettler continually emphasized the point, however, that it is necessary, in
his opinion, to assess high penalties under the egregious policy in order to achieve compliance
with the Act. Specifically, the Agency has designated the LOTO standard as one of four
standards for which the egregious policy will be applied in order to achieve compliance with
those standards. (Tr. 5352) Moreover, “an important part of the egregious program is not
simply the size of the penalty, but the wide spread...public notice of that penalty.”

(Tr. 5355)

Unlike routine citations issued by local Area Directors, “egregious” cases are reviewed
by Mr. Zettler and his staff at the national office to determine whether the case satisfies the
criteria to be issued as egregious. Upon being satisfied that the case merits an egregious
designation, Mr. Zettler formulates recommendations to be presented to the Assistant Secretary
or the Deputy Assistant Secretary of Labor for final approval. (Tr. 5366) Although Mr. Zettler
did not personally review the investigation file in this case, he was briefed by his staff and
concluded that the case should be issued as egregious with the maximum penalty of $70,000 per
violation. Mr. Zettler did not consider the penalty factors set forth at section 17(j) of the Act

when he proposed the penalties for the alleged violations, even though he knew that the gravity
factor was not the same for each violation. (Tr. 5436-38, 5449-50) The stated purpose for
issuing the citation in this manner was to “send a message”

to Respondent and the tire
manufacturing industry by proposing a penalty of such magnitude that compliance with the
LOTO standard would be enhanced. ( See generally testimony of H. Berrien Zettler Tr. 5334-5500; Complainant’s Posthearing Brief at pg. 104 et seq.) Moreover, the Secretary takes the
position that assessing penalties falls within his “prosecutorial discretion” to which the
Commission must defer (Complainant’s Reply Brief at pg. 23-24) notwithstanding the plain
language of section 17(j) of the Act granting penalty assessing authority solely to the
Commission. Secretary of Labor v. Hern Iron Works, Inc ., 16 BNA OSHC 1619 (1994).

Respondent vigorously argues that the Secretary’s manipulation of the statute and the
LOTO standard to arrive at one of the largest penalties in the history of the Act was arbitrary and
capricious and a violation of the due process notice requirement. (Respondent’s Post-Trial Brief
at pg. 20 citing Kolender v. Johnson , 461 U.S. 352, 357-58 (1982)) Respondent argues that
Complainant’s written “egregious” policy is nothing more than a vehicle to enforce the
“personal predilections” of government personnel. Id . Respondent points to the fact that the
primary decision maker in this case, Mr. Zettler, does not worry about government compliance
with CPL 2.80, Complainant’s egregious policy, when issuing citations. (Tr. 5459-60) Thus,
Complainant’s “egregious” policy is no policy at all and provides no notice to employers as to
the criteria that must be met before a citation will be issued. (Respondent’s Brief at pg. 20)
Moreover, according to Respondent, the arbitrary application of the egregious policy “is out of
all proportion to any culpability Dayton may have had regarding the LOTO standard and any
legitimate interest that the Secretary may have in deterring future LOTO violations.”
(Respondent’s Brief at pg. 22) Respondent also cites Diamond Roofing, Inc. v. OSHRC, 528
F.2d 645 (5th Cir. 1976), that “an occupational safety and health standard must give an employer
fair warning of the conduct it prohibits or requires, and it must provide a reasonably clear
standard of culpability to circumscribe the discretion of the enforcing authority and its agents .”
Id. at 649 (emphasis added).

