Daisy Construction Company
Willful trench violations affirmed
Apply this to your situation
This order from 2012 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current OSHA standards and Commission precedent, with citations.
Plain-English summary
Daisy Construction was installing underground conduit during a road project when employees worked for hours in a trench more than seven feet deep with vertical walls and no cave-in protection. The foreman and the acting superintendent both saw the work, knew trench protection was required, and did not stop it, even though a trench box was nearby. The judge rejected Daisy's unpreventable employee misconduct defense because the company had not adequately communicated, monitored, or enforced its trench safety rules. A prior citation for the same cave-in standard at the same project, together with the supervisors' training and experience, supported the willful classification. The judge affirmed one serious training violation and two grouped willful trench violations, reducing the proposed penalties to $59,000 total.
Decision snapshot
- Cited standard(s): 29 C.F.R. § 1926.21(b)(2); 29 C.F.R. § 1926.651(k)(2); 29 C.F.R. § 1926.652(a)(1)
- Outcome: One serious training item and two grouped willful cave-in-protection items were affirmed, with penalties reduced to $59,000 total.
- Key point: Supervisory participation in an open trench hazard, combined with a prior citation and weak enforcement of safety rules, supported willfulness and defeated the employee misconduct defense.
Full text (OSHRC public release)
United States of America
OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION
1120 20th Street, N.W., Ninth Floor
Washington, D.C. 20036-3457
SECRETARY OF LABOR,
Complainant,
v. OSHRC Docket No. 10-2248
DAISY CONSTRUCTION COMPANY,
Respondent.
APPEARANCES:
John A. Nocito, Esquire, U.S. Department of Labor, Philadelphia, Pennsylvania
For the Complainant.
Edward Stepp, Director of Risk Management Services, Daisy Construction Company
Wilmington, Delaware
For the Respondent.
BEFORE: Dennis L. Phillips
Administrative Law Judge
DECISION AND ORDER
This proceeding is before the Occupational Safety and Health Review
Commission (“the Commission”) under section 10(c) of the Occupational Safety and
Health Act of 1970, 29 U.S.C. § 651, et seq. (“the Act”). The Occupational Safety and
Health Administration (“OSHA”) inspected a work site of Daisy Construction Company
(“Daisy” or “Respondent”) on April 29, 2010. The site was located in Dover, Delaware,
where Respondent was engaged in trenching work. The inspection resulted in Respondent
being issued one serious citation and one willful citation. Respondent contested the
citations and the proposed penalties. The hearing in this matter took place in Wilmington,
Delaware, on August 23, 2011. Both parties have filed post-hearing briefs. (Tr. 15-21;
JX-1, ¶¶ 13-14).
The OSHA Inspection
Respondent has been in business for about 39 years. It is a Delaware corporation,
and its corporate office is in Newport, Delaware. Its work involves highway and road
construction. Daisy owns more than 200 pieces of heavy construction equipment. The
project at issue, called the South Governors Avenue project (“the project”), involved a
2.25-mile-long area. Part of the project required installing PVC plastic conduit pipe
underground so that overhead cables could be replaced with underground cables. (Tr. 31-
32, 68, 106, 124, 178; CX-3, CX-4, p. 7, CX-6, p. 3, CX-8, p. 3).
On April 29, 2010, OSHA’s Area Director (“AD”) for the Wilmington office,
Domenick N. Salvatore, received a complaint about employees being in an unprotected
trench at the work site.1 The trench was located at South Governors Avenue and Dover
Street, Dover, Delaware (“work site” or “project site”). OSHA Compliance Officer
(“CO”) Lester Paul Kessler arrived at the project site at about 1:15 p.m. on April 29. He
saw an employee in the trench, which had no protection in it, and he photographed what
he saw.2 He observed another individual standing next to the edge of the trench. He
learned that person was Randy Drake, Daisy’s foreman and competent person at the site.3
The CO presented his credentials and asked Mr. Drake to have the employee exit the
trench. Mr. Drake did so, and the CO began his inspection. He measured the trench and
1
All dates in this decision will refer to the year 2010, unless otherwise indicated.
2
The CO’s photographs are CX-4, pp. 1-29.
