Chris Welch employed a worker who performed residential roofing more than 10 feet above the ground without fall protection. The worker accessed the roof using an extension ladder whose side rails did not extend three feet above the landing and that lacked an alternative secure handhold arrangement. Respondent did not appear at the simplified-proceedings hearing, and counsel's same-day illness notice did not request a continuance. The judge found that OSHA proved the applicability, violation, exposure, and employer knowledge elements for both cited standards. Both items were affirmed as serious, and penalties totaling $4,000 were assessed.
Decision snapshot
- Cited standard(s): 29 C.F.R. § 1926.501(b)(13); 29 C.F.R. § 1926.1053(b)(1)
- Outcome: Serious residential fall-protection and ladder items affirmed; $4,000 in penalties assessed.
- Key point: Residential roofers working above six feet need compliant fall protection, and an access ladder must extend three feet above the landing or provide the required secured alternative.
Full text (OSHRC public release)
Chris Welch., Docket No. 16-0687
United States of America
OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION
1120 20th Street, N.W., Ninth Floor
Washington, D . C .
20036-3457
SECRETARY OF LABOR,
Complainant,
v.
OSHRC Docket No. 1 6 - 0 687
CHRIS WELCH ,
Respondent.
Appearances: M. Patricia Smith, Solicitor of Labor
Christine Z. Heri,
Regional Solicitor
Christine Eskilson,
Attorney
U.S. Department of Labor, Office of the Solicitor,
Boston ,
Massachusetts
For the Secretary
Nancy C. Flahive
Law Office of Nancy C. Flahive ,
Springfield,
Ma ssachusetts
For the Respondent
Before: Dennis L. Phillips
Administrative Law Judge
SIMPLIFIED PROCEEDING
D ECISION AND ORDER
Background
This proceeding is before the Occupational Safety and Health Review Commission
(Commission)
pursuant to section s 2-33
of the Occupational Safety and Health Act of 1970, 29
U.S.C. §§ 651-678
(OSH Act) . On March 9, 2016,
the Occupational Safety and Health Administration (OSHA)
inspected
Respondent Chris Welch’s (Respondent or Chris Welch)
worksite
located at 740 Bradley Road, Springfield, Massachusetts 01109 . As a result ,
OSHA issued to R espondent a serious citation containing two items
a lleging
violation s
of
OSHA’s
construction
standard s and proposing a total penalty of $4, 00 0.
Respondent
filed a timely notice of contest
pursuant to
section 10(c) of the OSH Act , bringing this matter before the Commission.
Citation 1, Item 1 alleges that Respondent violated 29 C.F.R. § 1926.501(b)(13). The item asserts that on March 9, 2016, an employee of Respondent
“ was
roofing this residence without any fall protection, more than 10 feet above the ground below.” (Citation at 6) .
The proposed penalty for Citation 1, Item 1 is $2,000. The standard provides:
§ 1926.501 Duty to have fall protection.
(b)(13)
Residential construction . Each employee engaged in residential construction activities 6 feet or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protraction measure[…].”
29 C.F.R. § 19 26.501(b)(13).
Citation 1, Item 2 alleges Respondent violat ed
29 C.F.R. § 1926.1053(b)(1). The citation asser t s that on March 9, 2016, an employee of
R espondent
“ was
using an orange fiberglass extension ladder to ac c ess the roof top work location that did not extend the required 3 feet past the upper landing surface.” (Citation at 7) . T he proposed penalty for Citation 1, Item 2 is $2,000. The standard provides:
§ 1926. 1053
Ladders.
(b)(1)
Use . The following requirements apply to the use of all ladders, including job-made ladders, except as otherwise indicated: (1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such as extension is not possible because of the ladder’s length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a lo ad
would, by itself, cause the ladder to slip off its support.
29 C.F.R. § 19 26. 1053 (b)(1).
On May 25, 2016, pursuant to Commission Rule 203(a), 29 C.F.R. § 2200.203(a), this case was assigned to Simplified Proceedings where pleadings were not required and the
F ederal
R ules of Evidence did not apply at the hearing. (Tr. 9) .
