OSHRC Commission decision Docket 91-0556 Decided November 15, 1994 Citations affirmed

Anthony Crane Rental, Inc.

Crane inspection and maintenance violations affirmed after court remand

Apply this precedent to your situation

This is citable Commission precedent from 1994, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 1994
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission
This is a decision of the Occupational Safety and Health Review Commission, the highest level of agency review, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals after issuance; check subsequent history before relying on it. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

Anthony Crane Rental leased a crane whose boom later collapsed at an airport construction project, killing another contractor's employee. After a court remand, the issue was whether Anthony Crane Rental's own employees had been exposed to the conditions involving missing annual-inspection records and defective or untimely repaired crane components. The Commission found exposure because the company's delivery employee and mechanic were on or near the crane while defects existed and while the crane operated. It affirmed one nonserious and two serious violations involving inspection records, adjustments, and repairs. The judge's penalties of $100, $800, and $1,000 remained in place.

Decision snapshot

  • Cited standard(s): 29 C.F.R. §§ 1926.550(a)(6) and 1926.550(b)(2).
  • Outcome: Affirmed. The Commission upheld three crane inspection and maintenance items with total penalties of $1,900.
  • Key point: Employee exposure is established when it is reasonably predictable that employees will enter the zone of danger, including while delivering, observing, or servicing defective equipment.

Full text (OSHRC public release)

                                         1




                                              :

SECRETARY OF LABOR, :
:
Complainant, :
:
v. : OSHRC Docket No. 91-556
:
ANTHONY CRANE RENTAL, INC., :
:
Respondent. :
:

                                    DECISION

BEFORE: WEISBERG, Chairman; MONTOYA and GUTTMAN, Commissioners.
BY THE COMMISSION:
This case is before the Commission for the second time. It arises out of an accident
in which the boom of a crane collapsed at a construction worksite at the Greater Pittsburgh
International Airport. The crane had been leased by Anthony Crane Rental, Inc. (“ACR”) to
Midwest Conveyor Construction Services (“Midwest”), a subcontractor at the site. The crane
oiler, who was Midwest’s employee, was killed in the accident. Following an inspection, the
Secretary issued citations under the Occupational Safety and Health Act of 1970, 29 U.S.C.
§§ 651-678 (“the Act”), alleging that ACR failed to comply with provisions of 29 C.F.R.
§ 1926.550, the Secretary’s standard governing cranes and derricks, in that the crane was not
properly inspected and maintained and had a number of safety defects. The issue before us
is whether Administrative Law Judge Michael H. Schoenfeld erred in finding that employees
of ACR were exposed to the conditions at issue in subitems 2e; instances 2, 3, and 4 of
2

subitem 3c(a); and subitem 6a of citation no. 2.1 We conclude that the judge did not err, and
we affirm his decision.
I. Citation No. 2, Item 2e: No Record of Annual Inspection or Certification of Inspection
The standard requires both that the crane receive an annual inspection and that the
employer maintain a record of the inspection.2 At issue is item 2e, which alleged that ACR
failed to maintain the required record.

1
The Commission first considered this case on review of Judge Schoenfeld’s decision holding
ACR responsible for the exposure of employees of other contractors at the site. Anthony
Crane Rental, Inc., 16 BNA OSHC 2107, 1993-95 CCH OSHD ¶ 30,620 (No. 91-556,
1994), aff’d in part, vacated and remanded in part, 70 F.3d 1298 (D.C. Cir. 1995). The
Commission concluded that the judge properly determined that ACR created and controlled
the violative conditions and therefore correctly applied the Commission’s well-settled
principles for allocating responsibility for violations of the Act at multi-employer
construction worksites. Anning-Johnson Co., 4 BNA OSHC 1193, 1975-76 CCH OSHD
¶ 20,690 (No. 3694, 1976) (consolidated); Grossman Steel & Aluminum Corp., 4 BNA
OSHC 1185, 1975-76 CCH OSHD ¶ 20,691 (No. 12775, 1976). On review, the D.C. Circuit
observed that whether an employer can be found in violation of the Act for the exposure of
employees not its own is a question of first impression in that court, but it declined to decide
that issue at this time. Rather, the court remanded to the Commission for further factual
findings on whether ACR’s employees were exposed to the hazards at issue. In turn the
Commission remanded to the judge, and it is his decision finding that employees of ACR
were exposed to the hazards that is now before us for review.