3
A competent person is “one who is capable of identifying existing and predictable hazards in the
surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who
has authorization to take prompt corrective measures to eliminate them.” 29 C.F.R. § 1926.650(b).
found it to be about 23 feet long and 6.5 feet wide. Its walls were vertical. Its depth was 7
feet 3 inches at one end, 7 feet 4 inches at the other end, and 8 feet 1 inch in the middle.4
The CO considered the soil in the trench to be Class C, the least stable soil, as it was
previously disturbed soil.5 Daisy had previously excavated the soil to install water and
sewer lines. The trench was also located at a busy intersection, which could affect the
soil’s stability. There was a trench box a few feet away from the trench. Daisy had not
put the box in the trench that day. (Tr. 50-51, 68, 96-111, 145-49; JX-1, ¶ ¶ 3-6, CX-2,
CX-3, p. 1, CX-4, p. 18).
On April 29, CO Kessler interviewed Michael Moore, the Daisy employee who
had been in the trench, and Bill King, Daisy’s excavator operator. Mr. Moore said that he
had not attended any trenching training classes conducted by Daisy. Mr. Moore also said
that he had begun working in the trench that day at about 9:00 a.m.6 He told CO Kessler
that the trench was approximately 7 to 7 ½ feet deep. Mr. King said that he did not get
any training or classes, on trenching or other subjects, from Daisy. Mr. King stated that
the trench box had not been used due to a concern that it could have broken the sewer
main in the trench. The CO also interviewed Silvano DelSignore, Daisy’s general
superintendent at the site.7 Mr. DelSignore told him he had arrived at the site around
10:00 a.m., he was aware there was an employee in the trench, and he did not think the
trench was that deep. He said he had not used the trench box as he had feared it would
break the utility lines in the trench. Finally, the CO interviewed Mr. Drake, who stated
4
Respondent admits Messrs. DelSignore and Maruca knew that the trench was in excess of 5 feet in depth
and not in stable rock. (CX-10, p. 3; JX-1, ¶¶ 4, 10).
5
CO Kessler stated that Class C soil is a sandy type of granulated soil that does not hold together because it
lacks clay composites. (Tr. 100, 103; CX-4, p. 3).
6
According to Mr. Moore, the trench box was not used as it was “a pain in the butt.” (Tr. 113-14; CX-11).
7
Mr. DelSignore was evidently not present when the CO first arrived at the site. (Tr. 134-35, 194-97).
that Mr. DelSignore had been at the site and knew the employee was in the trench.8 Mr.
Drake also stated that Mr. DelSignore had been at the trench site on and off throughout
the day.9 (Tr. 41, 111-18, 136; CX-3, CX-11, CX-12).
As a result of the inspection, Daisy was cited for a serious violation of 29 C.F.R. §
1926.21(b)(2), for failing to instruct employees in the recognition and avoidance of
unsafe conditions relating to trenching and excavation work. It was cited for a willful
violation of 29 C.F.R. § 1926.652(a)(1), for allowing an employee to work in an
unprotected trench. It was also cited for a willful violation of 29 C.F.R. § 1926.651(k)(2),
as the competent person had permitted employees to work in an unprotected trench.
Jurisdiction
The parties have stipulated that Respondent is an employer with employees that is
engaged in a business affecting commerce within the meaning of sections 3(3) and 3(5)
of the Act, 29 U.S.C. §§ 652(3) and (5). The parties have also stipulated that the
Commission has jurisdiction of this proceeding under section 10(c) of the Act, 29 U.S.C.
§ 651, et seq. (Tr. 15-16, 20; JX-I, ¶¶ 1-2, 24-25). The Court finds, therefore, that the
Commission has jurisdiction of the parties and the subject matter of this proceeding.
8
At the hearing, Mr. Drake testified that the excavation for the conduit had to be backhoed before the night
of April 29. He also testified that the project manager, Sam [Maruca], visited the work site in the morning
and told him to get the work done before he came back or the state inspector saw them there. (Tr. 77-78;
CX-3, p. 9, CX-8, p. 3).
