🧪 TEST MODE ACTIVE Use test card: 4242 4242 4242 4242
OSHRC ALJ decision Docket 16-0445 Decided April 10, 2017 Citations vacated Judge John B. Gatto

Vulcan Industrial Contractors Co., LLC

Asbestos cleanup citation vacated

Apply this to your situation

This order from 2017 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current OSHA standards and Commission precedent, with citations.

Currency note: this decision dates from 2017
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final order, not Commission precedent
This decision by an OSHRC Administrative Law Judge became a final order of the Commission because no Commissioner directed review (29 U.S.C. § 661(j)). It binds the parties but is not binding precedent in other cases. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

Vulcan Industrial Contractors performed asbestos abatement on boiler piping at an Alabama power plant using glove bags, sealed work areas, HEPA vacuuming, and disposal controls. OSHA later found a small piece of asbestos-containing debris embedded in a scaffold plank after Vulcan had deregulated the area and another contractor had power-washed the unit. The judge credited Vulcan's witnesses and found that the Secretary did not prove the debris came from Vulcan's work. The Secretary also failed to establish that a Vulcan supervisor knew or should have known of the condition. The serious cleanup citation under 29 C.F.R. § 1926.1101(g)(1)(iii) and its proposed $3,825 penalty were vacated.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1926.1101(g)(1)(iii)
  • Outcome: The citation was vacated and no penalty was imposed.
  • Key point: A positive asbestos sample did not establish liability without proof that the cited employer created or knew of the contaminated debris.

Full text (OSHRC public release)



VULCAN INDUSTRIAL CONTRACTORS CO., LLC, Docket No. 16-0445

United States of America

OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION

100 Alabama St. S.W

Building 1924 Room 2R90

Atlanta, GA 30303-31 0 4

SECRETARY OF LABOR,

Complainant,

v.

OSHRC Docket No.
16-0445

VULCAN INDUSTRIAL CONTRACTORS CO., LLC ,

Respondent.

DECISION AND ORDER

COUNSEL:

LaTasha Thomas, Attorney ,
Office of the Solicitor,
U.S. Department of Labor,
Nashville, TN , for Complainant.

Gary W. Auman, Attorney, Dunlevey, Mahan & Furry, Dayton ,
OH,
for Respondent.

JUDGE :
Honorable John B. Gatto , United States Administrative Law Judge.

I. INTRODUCTION

Vulcan In dustrial Contractors Co., LLC (Vulcan )
was
issued
a citation
with
a proposed penalty of $3,825.00
under the Occupational Safety and Health Act of 1970, 29 U.S.C. § 651 et seq.
by
the
United States Department of Labor’s
Occupational Safety and Health Administration (OSHA ) 1
for
an
alleged
serious 2
violation of
OSHA’s Asbestos
s tandard,
29 CFR
§ 1926.1101 .
The citation resulted from an OSHA investigation of Vulcan’s
asbestos abatement work at Alabama Power Company’s
William Crawford
G orgas
Electric Generating
Plant
(Gorgas Plant) , a multi-employ er worksite located
near Parrish,
Alabama.
After
Vulcan
contested the citation ,
the Secretary
of Labor (Secretary)
filed a formal complaint 3
with the
Commission
seeking an
o rder affirming the citation
and proposed penalt y .
A bench trial was subsequently held in
Birmingham, Alabama .

Pursuant to
Commission
Rule
90 (a), after carefully considering all the evidence and the arguments of counsel, the Court issues this Decision
and Order, which
constitutes its final disposition of the proceedings . For the reasons indicated
infra ,
th e citation
and proposed penalt y
are
VACATED .

II. BACKGROUND

For approximately two weeks
prior to the OSHA inspection,
up until October 1,
2015, Vulcan perform ed
asbestos abatement work at the Gorgas Plant , a multi-employer worksite,
pursuant to a contract with Alabama Power Company ,
where
it
was responsible for removing
asbestos-containing material
from the boiler pipe during pre-outage work .
( Tr.
13, 14,
45 - 46 , 145 ).