Based on the evidence in the record, and for the following reasons, the citation
items
are affirmed.
Th e Hearing
On
May 26, 2016,
the Notice of Pre-Hearing Scheduling Conference and Order
was
sent out –
and the
Order was not returned
by the U.S. Post Office to the Commission – notifying the parties of an upcoming June 17, 2016 Conference Call .
Respondent’s counsel did not
participate in
the June 17, 2016, Conference Call.
Later on June 17, 2016, the Notice of Hearing & Scheduling Order was sent out – and this Notice & Order
(Scheduling Order)
was also not returned by the U.S. Post Office to the Commission. The Scheduling Order : 1 )
directed the parties to file pre-hearing statements no later than September 1, 2016 , 1
2) set the final pre-hearing conference call for September 2,
2016, 3) directed the parties to file their trial exhibits with the Court by September 19, 2016,
and
4)
scheduled
the trial to commence
on September 26, 2016
at Boston, Massachusetts.
F ootnote 1 of the Scheduling Order also
noted
that
Respondent failed to participate in the June 17, 2016 Conference Call and issued a warning that future non-participation could result in sanctions including dismissal of the case. 2
The Secretary timely filed a pre-hearing statement on September 1, 2016. Respondent did not file a pre-hearing statement. During the September 2, 2016 Conference Call, the Court notified Respondent’s counsel, who was in attendance, about the untimely pre-hearing statement. (Tr. 6) . During the Conference Call, Respondent’s counsel indicated to the Court that she would submit a final pre-hearing statement by the end of that day, September 2, 2016. (Tr. 6) . To date, the Court has not received Respondent’s pre-hearing statement.
The hearing for this cas e was held on September 26, 2016
at
Boston, Massachusetts . Respondent was not in attendance. 3 (Tr. 5-6) . Respondent’s counsel notified the Court ’s Legal
Assistant located at Washington, D.C.
via electronic mail on the morning of the hearing, at
about
8: 28
a.m.,
that she will not be in attendance due to illness. 4 (Tr. 6) .
In her notice to the Court, Respondent’s counsel did not request a trial continuance. Instead, she stated
“If need be, I will assume responsibility for my client’s assessed fine in this matter by OSHA; however, I had absolutely no control over the present circumstances.” The hearing was held as scheduled. 5 (Tr. 6;
see
also
29 C.F.R. §§ 2200.62(c) (requests to postpone trials to be submitted within seven days of the trial date or they will most likely be denied) ;
64(a) (failure to appear at the hearing may result in a decision against a party) ) . Before proceeding with the trial , t he Court noted that Respondent had violated the Court’s scheduling order by not filing its pre-hearing statement by September 1, 2016 or trial exhibits
with the Court
by September 19, 2016. (Tr. 6-7).
The Secretary’s attorney, Ms. Eskilson,
presented
her
case.
She
offered several exhibits that were admitted into evidence at the hearing.
(Tr. 9-10;
Ex s .
1 - 4 ) .
No joint exhibits or stipulations between the parties were entered into the record. (Tr. 10-11) . The Court denied the Secretary’s request for a ruling from the bench ,
citing Commission Rule 64,
Failure to Appear,
which gives five days to the party who failed to attend the hearing to show good cause
as to why the hearing should be continued . (Tr. 36;
29 C.F.R. § 2200.64(b) ) . Respondent has made no such request. T he evidence produced
by the Secretary is uncontested since Respondent failed to appear at the hearing
or
proffer
any trial exhibits.
Byrd Produce Co .,
16 BNA OSHC at 1269 (p arties are generally bound by the actions of their hired representatives ). As this case was designated for Simp lified Proceedings, no post-hearing briefs were filed. (Tr. 36;
29 C.F.R. § 2200.200(b)(6) ( For simplified proceedings,
“ [i] nstead of briefs, the parties will argue their case orally before the Judge at the conclusion of the hearing.”) .