9
Later, CO Kessler also interviewed Messrs. Cannon and David Brian Detterbeck, as well as Mr. Drake for
a second time. Mr. Detterbeck was a cable splicer with Cable Construction Group that had a contract with
Comcast to perform the same type of inspection that Mr. Cannon performed for Verizon. He testified at the
hearing that while at the work site at about 12:30 p.m., April 29, he saw Mr. Moore in the trench where
there was no protection. He also said that he had seen Daisy employees working in other unshored trenches
that were deeper than 5 feet. (Tr. 123, 141-43). Mr. Cannon told the CO that Mr. Moore was responsible
for measuring each vault at the work site to determine how deep to dig the trench. (CX-3, p. 6).
The Secretary’s Burden of Proof
To prove a violation of an OSHA standard, the Secretary must demonstrate that:
(1) the standard applies, (2) its terms were not met, (3) employees were exposed to the
violative condition, and (4) the employer either knew of the condition or could have
known of it with the exercise of reasonable diligence. Astra Pharm. Prod., 9 BNA OSHC
2126, 2129 (No. 78-6247, 1981), aff’d in relevant part, 681 F.2d 69 (1st Cir. 1982).
Willful Citation 2, Items 1a and 1b
Willful Item 1a alleges a violation of 29 C.F.R. § 1926.652(a)(1). That standard
states as follows:
Each employee in an excavation shall be protected from cave-ins by an
adequate protective system designed in accordance with paragraph (b) or
(c) of this section except when:
(i) Excavations are made entirely in stable rock; or
(ii) Excavations are less than 5 feet (1.52m) in depth and examination of
the ground by a competent person provides no indication of a potential
cave-in.
The parties have stipulated that the cited standard applies and that its terms were
not met. The parties have further stipulated that the exceptions to the cited standard do
not apply in this case. That is, exceptions (i) and (ii) above do not apply here because the
excavation was not made entirely in stable rock and it was greater than 5 feet in depth.
Finally, the parties have stipulated that Respondent is not contending that a protective
system in compliance with 29 C.F.R. §§ 1926.652(b) or (c) was being used at the site on
the day of the OSHA inspection. (Tr. 19; JX-I, ¶¶ 16-20, 26).
Willful Item 1b alleges a violation of 29 C.F.R. § 1926.651(k)(2). That standard
provides, in relevant part, that:
Where the competent person finds evidence of a situation that could result
in a possible cave-in … exposed employees shall be removed from the
hazardous area until the necessary precautions have been taken to ensure
their safety.
The parties have stipulated that the cited standard applies and that its terms were
not met. (Tr. 19-20; JX-I, ¶¶ 21-22, 26).
The parties’ stipulations further establish the third and fourth elements of the
Secretary’s burden of proof as to Items 1a and 1b, i.e., employee exposure to the cited
condition and employer knowledge of the condition. In those stipulations, Daisy has
admitted that two supervisors knew that employees were working in the trench without
any cave-in protection in place.10 (Tr. 16-17; JX-I, ¶¶ 5-10). Daisy asserts, however, that
Mr. Drake was the person responsible for the violations, noting the testimony of Mr.
DelSignore. (R. Brief, pp. 8-9). Mr. DelSignore testified he went to the site between 9
a.m. and 10 a.m. on April 29, saw employees in the trench without a trench box, and got a
ladder and had the employees exit the trench.11 Mr. Drake had gone to get a ladder
himself, and when he returned, Mr. DelSignore allegedly told Mr. Drake to put the trench
box in the trench before letting any employees go back in. Mr. DelSignore also testified
he left before ensuring the box was put in, as he had to check on other areas of the project
as well as another project. He did not return to the trench site until that afternoon, after he
got a call about OSHA being there. (Tr. 210-17, 222-23, 226).
It is clear from the above that Mr. DelSignore’s testimony was not consistent with
the statements he made to the CO at the time of the inspection. It was also not consistent
with Mr. Drake’s testimony. The Court observed the demeanor of these three witnesses
10
The CO’s testimony and photographs also demonstrate employee exposure and supervisory knowledge
of the condition. When the CO arrived at the site, Mr. Drake was standing near the edge of the trench and
was watching as Mr. Moore worked in the unprotected trench. (Tr. 97-98, 101-05; CX-4, pp. 2-4, 6-7).