There were no other contractors responsible for
the
asbestos removal or clean-up at the Gorgas Plant other than Vulcan (Tr. 20).

In the days leading up to the OSHA inspection, Vulcan had been performing its work in an area of the Gorgas Plant known as Unit 10. (Tr. 47). Vulcan’s work in Unit 10 mainly involved asbestos abatement of thermal system insulation that covered certain piping components of a boiler. ( Tr.
49). Also as part of its work, Vulcan rented and erected the scaffolding , which was used not only by Vulcan, but was used on other shifts by other contractors at the worksite while performing work in Unit 10. (Tr. 87- 89,
90- 91, 100).
   During its work
at Unit 10 , Vulcan employed
s pecific engineering controls and work practices to remove and contain
the asbestos-conta ining
material .

At trial, those controls and practices were described extensively by witnesses Allan Smith, Vulcan’s Director of Industrial Maintenance, and George Rittenhouse, Vulcan’s industrial hygienist at the worksite who maintained an office at the
Gorgas
Plant. 4
( Tr.
45, 124-125). Rittenhouse visited Vulcan’s worksite at Unit 10 every two hours while Vulcan’s employees were working on Unit 10. ( Tr.
124 - 1257).

The Secretary offered no evidence
disput ing
Vulcan’s use of the controls and practices to which these witnesses testified at trial,
and
the Court finds
both witnesses were very
credible.

According to Smith and Rittenhouse,
which the Court credits,
Vulcan’s controls and practices fully contained and promptly cleaned up all
asbestos-containing material
that its work generated in Unit 10, without incident and in compliance with OSHA standards. ( Tr.
56, 75, 108, 113- 114, 125).
Vulcan’s controls and practices were consistent with Vulcan’s overall asbestos abatement program, which Vulcan developed based on OSHA’s standards related to asbestos abatement work. (Tr. 24, 56-57 ; see also
Resp’t’s Exs. 1-
5).

Vulcan used a process known as
“glove bag removal,” which
involved several steps to ensure containment of any
asbestos-containing material. Vulcan workers adhered to the process despite dealing with high temperatures that required Vulcan’s workers to wear a great deal of specialized personal protective equipment. (Tr.
122).

Because of the different levels of elevation involved at Unit 10, Vulcan had to do much of its work from a scaffold, one level at a time. Vulcan performed its Unit 10 abatement work during a day shift that lasted from approximately 6:30 a.m. to 4:30 or 5:00 p.m. (Tr.
76).

At the beginning of each shift, the first step in Vulcan’s glove bag removal process was
the creation of
a containment barricade around the specific areas of piping
that it would be
working
on. (Tr.
52-54).

In the second step,
as an extra precaution,
Vulcan
covered
and sealed
in two layers of 6-mil polyurethane sheeting (“poly sheeting”)
everything inside the barricade, including any scaffold components such as floor planks, walls, and handrails. (Tr. 52-54 ,
113-114).

Vulcan’s use of the poly sheeting to cover everything essentially created a box of poly sheeting in which Vulcan’s workers performed the abatement work during each shift. ( Id. ) In addition to the box it created at the level on which it was performing abatement work, Vulcan also used the poly sheeting to cover each level of the scaffolding planks, from the regulated area 5
all the way down to the bottom of the scaffolding. (Tr.
120).

In the
third step,
Vulcan
attached
and sealed
the high-temperature glove bags to the specific areas of piping on which
its workers
would be working within the contained work area,
which permitted Vulcan’s workers to remove asbestos-containing material insulation from two to three feet of piping at a time. (Tr.
50-51, 108). All
the necessary tools were
also
contained within the glove bags. (Tr.
123- 124).