As the Supreme Court has made clear, the statutory scheme enacted by Congress
“contemplates that the rights created by the [OSH] Act are to be protected by the Secretary.”
Cullahoga Valley Ry. v. United Transp. Union , 474 U.S. 3, 6 (1985). Exclusive rulemaking and
broad prosecutorial authority are vested in the Secretary. See sections 6(b), 8(a) and 10 of the
Act. Moreover, instance by instance citing of individual violations falls within the prosecutorial
discretion of the Secretary. Secretary of Labor v. Caterpillar, Inc., 15 BNA OSHC 2153
(1993). Indeed, a finding of “willful” is not necessary to affirm instance by instance violations.
Caterpillar supra; J.A. Jones, 15 BNA OSHC 2201 (1993). The Commission has held that the
test to be applied for determining the appropriateness of instance by instance citing is whether
the cited standard prohibits individual acts or a single course of conduct. Caterpillar supra
(citing Blockburger v. United States , 234 U.S. 299 (1934)). In Secretary of Labor v. Sanders
Lead Co., 17 OSHC BNA 1197 (1995), the Review Commission held that multiple citing of the
same standard was appropriate in that case because the cited standard required evaluation and
action “under certain unique circumstances peculiar to each employee .” I d at 1203 (emphasis
added). The Review Commission rejected instance by instance citing of a roofing standard
however, where the employer’s failure to comply with the standard was a single violation which
exposed six employees to the hazard. Secretary of Labor v. Hartford Roofing Co. , 17 OSHC
BNA 1361 (1995). The Commission held that “where a single practice, method, or condition
affects multiple employees there can be only one violation of the standard. Id at 1365. See also
Secretary of Labor v. Arcadian Corp., 17 OSHC BNA 1345 (1995).

Armed with his broad prosecutorial powers, the Secretary possessed wide discretion in
citing Respondent in this case for the violations disclosed during his investigation. At the low
end of the spectrum, the Secretary could have cited Respondent for one violation of the general
LOTO standard set forth at 29 CFR 1910.147(c)(1)

for its failure to establish an energy control
program for the machines listed in items 1 - 6 of the citation; failure to train the 92 employees
listed in the citation as well as the required inspections set forth at item 8 of the citation. A
single penalty, assuming willfulness, in the amount of $70,000 could have been proposed and a
second citation alleging a violation of 29 CFR 1910. 147(c)(5)(i) (Item 7, failure to provide
locks, tags, etc.) with a $70,000 proposed penalty would cover all of the violations alleged in the
citation issued by the Secretary. At the other end of the spectrum, the Secretary possessed
discretion to cite Respondent for violating 29 CFR 1910.147(c)(4)(1) for each individual
machine described in items 1 - 6 of the citation. Thus, an individual citation could have been
issued for each of the 58 TAM machines (item 1), 5 beadwinding machines (item 2), 180 curing
presses and 7 doper machines (item 3), 4 tubers (item 4), 3 banburys (item 5) and 21 module
machines (item 6) for a total of 278 separate violations. See Hartford Roofing supra . Assuming
a willful allegation for each machine, the maximum proposed penalty would be $19,460,000.
Similarity, individual citations for 29 CFR 1910.147(c)(5)(i) (item 7) and 29 CFR
1910.147(c)(6)(i) (item 8) could have been issued for each of the 278 machines with a maximum
proposed penalty of $38,920,000. Finally, as cited in this case, failure to train each employee
could be cited separately for an additional maximum penalty of $6,440,000. Thus, the proposed
penalty range available to the Secretary in the exercise of his prosecutorial discretion is a low of
$140,000 or less to a high of $64,820,000.

The Secretary, of course, did not exercise his full discretionary powers in this case. (Tr.
5576-80) Items 1 - 6 allege that Respondent failed to institute energy control procedures for
each type of machine even though two distinctly different machine types are included in item 3
(curing presses and doper machines). (Tr. 5401) Respondent’s failure to train employees at the
authorized level is cited on an instance by instance basis; however; its failure to provide locks,
tags, etc. to each employee are combined into one item (item 7) and the failure to conduct annual
inspections for each machine and certify those inspections are similarly combined into one item
(item 8(a) and 8(b)). There appears to be no logical or rational basis for citing Respondent in the
manner set forth in the citation and Complainant has been unable to give a rational explanation
for the methodology utilized by the Secretary when drafting the citation other than to “send a
message” to Respondent and others in the tire manufacturing industry. (Tr. 5482, 5572-81)
Complainant freely acknowledges, however, that the egregious policy was utilized in this matter
for the sole purpose of raising the proposed penalty to achieve that end.