Although both parties in their briefs reargue whether ACR has a duty under the Act to protect
employees of other employers from hazards it created or controlled, in view of our
disposition it is unnecessary for us to reach that question.
2
The standard provides as follows:

   § 1926.550 Cranes and derricks.
   (a) General requirements. . . .
   ....
   (6) A thorough, annual inspection of the hoisting machinery shall be made by
   a competent person, or by a government or private agency recognized by the
   U.S. Department of Labor. The employer shall maintain a record of the dates
   and results of inspections for each hoisting machine and piece of equipment.

3

   The facts are largely undisputed. ACR inspected the crane at its service facility in

West Mifflin, Pennsylvania, before sending the crane to Midwest on October 8, 1990. ACR’s
employee James Workman drove the crane, which is a truck crane, to the airport construction
site. When the crane was delivered, the heel of the boom and the boom hoist cable were in
place, and at the site Workman went into the operator’s cab and demonstrated the operation
of the crane for James Cepec, Midwest’s crane operator. Enough of the crane was assembled
at that time for Workman to be able to check whether the boom stop functioned. Thereafter,
Jeffrey Paisley, ACR’s mechanic responsible for making repairs to the crane, was at the
worksite either working on the crane or in its vicinity on a number of occasions.
William Draper, the compliance officer, noted that the term “hoisting machinery”
used in the standard refers to all components that enable the crane to lift and lower loads.
Therefore, the appropriate inspection is necessary to protect employees against the serious
hazards that could result from defects in these components. Both Draper and Ronald Kohner,
the Secretary’s expert witness, testified that a record of dates and results of inspections helps
a crane lessor such as ACR accomplish this objective by ensuring that the crane has been
inspected with the thoroughness required by the standard before it is sent onto a job and by
providing a “yardstick” to determine when the crane is due for reinspection. Similar
testimony was given by: Joseph Beasley, the union business manager; Andrew Davis, ACR’s
shop maintenance superintendent at its Florida branch; and Ronnie Lee, an operator and
equipment mechanic for a construction company that had rented the crane earlier in 1990.
The test for determining whether employees are exposed to a hazard is whether it is
“reasonably predictable” that employees would be in the zone of danger created by a
noncomplying condition. Kokosing Constr. Co., 17 BNA OSHC 1869, 1870, 1997 CCH
OSHD ¶ 31,207, p. 43,722 (No. 92-2596, 1996); RGM Constr. Co., 17 BNA OSHC 1229,
1993-95 CCH OSHD ¶ 30,754, p. 42,729 (No. 91-2107, 1995); Gilles & Cotting, Inc., 3
BNA OSHC 2002, 2003-04, 1975-76 CCH OSHD ¶ 20,448, p. 24,425 (No. 504, 1976). ACR
does not dispute that its employees were near the crane but contends that the Secretary failed
4

to show that the noncomplying conditions on the crane resulted from its failure to have a
record of the crane’s annual inspections. The standard, however, does not require proof that
the absence of an inspection record was the direct cause of a specific defect in the crane. As
the judge properly determined, the standard is intended to ensure that the employer has
sufficient information to institute an adequate maintenance program. See General Dynamics
Corp., Electric Boat Div., 15 BNA OSHC 2122, 2128 n.13, 1991-93 CCH OSHD ¶ 29,952,
pp. 40,955-57 n.13 (No. 87-1195, 1993) (quick and efficient identification and correction of
potential hazards through the maintenance of accurate records is essential to an effective
safety program). Since the evidence shows, and ACR does not dispute, that Workman, who
delivered the crane, as well as Paisley, the mechanic at the site, were sufficiently close to the
crane to be exposed to any unsafe or defective condition that might result from an inadequate
preventive maintenance program, the judge properly determined that exposure of ACR’s
employees was established.
II. Citation No. 2, Item 3c(a): Adjustments Not Maintained to Assure Correct Function
of Components
At issue are instances 2, 3, and 4 of this subitem, which allege the following defects
respectively: two load hoist drum mechanisms controlling the power down (safety
adjustments controlling the movement of pistons and springs nonfunctional), boom cable
shroud cover (misaligned guide sheave and cover), and tail shaft governor (proper speed
control not provided).3

3
The standard requires in pertinent part:

   § 1926.550 Cranes and derricks.
   ....
   (b) Crawler, locomotive, and truck cranes. . . .
   (2) All crawler, truck, or locomotive cranes in use shall meet the applicable
   requirements for design, inspection, construction, testing, maintenance and
   operation as prescribed in the ANSI B30.5-1968, Safety Code for Crawler,
   Locomotive and Truck Cranes.
                                                                         (continued...)