Jurisdiction
The
evidence
establishes
that,
at
the
time
of
the
OSHA
inspection,
Respondent
was
performing roofing work on a residential construction site
in
Springfield , Massachusetts . (Tr. 17-18, 22, 24-25).
Roof
repair
qualifies
as
"construction
work"
which
is
defined
as
"work
for
construction,
alteration,
and/or
repair,
including
painting
and
decorating."
29
C.F.R.
§
1926.32(g).
The
construction
indu stry
as
a
whole
affects commerce,
and even small
employers within that
industry are
engaged in
commerce.
Slingluff v.
OSHRC ,
425
F.3d
861,
866-67
(10th
Cir.
2005);
Clarence
M.
Jones,
d/b/a
C.
Jones
Co. ,
11
BNA
OSHC
1529,
1531
(No.
77-3676, 1983).
The
record
also
establishes
that
Respondent
had
at
least
one
employee
who
was
working as a roofer on
Respondent’s
worksite .
(Tr.
1 8-22, 25; Exs.
1-3 ) .
Additionally,
Respondent
filed a timely notice of contest
pursuant to
section 10(c) of the OSH Act.
Based upon the record, the Court finds that at all relevant times
Respondent
was engaged in a business affecting commerce and was an employer within the meaning of
sections
3(3) and 3(5) of the
OSH
Act. The Court
conclude s
that the Commission has jurisdiction over the parties and subject matter in this case , and Respondent is covered under the OSH Act .
The Secretary’s Burden
o f Proof
To establish a violation of a safety or health standard, the Secretary must prove by a preponderance of the evidence:
“(1) that the cited standard applies; (2) that there was a failure to comply with the standard; (3) that employees had access to the violative condition; and (4) that the employer had actual or constructive knowledge of the violation.” P. Gioioso & Sons,
Inc. v. Occupational Safety and Health Review Co m m ’ n , 675 F.3d 66, 72 (1st Cir. 2012) (citation omitted);
see also
Astra Pharm. Prod s ., 9 BNA OSHC 2126, 2129 (No. 78-6247, 1981),
aff’d in relevant part , 681 F.2d 69 (1st Cir. 1982). 6
D iscussion
On
March 9, 201 6 , at 12:41 p.m., OSHA Compliance Officer
(CO)
Daniel Lynaugh was driving down Bradley Road in Springfield, Massachusetts, on his way back to the OSHA area office from another OSHA inspection, when he observed a rooftop worker on a low-slope residential roof without fall protection. He pulled over on a side street, called the OSHA Area Director
(AD) , and received permission from the
AD
to open a local emphasis program inspection. (Tr.
13, 17- 18 , 22 ) .
CO Lynaugh walked up the driveway to the residence and took pictures. The
eave of the
roof was 10.5 feet high
from the ground. The roof itself was low-sloped.
On the rooftop, a
single
worker was
stripping the roof using “a big rake,”
and on the side of the house, a nother
worker was picking up shingles and debris
off the ground. There was a large greenish dumpster on the driveway
that is
typically used to remove the roofing debris. (Tr.
18-19,
23 , 26 ; Ex s . 1 -4 ) .
The roofer’s name was Keith Sarno. CO Lynaugh
called
up to Mr. Sarno on the roof, showed him his credentials, and asked Mr. Sarno i f
he could come down from the roof so that they could discuss fall protection. Mr. Sarno descended from the rooftop using a ladder. The ladder’s top rung was the only rung that extended past the top of the rooftop, and that was how CO Lynaugh determined that the rails of the ladder did not extend at least three feet from the upper landing surface. CO Lynaugh asked
Mr. Sarno
about fall protection, and Mr. Sarno told
him that “he didn’t have any.” CO Lynaugh then explained to Mr. Sarno the hazard of falling off a roof. Mr. Sarno told CO Lynaugh that he worked for Chris Welch, who paid Mr. Sarno to work, and then directed CO Lynaugh to Mr. Welch ,
who was sitting in the shade in a breezeway between the house and the attached garage. 7 (Tr.