Respondent vigorously objects that the proposed penalty is grossly excessive and finds
little solace in the fact that the Secretary did not fully exercise his prosecutorial discretion by
applying the egregious policy to its full extent in this case. (Tr. 5603) Respondent cites TXO
Prod. Corp. v. Alliance Resources Corp., 113 S. Ct. 2711 (1993), and Pacific Mutual Life Ins.
Co. v. Haslip , 11 S. Ct. 1032, 498 U.S. 1306 (1991), for the proposition that the government
cannot impose a grossly excessive penalty simply because that penalty will deter others.
(Respondent’s Reply Brief at pg. 15) In a later case, BMW of North America, Inc. v. Gore , 116
S.Ct. 1589 (1996), the Supreme Court, in finding that a two million dollar award was grossly
excessive and therefore exceeded constitutional limits, stated: “[e]lementary notions of fairness
enshrined in this Court’s constitutional jurisprudence dictate that a person receive fair notice not
only of the conduct that will subject him to punishment but also of the severity of the penalty
that a State may impose.” Id. at 1598. The case involved the award of damages assessed by a
jury against an automobile manufacturer for failing to disclose to the purchaser of a new
automobile that it had been repainted prior to the original sale. In his concurring opinion Justice
Breyer stated:

Requiring the application of law rather than a decisionmaker’s
caprice, does more than simply provide citizens notice of what
actions may subject them to punishment; it also helps to assure the
uniform general treatment of similarly situated persons that is the
essence of law itself.

Id. at 1605.

Justice Breyer concluded that the standards applied by the state were vague and open ended to
the point where they risked arbitrary results. See also Seaboard Air Line Railway v. A.L.
Seegers, 28 S. Ct. 28, 30 (1907).

It is well established that the Secretary may cite individual violations of the same
standard on an instance by instance basis and it is concluded that the citation issued in this case
satisfies the requirements for issuing instance by instance violations. Hoffman Construction, 6
BNA OSHC 1274, 1977-78 CCH OSHD ¶ 22,489 ; Caterpillar, Inc. supra; Hartford Roofing
supra; Sanders Lead supra . However, authority to assess a penalty for those violations lies
solely within the discretion of the Review Commission. Section 17(j) of the Act; Hern Iron
Work, supra . As stated by the Review Commission:

The key question for penalty purposes is not how many
errors or omissions there were, but what penalty is appropriate.
Thus, although the Secretary may cite separate omissions to record
injuries as separate violations, he may not exact a total penalty that
is inappropriate in light of the four factors listed in section 17(j) of
the Act; the gravity of the violations, the employer’s good faith,
its size, and its history of violations.

Caterpillar supra at 2173.

The penalties proposed by the Secretary in this case bear no relationship to the factors set
forth at section 17(j) of the Act. (Tr. 5450) On that basis alone, the penalty recommendation of
the Secretary must be rejected. Furthermore, the egregious policy was applied arbitrarily in this
case to propose a high penalty in order to effectuate the “public policy” of the Act without any
assurance of “uniform general treatment of similarly situated persons.” BMW v. Gore supra .

Since the egregious policy was applied by the Secretary for the sole purpose of influencing the
assessment of a penalty, the application of that policy may be disregarded by the Review
Commission when assessing a penalty in this case. In other words, that which the Secretary
considered for purposes of proposing a penalty may be reviewed and accepted, modified or
rejected by the Review Commission for purposes of assessing a penalty pursuant to section 17(j)
of the Act. Caterpillar supra . See penalty section infra .

Penalty

Section 17(j) of the Act requires that due consideration must be given to four criteria in
assessing penalties: the size of the employer’s business, gravity of the violation, good faith and
prior history of violations. In Secretary of Labor v. J.A. Jones Construction Company , 15 BNA
OSHC 2201 (1993), the Commission stated:

These factors are not necessarily accorded equal weight; generally
speaking, the gravity of a violation is the primary element in the
penalty assessment. Trinity Indus., Inc. , 15 BNA OSHC 1481,
1483, 1992 CCH OSHD ¶29,582, p. 40,033(No. 88-2681, 1992);
Astra Pharmaceutical Prods., Inc., 10 BNA OSHC 2070(No. 78-6247), 1982). The gravity of a particular violation, moreover,
depends upon such matters as the number of employees exposed,
the duration of the exposure, the precautions taken against injury,
and the likelihood that any injury would result. Kus-Tum Builders,
Inc., 10 BNA OSHC 1128, 1132, 1981 CCH OSHD ¶25,738 p. 32,
107 (No. 76-2644, 1981).