5

   The record shows that the crane was at the job for about three weeks and in actual use

for about five days during that time. James Cepec, Midwest’s crane operator, was dissatisfied
with the crane as soon as he started making lifts with it. Among other things, the braking
action on the load line was not smooth, and the power down4 did not work. Also, the jib
pendant lines were very rusty. On October 9, when Paisley came out to the site, Cepec
demonstrated the improper operation, and Paisley went onto the crane and examined the
power down. Two days later Paisley returned and began working on the power down. At the
same time Paisley also repaired the crane’s horn and a bushing at the rear of the crane as well
as the boom dog linkage. The latter controls the raising of the boom and had to be properly
engaged in order for the crane to operate safely. After Paisley had completed the repairs to
his satisfaction, Cepec wanted to be sure that the power down was working properly; at
Cepec’s request Paisley remained while Cepec lifted a load.
The day of the accident, October 26, 1990, Paisley came out again because the boom
kept swinging to the left. After making that repair, Paisley went to the rear of the crane to
address another of Cepec’s complaints—that the oil tank was leaking. He then remained to

3
(...continued)
The citation references section 5-2.3.3-b of the ANSI standard, which provides as follows:

   Section 5-2.3 – Maintenance
   ....
   5-2.3.3 Adjustments and Repairs
   ....
   b. Adjustments shall be maintained to assure correct functioning of
   components. The following are examples:
   1. All functioning operating mechanisms.
   2. Safety devices.
   3. Control systems.
   4. Power plants.

4
The “power down” is a system that allows the rate of descent of a load to be reduced and
controlled by the gear train and engine in addition to the brakes, much as a motorist might
downshift into a lower gear while going down a steep hill.
6

observe the crane’s operation and left when it appeared that the boom was no longer
swinging.5 Cepec had also noticed that the boom would repeatedly “jump” from one position
to another. This condition persisted until the day before the accident, when Midwest
determined that it was due to a groove that allowed the cable to lie and accumulate in one
place instead of distributing itself over the full width of the drum. As a temporary fix, an
ironworker drove a wedged-shaped piece of wood into the cable spool to keep the cable
directed away from the groove.
Draper felt that the defects in the crane were such as to present hazards of the crane
overturning and the boom or load falling, which could result in crushing injuries or death to
those near the crane. This hazard could occur even on a light load because defective wire
rope greatly diminishes the safety factor of the crane and a malfunction in the hoist drum
could cause the rope to break. Injury could occur directly or from collateral impact of parts
flying off the crane or being struck by broken cables. Draper specifically described Paisley
as being exposed inasmuch as he was at the crane while it was operating or while he was
making repairs.
The judge found that ACR’s employees when engaged in delivery, observation, or
repair were on the crane or in its “immediate vicinity” at a time when the defective
conditions existed and therefore found that they came within the zone of danger created by
the violative conditions. We agree, and we reject ACR’s contentions to the contrary as
unsupported by the record.
ACR asserts that no exposure to hazards resulting from the defective power down
could have existed after October 11, when Paisley adjusted the power down, and that the
record does not “definitively” establish that Paisley was exposed when he was at the site
prior to this date. In ACR’s view, the record is deficient because it does not show where

5
Paisley also testified to further exposure, stating that he would stop by the site occasionally
and “observe” the crane operation just to check if the operator was having any problems.
These observations were in addition to his actual repair work.
7

Paisley was located when he observed the improper operation of the crane on October 9 and
therefore does not establish “reasonable predictability” that Paisley would be within a zone
of danger. Similarly, there is no evidence that Workman was exposed to this hazard when
he delivered the crane. Draper, however, testified that Paisley would have been in close
proximity to the crane while performing his tasks including “reviewing” the condition of the
crane. Although Paisley in his own testimony was not asked how close he came to the crane
when observing it prior to October 11, Cepec testified that Paisley actually went onto the
crane on October 9. Accordingly, ACR’s contention that Paisley was not shown to be within
the zone of danger is contrary to the evidence.6
As to the boom cable shroud at issue in instance 3, ACR contends that it is not shown
on the record when the defective condition of this component developed and that because
the boom was not rigged when the crane was brought to the site, Workman could not have
been exposed even if the boom shroud had been defective at that time. ACR also claims that
Paisley was not exposed either because the insertion of the wedge corrected the hazard and
that the “most reasonable inference from the evidence” is the wedge was inserted “shortly
after” delivery of the crane.
As ACR correctly notes, Draper regarded the wedge as a “field adjustment” that
allowed the cable to function correctly. However, Draper also concluded that the condition
under which the cable had been running through the groove in the shield would have resulted
in damage to the cable with the resultant hazard of the cable breaking. Moreover, contrary
to ACR’s contention, there is direct evidence that Midwest did not insert the wedge until the