In
the fourth step,
all
the actual removal activity
was done inside of sealed bags. (Tr.
122-124). The glove bags also contained air-tight disposal bags, so that
the asbestos-containing material
would drop into the disposal bag, which was sealed before the glove bag was removed from the piping. ( Id. )

There was no opening to the outside air during removal of the debris bags from the glove bags or of the glove bags themselves.
( Id. )

Additionally, before removing the glove bags from the piping or taking away any debris bags, Vulcan’s workers HEPA-vacuumed the inside of the glove bags and the pipe itself to ensure that all debris—no matter how small—was trapped and contained as required. ( Id. )

At t he fifth and final step, when Vulcan’s work was finished at the end of each shift, Vulcan’s workers deregulate d
the work area they had created at the beginning of the shift on each level of scaffolding. ( Tr.
129- 130). This involved unsealing and removing any remaining glove bags, HEPA vacuuming the regulated work area and the materials used therein, as Vulcan’s workers finished with each area. ( Tr.
125-126, 129-130). It also involved folding, double-wrapping, sealing, and HEPA-vacuuming the poly material.
(Id.)
The wrapped and sealed material
with
the
asbestos-containing material
was
then
lowered—not dropped—to the floor below for disposal. ( Tr.
126).
The result
was that Vulcan’s controls and practices prevented any
asbestos-containing material
that might have somehow gotten outside the glove bag from escaping outside
of the
regulated area that Vulcan created and worked in on any given day. ( Tr.
56).

On October 2, 2015,
an OSHA
inspection was conducted by Alpha Davis, an OSHA Compliance Safety and Health Officer,
at the
Gorgas
Plant, after
OSHA’s
Birmingham Area office received a complaint alleging the glove bags used by Vulcan were not adequate to contain and prevent the asbestos-containing material from migrating into the adjacent work area, allegedly exposing subcontractors working in the area of Unit 10 on the tenth floor of the facility (Tr. 13, 14) OSHA
focused its inspection on Unit 10, where Vulcan had been performing work.

As of October 2, Vulcan had removed and abated all but a very small section of the insulation with asbestos-containing material that was included within its scope of work at Unit 10. (Tr.
69).

On the day of the inspection,
Vulcan had not performed any work on Unit 10 since it cleaned up its work area and deregulated the area in which it had been working at approximately 5:00 p.m.
the day before. (Tr.
76).

Between the conclusion of Vulcan’s work on October 1 and the
inspection on October 2, another contractor performed a full power wash-down of Unit 10. (Tr.
76-82).

Vulcan had no employees performing any removal of asbestos-containing material during this period. The wash-down was not within the scope of Vulcan’s work in Unit 10.
( Id. )

The wash-down involved using a two-inch, high-pressure fire hose to spray the boiler, the boiler piping, and other boiler equipment also covered with thermal insulation with asbestos-containing material.
(Tr. 76-82).

A water nozzle was hooked to the hose, making the spray so strong that laborers performing the wash-down had to hold the nozzle over their shoulder and wrap the hose around their legs to control it and prevent it from whipping away.
( Id. )

The wash-down was performed on the boiler,
all
the piping around the boiler, and the floor below it, starting from the roof to the basement of Unit 10.
( Id. )

Not surprisingly, such wash-downs generate debris. Since the
boiler piping
and other boiler equipment
being washed down
was
covered with thermal insulation with asbestos-containing material, the Court finds the
preponderance
of evidence shows the wash down debris
included
asbestos-containing material.

Further, the area was opened to other contractors, as well as Alabama Power, the entire evening of October 1
and in the hours prior to the inspection on October 2. (Tr. 89, 107).

Thus, any debris generated in the area during that timeframe—i.e., from when Vulcan stopped work on October 1 and was no longer in control of the area after it had deregulated it—to when the OSHA inspection began on October 2—was not from Vulcan’s work. (Tr. 89).

On the morning of the
inspection, Vulcan’s work was delayed because the Unit 10 boiler had been taken offline during the night of October 1. (Tr. 76, 80).
Davis admitted there was no asbestos removal or clean-up
work occurring when she arrived
at the
Gorgas
Plant (Tr. 22). Therefore, Davis never identified any alleged deficiencies in the specific controls and practices that Vulcan indisputably employed while performing its abatement work in Unit 10 of the
Gorgas
Plant. (Tr. 20, 26).