As previously discussed, the Secretary did not apply the penalty factors set forth at section 17(j)
of the Act as a basis for proposing penalties for the violations alleged. Accordingly, the
penalties proposed by the Secretary must be disregarded for purposes of assessing penalties
pursuant to section 17(j) of the Act. See Brennan v. OSHRC (Interstate Glass Co.) 487, F.2d
438 (8th Cir. 1973); Colorado Fuel & Iron Steel Corp., 2 BNA OSHC 1295 (1974).

The Secretary established by a preponderance of the evidence that Respondent violated
29 C.F.R. 1910.147(c)(4)(i) (failure to establish and use a hazardous energy control procedure)
for seven distinct types of machines (items 1-6 of the citation). The evidence establishes that
Respondent willfully violated that standard for the tire assembly machines (item 1); the curing
presses (item 3(a)) and the Banbury mixers and feed belts (item 5). Because Respondent had a
“heightened awareness” of these violations or the likelihood of their existence, each violation
shall be considered separately for purposes of establishing a penalty.

First, with respect to the tire assembly machines, the record supports a finding of a high
gravity factor for all of the second stage TAM machines and, in particular, the M-6 TAM
machine. There is a high probability of severe injury from the unexpected energization of these
machines including death. This fact has been dramatically demonstrated by the tragic death of a
size changer for the M-6 machine. The violation extended to each of the 58 second stage TAM
machines at Respondent’s location. Accordingly, the maximum penalty of $70,000 is assessed
based upon the high gravity factor. No reduction in the penalty is warranted because of good
faith or history in view of the willful nature of the violation.

With respect to the curing presses, (item 3) the record similarly supports the conclusion
that a high gravity factor exists as a result of the unexpected energization of the machines. Such
movement by this massive machine would likely result in severe physical harm to the exposed
employee. Moreover, the probability of injury and the extent of the violation are likewise high.
Accordingly, in view of the willful nature of the violation, a penalty in the amount of $70,000 is
assessed. No reduction of that penalty is justified on the basis of good faith or history

in view
of Respondent’s “heightened awareness” of the violation.

Although a willful violation has been established relating to the Banbury mixers and feed
belts (item 5) the gravity factor for that violation is less than that which was established for the
TAMS and the curing presses. Although there is evidence that employees could sustain a severe
laceration and possible broken bones as a result of the unexpected energization of these machine
parts, there is no evidence that death is likely to occur. Thus, the severity of injury is not as great
as for the TAMS and curing presses. Nevertheless, a significantly high gravity factor was
established by the Secretary based upon the severity of a resulting injury, the probability of
injury and the extent of the violation. Accordingly, a penalty in the amount of $50,000 is
assessed for the violation. As with the other willful violations, supra , no reduction in the penalty
is justified based upon Respondent’s good faith and history of previous violations.

The other violations of 29 CFR 1910.147(c)(4)(i) relate to the bead winding machines
(item 2), the doper machines (item 3), the tuber mills, extruders and the Dayton Loader (item 4)
and the module machines (item 6). All of these items have been found to be serious violations
within the meaning of the Act. With respect to the bead winding machine, the evidence
establishes that changing the wire reels and the chuck could result in lacerations and possible
finger bone fractures. There is no history, however, of any injuries to employees while changing
wire reels or the bead winding chuck. Based upon the evidence it is concluded that the gravity
factor for this violation is moderate. Of the five bead winding machines, two are automated.
However, since the employees are clearly not engaged in production work when changing wire
reels and chucks, no credit is given for good faith. Based upon the foregoing, a penalty in the
amount of $5,000 is assessed for this violation.

Although the doper machines were combined with the curing presses by the Secretary
(item 3), the machines are completely different and pose different hazards to employees. Unlike
the curing presses, the hazards to which employees cleaning the doper machines are exposed are
relatively minor. There is evidence that the unexpected energization of the doper machine could
expose an employee to bruises, minor lacerations, and, possible broken bones to the hands. The
probability of an employee sustaining those injuries, however, is slight. Furthermore, there is no
history of any employee being injured while cleaning the doper machine. Accordingly, it is
concluded that the gravity of this violation is low and a penalty in the amount of $3,000 is
assessed.