6
In his first decision, the judge found that Paisley was exposed to the hazard at issue in
instance 1 of subitem 3c(a), which also involved components that affected the power down.
Although instance 1 is not before us now, we note that the court recognized the obvious
factual similarity between the specific conditions at issue in instances 1 and 2 and concluded
that exposure to the hazard at issue in instance 1 would very likely be indistinguishable from
exposure to that involved in instance 2. 70 F.3d at 1305.
8

day before the accident. Since it is undisputed that Paisley made numerous visits to the crane
during the intervening time, we find exposure of Paisley is established.
Lastly, ACR does not dispute that the defective condition of the tail shaft governor
existed during the time when its mechanic was present at or near the crane but instead asserts
that there is no evidence to show that Paisley was within the zone of danger. However, ACR
presented no evidence to rebut the testimony of Draper that all of the cited conditions,
including the tail shaft governor, present similar hazards in terms of “catastrophic failure”
of the crane, collapse of the boom, dropping of the load, and load-bearing components of the
crane breaking apart. Accordingly, we find that there was exposure of an ACR employee to
the cited hazard.
III. Citation No. 2, Item 6a: Repairs or Replacements Not Provided Promptly as Needed
for Safe Operation on All Critical Parts.
This item refers to components—pawl assemblies and rod bolts—involved in the
drum hoist system for operating the boom and the power down.7 Draper’s investigation
revealed that these conditions were not corrected until October 11. Again, in Draper’s view

7
The citation cites the same paragraph of section 1926.550 as the preceding item and section
5-2.3.3-c of the ANSI standard, which states:

   Section 5-2.3 – Maintenance
   ....
   5-2.3.3 Adjustments and Repairs
   ....
   c. Repairs or replacements shall be provided promptly as needed for safe
   operation. The following are examples:
   1. All critical parts of functional operating mechanisms which are cracked,
   broken, corroded, bent, or excessively worn.
   2. All critical parts of the crane structure which are cracked, bent, broken or
   excessively corroded.
   3. Crane hooks showing defects described in 5-2.1.2-a.5 [deformations or
   cracks] shall be discarded. Repairs by welding or reshaping are not generally
   recommended.

9

these are “critical operating parts” that if not repaired can result in “catastrophic failure” and
crushing or fatal injuries. Anyone in the “immediate working area” of the crane, including
Paisley, would be exposed.
The judge noted that the gravamen of this charge is that repairs were not provided in
a prompt fashion. He found that the necessity for repairs was made clear to ACR on the first
day the crane was at the jobsite, October 8, but that repairs were not conducted until October

  1. In the intervening period, Paisley was exposed because he was aboard the crane and in
    the vicinity of the crane while a load was being lifted. The judge emphasized that he was not
    finding that ACR was responsible for the exposure of Paisley while Paisley was attempting
    to discover a defect or make a repair. Rather, the judge reasoned that the longer a defect is
    allowed to exist, the more likely it is that an accident will occur. Thus, by failing to promptly
    correct the defective condition, ACR exposed its employee to a hazard covered by the cited
    standard.
    The only argument ACR presents in opposition to the judge’s findings and reasoning
    is again that the Secretary failed to show that ACR’s employees were within the zone of
    danger created by the hazardous conditions. We reject this contention for the same reasons
    given above with respect to the location and activities of Paisley and Workman.
    Accordingly, for the reasons set forth above, we affirm the judge’s decision as to each
    of the items here at issue.8
                                                /s/
    

8
Although the violations in question were alleged as willful, the judge affirmed subitem 2e
as a nonserious violation and subitems 3c(a) and 6a as serious violations. The judge assessed
penalties of $100, $800, and $1000 respectively. The characterization of the violations is not
before us, and neither party contends that if violations are found, the judge’s penalty
assessments are inappropriate.
10

                        Stuart E. Weisberg
                        Chairman


                        /s/
                        Velma Montoya
                        Commissioner


                        /s/
                        Daniel Guttman
                        Commissioner

Dated: March 3, 1997