11
Mr. DelSignore stated he went to the trench site because he got a call from a “Sam Laroughe” telling him
there were employees in a trench without a trench box. (Tr. 210).
as they testified, including their facial expressions and body language, and found the CO
to be a credible and convincing witness. Mr. Drake was also a credible witness, for the
most part, and his testimony was largely consistent with what he told the CO during the
inspection. Mr. DelSignore, on the other hand, was not a reliable witness in significant
respects. Besides the foregoing, he testified that he did not tell the CO he had gotten the
employees out of the trench that morning because he “didn’t know [he] needed to.” (Tr.
212). He further testified that he had signed the CO’s “form” as the CO said he would
have him “arrested” if he did not. (Tr. 213). He agreed that instead of staying to ensure
the trench box was installed, he “walked away” from the situation. (Tr. 216). He also
agreed that it “look[ed] like” Mr. Drake did not follow his instructions, even though Mr.
Drake knew he could have been fired for insubordination. (Tr. 223, 226). Based on the
Court’s credibility determinations and the noted testimony, the Court will credit the
testimony of the CO and Mr. Drake over that of Mr. DelSignore.12
According to Mr. Drake, Daisy began digging the trench at about 8:00 a.m. on
April 29. Mr. DelSignore was there for at least part of the digging work. Around 9:00
a.m., Mr. DelSignore told Mr. Drake to get a trench box, and Mr. Drake did so. Mr.
12
Another reason for crediting Mr. Drake’s testimony is that it was corroborated in significant part by
another witness, Michael Cannon. Mr. Cannon, the general foreman for Danella Line Service, was at the
trench site that day to inspect the conduit placement for Verizon. He saw Respondent’s employees,
including laborer Mr. Moore, digging in the trench without any cave-in protection with Messrs. DelSignore
and Drake standing nearby about 9:30 a.m. for 15 to 20 minutes. Mr. Cannon testified that he observed
some rock and dirt flowing into the excavation. He stated that Respondent should have used a trench box
sitting about 5 feet away because of the excavation’s depth and the unstable situation. He was concerned
that a telephone pole with overhead power lines being held up by a Dover Electric utility truck adjacent to
the excavation might slide into the hole. He was also concerned that the vibration from the traffic and
heavy machinery on the adjacent roadway could affect the excavation. Mr. Cannon also testified that his
supervisor, Chris Strobel, visited the work site on April 29 and the two of them discussed their observations
of Respondent’s employees working in an unprotected trench. After departing the work site, Mr. Strobel
called Mr. Cannon and told him to expect a “visitor” at the work site. Mr. Cannon stated that CO Kessler
showed up at the work site between 1:00 p.m. and 2:00 p.m. and that Respondent’s employees worked in
the unprotected trench throughout the morning beforehand. He also stated that he later learned that Mr.
Strobel had called OSHA. (Tr. 29-63, 101, 105; JX-1, ¶ 9, CX-4. pp. 1, 6-8).
Drake then went to get a ladder. When he returned, employees were in the trench, Mr.
DelSignore was standing nearby, and the trench box was not being used.13 Mr. Drake said
that Mr. DelSignore did not order the employees out or tell him to do so, and he did not
tell him to use the trench box. He also said that if Mr. DelSignore had told him to use the
box, he would have, as Mr. DelSignore was his supervisor that day and the “big boss.”14
He stated that employees were in the trench for about three hours total; Mr. DelSignore
was there “off and on” during that time. He further stated that there should have been
protection in the trench but that the trench box could not be used.15 Mr. Drake testified
that Respondent did not use any protection in the trench because he and “Everybody
wanted to get it [the job] done.”16 (Tr. 68-79, 82; CX-3).
Another aspect of Mr. DelSignore’s testimony must be examined. Mr. DelSignore
has been with Daisy for 30 years. He has been the operations manager for four to five
years and before then was a superintendent. He testified that on April 29 he was replacing
Dathan Booth, the project superintendent assigned to the subject project.17 He further
testified that on April 29, he had to check on that project and another project. He also had
to attend to his operations manager duties. Mr. DelSignore stated that as the general
superintendent that day, he was responsible for checking on projects that had either a
superintendent or a foreman. A project superintendent is responsible only for the specific
project to which he is assigned. Mr. DelSignore said that many projects have only a
13
Mr. Drake said that the employees had gotten a ladder to use before he got back. (Tr. 71-74).