With respect to the tread tuber and Dayton Loader (item 4) the evidence supports the
conclusion that employees were exposed to serious physical harm in the event that the machines
became unexpectedly energized while the employees were removing jammed rubber from the
mills, extruders, the Dayton Loader and conveyor belts. Based upon the record, it is concluded
that a moderate gravity factor must be applied in assessing a penalty for this violation. Only two
tuber operators were listed as exposed employees to hazards (items 19 and 108 of the citation).
There is no evidence as to the total number of exposed employees nor is there any evidence of
the duration of employee exposure. Although there is evidence of multiple “misses”; involving
a high potential for employee injury as a result of unexpected energization, there is no evidence
on the record of any actual injuries. Accordingly, a penalty in the amount of $5,000 is assessed
for this serious violation.

Item 6 of the citation (module machines) has been affirmed as a serious violation of the
Act. Complainant lists forty-six employees exposed to the hazards presented by this violation
and called a large number of those employees to testify at the hearing in this matter. Based upon
that testimony, it is concluded that a high gravity factor must be applied in assessing a penalty.
Many employees have been exposed to severe lacerations and possible broken bones for long
periods of time with few or no precautions being taken to protect employees from potential
injuries resulting from unexpected energization of these machines. For the foregoing, reasons, a
penalty in the amount of $7,000 is assessed for this violation.

Item 7 of the citation alleges that Respondent failed to provide appropriate locks, tags,
etc, to employees operating the machines listed in items 1 - 6 of the citation. The violation has
been affirmed as willful for three of the seven machines listed (items 7(a) TAM machines, item
7(c) curing presses and item 7(e) banbury). The other alleged violations have been affirmed as
serious violations. Although the Secretary has not articulated a rational basis for combining
these particular violations into one item of the citation with a single proposed penalty, other than
the exercise of his broad prosecutorial discretion, there is nothing in the record which supports a
separate penalty for each willful violation. Nevertheless, an analysis of each willful violation in
relation to the penalty factor is necessary in order to assess a penalty.

With respect to the TAM machines, the Secretary has presented convincing evidence that
a high gravity factor should be assessed for this violation. In addition to its failure to establish a
lockout procedure for these machines, Respondent’s failure to provide appropriate lockout
devices to exposed employees could have resulted in serious physical harm and, in one instance,
did result in the death of an employee. The severity of the resulting injury due to this violation
mandates the maximum penalty.

Similarly, with respect to the curing presses, these massive machines exposed the
mold/bladder changers, PCI changers, to severe physical harm or death. Accordingly, great
weight is given to the severity of injury factor when assessing a penalty for this violation.

Item 7(e), the banbury, has also been affirmed as a willful violation. The gravity factor,
however, is not as high for this violation see supra pg. 84-85. Specifically, the severity of a
resulting injury is not as great as the TAM or curing presses. Nevertheless, the gravity factor for
the three machines is high. Accordingly, a penalty in the amount of $70,000 is assessed for
items 7(a), 7(c) (curing press) and 7(e) of the citation.

The remaining sub-items of item 7 have been affirmed as serious violations. As
previously discussed, the high penalty gravity factor for the module machine alone warrants a
maximum penalty. Accordingly, a penalty in the amount of $7,000 is assessed for items 7(b),
7(c) (doper machines), 7(d) and 7(f).

Items 8(a) and 8(b) have been affirmed as a serious and other than serious violations,
respectively. While it is true that Respondent’s employees, Mr. McCowan and Ms. Mattocks,
reviewed safety procedures within the plant on a regular basis, it is clear that those reviews failed
to achieve the intended purpose of the cited standard; that is, to uncover work activities which
exposed employees to injury as a result of unexpected energization of machines. In that respect,
the inadequate inspections (reviews) exposed employees to serious physical harm or death
(citation items 1 - 6 supra ). Although the failure to certify that periodic inspections had been
conducted has been affirmed as an other than serious violation, the overall effect of these
violations in combination exposed employees to a high gravity factor. Accordingly, a penalty in
the amount of $7,000 is assessed for item 8(a) and (b) of the citation.