Upon
her
arrival at the Gorgas Plant,
Davis observed the scaffold that the crew had used
the day before
and noticed
a small piece of debris that was embedded on one of the planks at one of the lower levels of the scaffolding
(Tr. 13-14, 18). Davis, along with George Rittenhouse, collected three bulk samples,
which were split between Vulcan and Davis (Tr. 13-14, Comp. Ex. 2). Davis sent the three bulk samples to the laboratory for testing (Tr. 19). The lab reported that
one sample labeled VI-2 was identified as 10% amosite, which is an asbestos-containing material (Tr. 19).

III. ANALYSIS

The fundamental objective of the Act is to prevent occupational deaths and serious injuries.
Whirlpool Corp. v. Marshall , 445 U.S. 1, 11 (1980). To achieve this purpose, the Act imposes two duties on an employer: a “general duty” to provide to “each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees,” 29 U.S.C. § 654(a)(1) ,
and a specific duty to comply with all applicable occupational safety and health standards promulgated under the Act.
29 U.S.C.
§ 654(a)(2). Pursuant to that authority the Secretary promulgated the
standard at issue in this case.
However, “[a]s has often been said, OSHA does not impose strict liability on an employer but rather focuses liability where the harm can in fact be prevented.”
Central of Ga. R.R. Co. v. Occupational Safety & Health Review Comm'n , 576 F.2d 620, 623 (5th Cir.
1978). 6

Under the law of the Eleventh Circuit, the jurisdiction in which this case arose, 7
the Secretary will make out a prima facie case for the violation of an OSHA standard by showing “(1) that the regulation applied; (2) that it was violated; (3) that an employee was exposed to the hazard that was created; and importantly, (4) that the employer “knowingly disregarded” the Act's requirements.”
Quinlan v. Sec'y, U.S. Dep't of Labor , 812 F.3d 832, 836 (11th Cir. 2016) ( citing ComTran Grp., Inc. v. U.S. Dep't of Labor , 722 F.3d 1304, 1307 (11th Cir. 2013));
Florida Lemark Corp. v. Sec'y, U.S. Dep't of Labor , 634 F. App'x 681, 685 (11th Cir. 2015);
Eller-Ito Stevedoring Co., LLC v. Sec'y of Labor , 567 F. App'x 801, 803 (11th Cir. 2014). “If the Secretary establishes a prima facie case with respect to all four elements, the employer may then come forward and assert the affirmative defense of unpreventable or unforeseeable employee misconduct.”
Eller-Ito Stevedoring , 567 F. App'x 803 ( citing
ComTran Grp. , 722 F.3d 1308).

Alleged Violation

The
citation alleges
Vulcan committed a serious violation of
OSHA’s Asbestos
s tandard
when “asbestos containing debris was identified on a scaffold after a removal activity had been completed.”
(Compl., Ex. A.)
The cited provision
of th at s tandard
mandates that employers engaged
in asbestos abatement work use shall use the enumerated “ engineering controls and work practices in all operations covered by this section, regardless of the levels of exposure[,]” including “[p]rompt clean-up and disposal of wastes and debris contaminated with asbestos in leak-tight containers
except in roofing operations[ . ] ” 29 CFR §1926.1101(g)(1)(iii).

Applica bility
of Standard

The Asbestos s tandard regulates asbestos exposure in all work as defined in 29 CFR 1910.12(b), including bu t not limited to the following:

(1) Demolition or salvage of structures where asbestos is present;

(2) Removal or encapsulation of materials containing asbestos;

(3) Construction, alteration, repair, maintenance, or renovation of structures, substrates, or portions thereof, that contain asbestos;

(4) Installation of products containing asbestos;

(5) Asbestos spill/emergency cleanup; and

(6) Transportation, disposal, storage, containment of and housekeeping activities involving asbestos or products containing asbestos, on the site or location at which construction activities are performed.

29 CFR §1926.1101( a ). Vulcan does not dispute the applicability of the standard, which the Court concludes applie s
to the cited conditions.