19-24 , 30 ; Exs. 1 - 4 ) .
CO Lynaugh approached Mr. Welch and showed him his OSHA credentials. Mr. Welch did not say anything to CO Lynaugh, who described the interaction as “kind of st r ange.”
He told Mr. Welch about his observations regarding the lack of fall protection and asked him whether he had any fall protection. According to CO Lynaugh, Mr. Welch said he did not have any
fall
protection. CO Lynaugh collected Mr. Welch’s name, address and telephone number, and then explained to him “what happens further down the line” for this OSHA inspection. (Tr. 25 -27 ) .
Citation 1, Item 1
alleges
a serious violation of
29 C.F.R. § 19 26.501(b)(13). This standard requires that employees engaged in residential construction,
working more than six feet above the lower level, be provided with appropriate fall protection.
The evidence establishes that
Respondent’ s employee was working on repairing a residential roof that
was at least
10 .5 feet
above the ground.
(Tr. 18-19, 26) .
Respondent was obligated to provide its employee with an appropriate form of fall protection. The cited standard, 29 C.F.R. § 1926.501(b)(13), applies.
Mr.
Sarno
was photographed working
on
the roof top .
He was not provided with any
form of fall protection.
There was no fall arrest system, safety net system, guardrails, or other method of fall protection
at the site. (Tr.
20, 22,
26) .
The cited standard was violated.
Mr.
Sarno
was working on the roof, over six feet above the
ground, and was clearly exposed to the
hazard.
T he evidence
also
establishes that Mr.
Sarno was paid by Mr.
W elch to perform work. (Tr. 22-23) .
Mr. Welch was sitting in the shade on the worksite while Mr. Sarno was on the roof.
(Tr. 24) .
Mr. Welch knew that
he had
no fall protection on the worksite. Knowledge of the hazard has been established.
P. Gioioso , 675 F.3d at 73 (“an employer can be charged with constructive knowledge of a safety violation that supervisory employees know or should reasonably know about.”).
The undisputed evidence establishes that: (1) the standard applies, (2) its terms were violated,
(3) an employee was
exposed to the hazard addressed by the standard and (4) Respondent
k new or with the exercise of reasonable diligence should have known of the violative
condition. This citation item is affirmed.
A violation is “serious” if there was a substantial probability that death or serious physical harm could have resulted from the violative condition. 29 U.S.C. § 666(k). To successfully characterize a violation as “serious,” the Secretary need only show that
“
‘ an
accident
is possible and there is a
substantial
probability
that death or serious physical harm could result from the
accident . ’ ”
Flintco, Inc. , 16 BNA OSHC 1404, 1405-06 (No. 92-1396, 1993)
(citation omitted). The record establishes
that a fall from the
roof
could have caused serious physical harm. CO Lynaugh testified that if a worker fell from 10 feet, “the probability that you’re going to break something is high.” (Tr. 28) . R oofing is an inherently dangerous activity.
See Daniel Crowe Roof Repair , 23 BNA OSHC 2001, 2017 (No. 10-2090, 2011)
(ALJ)
(roofing an inherently dangerous activity).
A fall of over six feet to the ground is likely to result in death
or serious physical
i njury.
(Tr. 31) .
This citation item is properly characterized as serious.
Citation 1, Item
2
allege s
a serious violation of
29 C.F.R. § 19 26.1053(b)(1) . This standard requires that portable ladders
used to access an upper landing surface must
extend at least three feet past the upper landing . The evidence
shows that
the ladder was portable and that
Mr. Sarno accessed it to enter and exit the rooftop. (Tr. 21; Ex. 3) .
The cited standard applies. Photographic evidence shows that only the top rung of the ladder extended past the edge of the rooftop. (Ex. 3) .
CO Lynaugh testified that
“ninety-nine percent of the ladders manufactured in America, the rungs are 12 inches apart, so it was a quick, you know, visual clue, and there’s only one rung past the top. It doesn’t extend three feet.” (Tr. 30) . The cited standard was violated. Mr. Sarno used the ladder to access and exit from the rooftop, and was therefore exposed to the hazard.