The remaining 92 items cited by the Secretary involve Respondent’s failure to train 92
employees at the “authorized” level. The Secretary proposed a maximum penalty of $70,000 for
each violation for a total proposed penalty of $6,440,000. For the reasons stated supra at pg. 74,
it is concluded that the Secretary has established that thirty-three (33) of the failure to train
violations were “willful.” The remaining fifty-nine (59) failure to train violations have been
affirmed as “serious” violations.

The penalty proposed by the Secretary for the failure to train violations constitutes a
major issue in this case. The primary violation committed by Respondent was its decision that
LOTO procedures need not be instituted for the work activities listed in items 1 - 6 of the
citation. Those violations represent an application of the Secretary’s “egregious” policy as a
result of Respondent’s failure to develop, document and utilize procedures for the control of
potentially hazardous energy ( 29 CFR 1910.147(c)(4)(i)). The Secretary concluded that
Respondent willfully violated that standard and proposed the maximum penalty of $420,000,
pursuant to the egregious policy, for the violations (Items 1 - 6 of the citation). As a
consequence of its conclusion that LOTO procedures were not required for the work activities
listed in the citation, Respondent, based upon that conclusion, failed to provide to each employee
engaged in the activities described in items 1 - 6 of the citation, the locks, tags, chains and other
equipment necessary to perform the LOTO procedure. The Secretary properly cited Respondent
for failing to comply with that standard (29 CFR 1910.147(c)(5)(i)). However, rather than citing
Respondent for the failure to provide the necessary equipment to each employee, the Secretary
combined the violations into one item and proposed a penalty of $70,000.

Also as a consequence of its conclusion that LOTO procedures were not required for the
work activities listed in items 1 - 6 of the citation, Respondent declined to train employees
engaged in those activities at the “authorized level.” Rather than citing Respondent for one
violation of this standard (29 CFR 1910.147(c)(7)(i)) consistent with the manner in which the
Respondent was cited for its failure to provide necessary LOTO equipment to each employee,
the Secretary issued separate violations as to each employee and proposed the startling penalty
of $6,640,000. Thus, the principle violation (failure to institute LOTO procedures) has a
proposed penalty of $420,000, a secondary violation resulting from the initial violation (failure
to provide LOTO equipment to each employee) had a proposed penalty of $70,000 and another
secondary violation (training) had a proposed penalty over 15 times higher than that proposed
for the principle violation. The Secretary has provided no rational explanation for his decision to
cite only one instance of one secondary violation and 92 instances of another secondary
violation. Moreover, there is no evidence that, having instituted LOTO procedures, Respondent
would decline to provide the necessary equipment and training to employees particularly since
there is no evidence of a history of prior “failure to train” violations at the Oklahoma City
location. It appears that the Secretary has the cart before the horse; the primary violation has a
comparatively modest proposed penalty and a secondary violation has a proposed penalty far in
excess of that proposed for the principle violations due primarily to the application of the
Secretary’s egregious policy for that violation. Under these circumstances, it is not clear what
“message” is being sent to Respondent nor is there any indication that the egregious program as
applied in this case, in the words of Justice Breyer, represents “the application of law rather than
a decision maker’s caprice ....” BMW supra at pg. 1605.

The Secretary, as previously discussed, has the authority to issue instance by instance
citations for Respondent’s failure to train each employee and this Commission must defer to that
decision even though the Secretary has not articulated a rational basis for instituting that policy
as applied in this case. Thus, I am constrained to assess a penalty as to each willful failure to
train of at least $5,000 per violation (see footnote 24). The application of the statutory penalty
factors for the “failure to train” violations would, under ordinary circumstances, result in a
penalty equivalent to that assessed for Respondent’s failure to provide necessary LOTO
equipment to each employee (Item 7 supra at pg. 87). Thus, although a penalty in the amount of
$70,000 would be appropriate for Respondent’s willful failure to train employees at the
authorized level, I am forced to assess a penalty in the amount of $5,000 for each willful
violation (33) for a total penalty of $165,000.