Alleged
Violation
of Standard

Although one o f the samples taken during the i nspection tested positive for asbestos, th at
sample came from a small piece of debris that was embedded on one of the planks at one of the lower levels of the scaffolding , which had
been
covered and sealed in two layers of 6-mil
poly sheeting
while Vulcan was performing its
asbestos abatement work at the Gorgas Plant .
However,
during the periods when Vulcan was not performing its asbestos abatement work, the
planks were
uncovered
and used by
other contractors
at the Gorgas Plant , including during the wash-down on the evening of October 1 and in the hours leading up to the
i nspection
on October 2 . Therefore, the Secretary has failed to establish
by a preponderance of evidence
that
the sample
with the asbestos-containing material came
from Vulcan’s asbestos abatement work. Th us, the Secretary has failed to prove by a preponderance of evidence that
Vulcan
was the employer that
violated the cited standard.

E xposure to Hazard

“The Secretary always bears the burden of proving employee exposure to the violative conditions.”
Fabricated Metal Products, Inc. , 18 BNA OSHC 1072, 1074 (No. 93-1853, 1997) (citations and footnotes omitted). The Commission’s longstanding “reasonably predictable” test for hazard exposure requires the Secretary to “show that it is reasonably predictable either by operational necessity or otherwise (including inadvertence), that employees have been, are, or will be in the zone of danger.”
Delek Ref., Ltd ., 25 BNA OSHC 1365, 1376 (No. 08-1386, 2015) ( citing Fabricated Metal Prods., Inc. , 18 BNA OSHC 1072, 1074 (No. 93-1853, 1997)). See also
Rockwell Intl. Corp. , 9 BNA OSHC 1092 (No. 12470, 1980);
Gilles & Cotting , 3 BNA OSHC 2002 (No. 504, 1976).

The zone of danger is the “area surrounding the violative condition that presents the danger to employees.”
Boh Bros. Constr. Co., LLC , 24 BNA OSHC 1067, 1085 (No. 09-1072, 2013) ( citing RGM Constr. Co. , 17 BNA OSHC 1229, 1234 (No. 91-2107, 1995)).

As the Commission noted in
Gilles & Cotting , 3 BNA OSHC at 2003, the scope of the zone of danger is relative to the wording of the standard and the nature of the hazard at issue.

Here, the zone of danger presented was the
exposure to
the asbestos-containing material, which is undisputed . Further,
Vulcan’s work crew assigned by Vulcan to remove the asbestos as well
as
other trades were exposed to the
asbestos-containing material .
Therefore, the Secretary has established employee ex posure to the cited conditions.

Alleged K nowledge of Violation

“The knowledge element of the prima facie case can be shown in one of two ways.”
Eller-Ito Stevedoring Co., LLC v. Sec'y of Labor , 567 F. App'x 801, 803 (11th Cir. 2014) (citing
ComTran
at 1307). “First, where the Secretary shows that a supervisor had either actual or constructive knowledge of the violation, such knowledge is generally imputed to the employer.”
Id.
(citing
ComTran
at 1307–08).

“In the alternative, the Secretary can show knowledge based upon the employer's failure to implement an adequate safety program, with the rationale being that—in the absence of such a program—the misconduct was reasonably foreseeable.”
Id.
at 803-04 (citing
ComTran
at 1308).

Here,
the Secretary has failed to establish
that a
Vulcan
supervisor had either actual or constructive knowledge of the violation
and failed to establish
that
Vulcan
implement ed
an
in adequate safety program . The Secretary argues with the exercise of reasonable diligence, Vulcan could have known that
asbestos-containing
debris was not being properly contained
since t he debris found by Davis in the work area was in plain sight . However, the Secretary failed to offer any evidence that the asbestos-containing material was in plain site after Vulcan deregulated its area of the worksite. To the contrary, the preponderance of evidence shows the asbestos-containing material resulted from the power washing that occurred after Vulcan deregulated the area and left the worksite. Therefore, the Secretary has failed to establish knowledge
of the violation .