As with Item 1, the evidence establishes that
Mr.
Sarno was paid by Mr.
W elch to perform work. Mr. Welch was sitting in the shade on the worksite while Mr. Sarno was on the roof, and when Mr. Sarno used the ladder to come down from the roof to talk to CO Lynaugh. (Tr. 24) .
Based on the photographic evidence, the ladder was in plain view
and was the only means of accessing the rooftop on the worksite. (Ex. 3) .
Mr. Welch had the obligation to adequately supervise his employees, anticipate hazards to which employees may be exposed, and take measures to prevent the occurrence of violations. S.J. Louis Constr.
o f Tex. , 25 BNA OSHC 1892, 1894 (No. 12-1045, 2016). Mr. Welch knew or with the exercise of reasonable diligence should have known that the ladder did not extend past three feet of the upper landing. Knowledge of the hazard has been established.
Id.,
at 1894 ;
P. Gioioso , 675 F.3d at 73 (“an employer can be charged with constructive knowledge of a safety violation that supervisory employees know or should reasonably know about.”).
The undisputed evidence establishes that:
(1) the standard applies, (2) its terms were violated,
(3) an employee was
exposed to the hazard addressed by the standard and (4) Respondent
k new or with the exercise of reasonable diligence should have known of the violative
condition.
This citation item
is affirmed.
As noted above, t he record establishes
that a fall from the
roof
could have caused serious physical harm.
Daniel Crowe Roof Repair , 23 BNA OSHC
at
2017 (roofing an inherently dangerous activity).
A fall of over six feet to the ground is likely to result in death
or serious physical
i njury.
(Tr. 31) .
This citation item is properly characterized as serious. 29 U.S.C. § 666(k);
Flintco, Inc. , 16 BNA OSHC
at
1405-06 .
P enalties
“Section 17(j) of the
[OSH]
Act, 29 U.S.C. § 666(j), requires that when assessing penalties, the Commission must give ‘due consideration’ to four criteria: the size of the employer's business, gravity of the violation, good faith, and prior history of violations.” Hern Iron Works, Inc. , 16 BNA OSHC 1619, 1624 (No. 88-1962, 1994). When determining gravity,
typically
the
most important factor, the
Commission considers the number of exposed employees, the duration of their exposure, whether precautions could have been taken against injury, and the likelihood of injury. Id.
When evaluating good faith:
[T] he Commission focuses on a number of factors relating to the employer's actions,
‘ including the employer's safety and health program and its commitment to assuring safe and healthful working conditions[,] ’
in determining whether an employer's overall efforts to comply with the OSH Act and minimize any harm from the violations merit a penalty reduction.
Monroe Drywall Constr., Inc. , 24 BNA OSHC 1209,
1211
(No. 12-0379, 2013) (citations omitted).
The Commission is the
“final arbiter” of penalties. Hern Iron Works,
16 BNA OSHC at 1622 (citation omitted).
For
serious
Citation 1, Item 1,
the
fall protection
violation,
the
Secretary proposed a
penalty
of
$ 2 ,0 0 0. For serious Citation 1, Item 2, the
ladder v iolation, the Secretary proposed a penalty of $ 2 ,0 0 0. For each of these penalty calculations, the Secretary applied
a discount for the small size of the employer (2 employees). The Secretary gave no credit for good faith because Respondent had no fall protection on site. The Secretary also determined that, for both violations, the severity was high but the probability was low. The probability was low because, due to the weather conditions, it was not icy or slippery, “in all likelihood, he probably wasn’t going to fall.” (Tr.
28-32,
37-40, 49-51, 55-56, 68-70, 78-79, 83-86) .
The Court agrees with the Secretary’s approach to these factors. Respondent is a small employer and has no OSHA history
of violations . One employee was exposed to the fall hazards for at least as long as it took him to rake up the roof. Respondent did not have any fall protection, which could have readily been used as a precaution, on the worksite. See Daniel Crowe Roof Repair , 23 BNA OSHC
at
2017
( a
company's failure to provide its roofers with any form of fall
protection or training demonstrates that it is not entitled to any credit for good faith in the penalty assessment.).