The remaining fifty-nine (59) “failure to train” violations have been affirmed as serious
violations. As previously stated, the Commission has held that “[t]he key question for penalty
purposes is not how many errors or omissions there were, but what penalty is appropriate”
Caterpillar supra at 2173. Thus, the penalty must be based upon the penalty factors set forth at
section 17(j) of the Act. Based upon those factors, it is concluded that the overall gravity factor
for the failure to train employees is moderate to high. A large number of employees are affected
by the violation and, in many instances, serious physical harm or death could result from the
violation. Although there is no history of previous violations, it is concluded that a penalty in
the amount of $1,000 is appropriate for each violation for a total penalty of $59,000.

Findings of Fact and Conclusions of Law

All findings of fact relevant and necessary to a determination of the contested issues have
been made above Fed. R. Civ. P. 52(a). All proposed findings of fact and conclusions of law
inconsistent with this decision are denied.

Order

(a)         Willful Citation Item No. 1 alleging a violation of 29 CFR 1910.147(c)(4)(i) is affirmed
and a penalty in the amount of $70,000 is assessed.

(b)         Willful Citation Item No. 2 alleging a violation of 29 CFR 1910.147(c)(4)(i) is affirmed
as a serious violation and a penalty in the amount of $5,000 is assessed.

(c)        Willful Citation Item No. 3(a) (curing press) alleging a violation of 29 CFR
1910.147(c)(4)(i) is affirmed and a penalty in the amount of $70,000 is assessed.

(d)         Willful Citation Item 3(b) (doper machine) alleging a violation of 29 CFR
1910.147(c)(4)(i) is affirmed as a serious violation and a penalty in the amount of $3,000 is
assessed.

(e)         Willful Citation Item No. 4 alleging a violation of 29 CFR 1910.147(c)(4)(i) is affirmed
as a serious violation and a penalty in the amount of $5,000 is assessed.

(f)          Willful Citation Item No. 5 alleging a violation of 29 CFR 1910.147(c)(4)(i) is affirmed
and a penalty in the amount of $50,000 is assessed.

(g)         Willful Citation Item No. 6 alleging a violation of 29 CFR 1910.147(c)(4)(i) is affirmed
as a serious violation and a penalty in the amount of $7,000 is assessed.

(h)         Willful Citation Items 7(a), 7(c) (curing press) and 7(e) alleging a violation of 29 CFR
1910.147(c)(5)(i) are affirmed and a penalty in the amount of $70,000 is assessed.

(i)          Willful Citation Items 7(b), 7(c) (doper machine), 7(d) and 7(f) alleging a violation of 29
CFR 1910.147(c)(5)(i) are affirmed as serious violations and a penalty in the amount of $7,000
is assessed.

(j)          Willful Citation Item No. 8(a) alleging a violation of 29 CFR 1910.147(c)(6)(i) is
affirmed as a serious violation and Item No. 8(b) alleging a violation of 29 CFR 1910.
147(c)(6)(i) is affirmed as a non-serious violation with a total penalty in the amount of $ 7,000
assessed for both violations.

(k)         Willful Citation Items 9,10,11,27-30, 32-34, 37-40, 45, 51-56, 22, 36, 44, 57-63, 26, and
50 (33 violations) alleging violations of 29 CFR 1910.147(c)(7)(i) are affirmed as willful
violations with a penalty of $5,000 assessed for each violation (total penalty $165,000).

(l)          Willful Citation Items 12, 14-17, 20, 21, 23-25, 35, 41-43, 46-48, 64-83, 85-98, 100-106
(59 violations) are affirmed as serious violations and a penalty of $1,000 is assessed for each of
the violations.

(m)        Willful Citation Items 13, 18, 31, 49,84, 88 and 99 were withdrawn by the Secretary.

(n)         The total penalty for all violations is $518,000.

/s/

ROBERT A. YETMAN

Judge, OSHRC

Dated:   February 21, 1997

Boston, MA

Get today's answer for your situation

You just read Commission precedent from 2010. Ezel checks whether it still stands, including any court review since, and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.