Thus, the Court concludes the
Secretary
failed to m ake out a prima facie case for the violation of
the cited st an dard since he failed to show the cited standard was violated by
Vulcan
and failed to prove Vulcan
knowingly disregarded the Act's requirements.
Quinlan v. Sec'y, U.S. Dep't of Labor , 812 F.3d 832, 836 . Accordingly,

I V. ORDER

IT IS HEREBY ORDERED THAT
the citation is
VACATED
a nd no
civil penalt y is imposed .

SO ORDERED .

/s/            

JOHN B. GATTO, Judge

Dated: March 7, 2017

Atlanta, GA

"

1
The Secretary of Labor
(Secretary)
delegated his authority under the Act to the Assistant Secretary of Labor for Occupational Safety and Health, who heads OSHA, and assigned responsibility for enforcement of the
Act
to OSHA.
See
65 Fed.Reg. 50017 (2000). The Assistant Secretary has promulgated occupational safety and health standards,
see e.g. , 29 C.F.R. Parts 1910 and 1926, and has redelegated his authority to OSHA’s Area Directors to issue citations and proposed penalties to enforce the Act.
See
29 C.F.R. §§ 1903.14(a) and 1903.15(a).

2
Under section 17 of the Act, violations are characterized as “willful,” “repeated,” “serious,” or “not to be of a serious nature” (referred to by the Commission as “other-than-serious”). 29 U.S.C. §§666(a), (b), (c). A serious violation is defined in the statute; the other two degrees are not.
Id.
§666(k) .

3
Attached to the complaint
and
adopted by reference were the two citations at issue .
Commission Rule 30(d) provides that “[s] tatements in a pleading may be adopted by reference in a different part of the same pleading or in another pleading or in any motion. A copy of any written instrument which is an exhibit to a pleading is a part thereof for all purposes.”
29 C.F.R §2200.30(d).

4
Rittenhouse was employed by Safety Environmental Laboratories and Consultants and was hired by Vulcan to conduct industrial hygiene consulting in
the area of asbestos (Tr. 116).

5
“ Regulated area   means: an area established by the employer to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulate; and a work area within which airborne concentrations of asbestos, exceed or there is a reasonable possibility they may exceed
the permissible exposure limit . ”
29 CFR §1926.1101 (b) .

6
The United States Court of Appeals for the
Eleventh
Circuit
was established on October 1, 1981 pursuant to the Fifth Circuit Court of Appeals Reorganization Act of 1980, P.L. 96-452, 94 Stat. 1995, when the United States Court of Appeals for the Fifth Circuit was divided into two circuits, the Eleventh and the Fifth. Immediately after the split, the
Eleventh
Circuit
held in
Bonner v. City of Prichard, Alabama
that any
opinion
issued by the
Fifth
Circuit
“as that court existed on September 30, 1981, handed down by that court prior to the close of business on that date, shall be binding as precedent in the Eleventh Circuit[.]”
Bonner v. City of Prichard, Ala. , 661 F.2d 1206, 1207 (11th Cir. 1981). Therefore,
Central of Ga. R.R. Co.
is binding as precedent in the Eleventh Circuit.

7
Under the Act, an employer may seek review in the court of appeals in the circuit in which the violation occurred, the circuit in which the employer’s principal office is located, or the District of Columbia Circuit. 29 U.S.C. § 660(a). The Secretary may seek review in the circuit in which the violation occurred or in which the employer has its principal office. 29 U.S.C. § 660(b). This case arose in
Alabama , which is in the Eleventh Circuit. In general, where it is highly probable that a Commission decision would be appealed to a particular circuit, the Commission has applied the precedent of that circuit in deciding the case, “even though it may differ from the Commission’s precedent.”
Kerns Bros. Tree Serv. , 18 BNA OSHC 2064, 2067 (No. 96-1719, 2000). The Court therefore applies the precedent of the Eleventh Circuit in deciding the case, where it is highly probable that a Commission decision would be appealed to.

Get today's answer for your situation

You just read what one judge decided for one employer in 2017, and it binds only those parties. Ezel checks the current OSHA standards and Commission precedent and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.