Considering the Section 17(j) factors, the Court
finds that the proposed penalt ies are
appropriate
for th ese
affirmed citation item s .
Findings o f Fact
a nd Conclusions
o f Law
All findings of fact and conclusions of law relevant and necessary to a determination of the contested issues have been made above. See
Fed. R. Civ. P. 52(a). All proposed findings of fact and conclusions of law inconsistent with this decision are denied.
ORDER
Based
upon the foregoing findings of fact
and conclusions of law, it is
ORDERED
that:
1) Item 1 of Citation 1
for a serious violation of Section 5(a)(2) of the
OSH
Act for a failure to comply with the standard at
29 C.F.R. § 1926.501(b)(13) is
AFFIRMED
and a penalty of $2,000 is
ASSESSED ;
and
2) Item
2
of Citation
1
for a serious violation of Section 5(a)(2) of the OSH Act for a failure to comply with the standard at
29 C.F.R. § 1926.1053(b)(1)
is
AFFIRMED
and a penalty of
$ 2 , 0 00
is
ASSESSED .
SO ORDERED.
/s/
The Honorable
Dennis L. Phillips
U.S. OSHRC Judge
Date: June 12, 2017
Washington, D.C.
"
1
The Scheduling Order required the
joint pre-trial statement contain :
[A] n agreed statement of facts and issues, the Respondent shall set forth the factual basis of each affirmative defense as it relates to each specific item, a list of all lay witnesses who may be called at hearing, including a brief summary of testimony to be elicited [The factual substance of the lay testimony must be briefly summarized and a mere list of topics will not meet the requirement.]; a list of all expert witnesses including, as to each expert witness, a statement of subject matter and a summary of the substance of the testimony with respect to each item [Each expert opinion shall be numbered and separately set forth.]; a list of exhibits to be offered into evidence with notations of all objections thereto [footnote here required that
‘All documents or physical evidence intended for introduction at the hearing must be exchanged by the parties no later than 30 days before the commencement of the hearing.’ ],
a list of all motions or other matters which require action by the Judge, an estimate of time each counsel anticipates will be needed to present its case, and the signatures, telephone numbers, and email addresses of counsel for all parties.
2
As there is no evidence in this record that the U.S. Postal Service failed to properly fulfill its duties, it is presumed that Respondent, via its counsel, received all mailings from the Court and the Court holds Respondent responsible for its mail handling procedures, as well as other actions or omissions, as noted below, during this proceeding. Byrd Produce Co.,
16 BNA OSHC 1268, 1269 (No. 91-0823, 1993) (consolidated) (parties are generally bound by the actions of their hired representatives);
Powell v. Commissioner , 958 F.2d 53, 54 (4 th
Cir. 1992)
(holding that, in the absence of evidence to the contrary, it is reasonable to presume that the United States Postal Service officials have properly discharged their duties);
L a. -Pac .
Corp. , 13 BNA OSHC 2020, 2021 (No. 86-1266, 1989) (holding that t he Commission expects e mployers to maintain orderly procedures for handling important documents).
3
Respondent’s counsel’s business address in the record was
the
Law Office of Nancy C. Flahive, 73 Chestnut Street, Springfield, MA
01104. The
citations were issued to Chris Welch at 365 North Road, Broad Brook, CT 06016.
4
The Court received notice of Respondent’s counsel’s intended absence at trial at about 9:30 a.m., September 26, 2016. The Court promptly instructed its legal assistant to advise Respondent’s counsel that the trial would proceed as scheduled and commence at 10:30 a.m.
5
The trial commenced at 10:31 a.m., September 26, 2016. (Tr. 4).
6 The Court finds that the Secretary has proven all of the elements of a violation of each of the cited standards, and no defense was either offered
by Respondent
or found by the Court.
7
CO Lynaugh did not talk to the other worker because that worker was not up on the roof. (Tr. 23-24).