14
Mr. Drake testified that he thought Mr. DelSignore was the general superintendent, but others referred to
him as project manager. He stated that Mr. DelSignore reported to the company’s owner and President,
Leonard Iacono. (Tr. 69, 197-98; CX-8, p. 3).
15
Mr. Drake testified the box was too wide and the trench could not be widened to accommodate it; there
were also utilities in the way. (Tr. 74-75, 78). Despite this testimony, the box was put in the trench while
the CO was there. (Tr. 109-11, 214-15). Photographs also show the box in the trench. (CX-4, pp. 27-29).
16
When interviewed, Mr. Drake told the CO that he wanted to get the job done so that he could let Dover
Electric Company release the telephone pole that it was holding. (CX-3, p. 8).
17
Mr. Booth was absent on April 29 due to a family emergency. (Tr. 191-92).
foreman and do not have a superintendent. He also said he was not that familiar with the
subject project and did not know how deep the cited trench was. He noted that the
foreman at a job site is in “direct charge of the day-to-day operations,” including safety.
He agreed, however, that a superintendent has overall, day-to-day responsibility for
safety. If a superintendent sees an unsafe condition or practice, he has a duty to correct it.
According to Mr. DelSignore, he was a competent person in trench safety, he had OSHA
training, and he was familiar with Daisy’s safety manual, which covers trenching and
references the OSHA standard. (Tr. 79-80, 116, 176-77, 191-200, 206-08, 216-26).
Daisy notes that Mr. Drake, as the foreman, was directly responsible for safety at
the work site. It suggests Mr. DelSignore did not have the same level of responsibility,
due to the brief period he was at the trench site, his other duties on April 29, and the fact
he was part of Daisy’s administrative staff. (R. Brief, pp. 8-9). The Court disagrees. Mr.
DelSignore testified that a superintendent, upon seeing an unsafe condition or practice,
has a duty to correct it.18 (Tr. 199-200). And Mr. Drake testified that Mr. DelSignore was
his supervisor that day and the “big boss” and that if he had told him to use the trench
box he would have done so.19 (Tr. 68-69, 76). Further, Mr. Booth testified that when he
was out of town, Mr. DelSignore replaced him. Mr. Booth agreed that Mr. DelSignore
18
Respondent’s manual outlining staff responsibilities states as follows:
The superintendents have overall day-to-day responsibility for safe, efficient operations on all
projects. Their safety responsibilities include, but not limited to:
· Analyze job specifications and the project site for possible safety hazards, and with the assistance
of the safety director, they will pre-plan each job to eliminate recognized safety hazards.…
· Inspect each job for unsafe practices and conditions. Correct any unsafe practices or conditions
and explain the reason for the correction.
(Tr. 183-86, 190, 199-200; CX-8, pp. 8, 12, RX-B).
19
Mr. Cannon also testified Mr. DelSignore was Mr. Drake’s supervisor at the work site on April 29. (Tr.
41).
was the project superintendent on April 29 and thus would have had overall responsibility
for safety on the project.20 (Tr. 181-88). Based on the record, the Court finds that Messrs.
DelSignore and Drake were both responsible for safety at the site, that both were aware
by direct observation that employees were working in the unprotected trench, and that
neither took the necessary safety measures to protect the employees from a cave-in.21
Whether the Violations were due to Unpreventable Employee Misconduct
Daisy contends that all of the violations in this case were due to the unpreventable
employee misconduct of Mr. Drake, the foreman at the site. (R. Brief, pp. 3-6). The Third
Circuit, where this case arose, has noted with approval the Commission’s test for proving
unpreventable employee misconduct, i.e.:
(1) the employer had established rules designed to prevent the violation;
(2) it adequately communicated the rules;
(3) it took steps to discover violations of the rules; and
(4) it enforced the rules when violations were discovered.
Pa. Power & Light Co. v. OSHRC, 737 F.2d 350, 358 (3d Cir. 1984)(“PP&L”). In PP&L,
the Third Circuit held that the Secretary may not shift to the employer ultimate risks of
nonpersuasion where the inference of an employer’s knowledge of conduct violating the
Act is raised only by supervisory misconduct.22 In so holding, the Third Circuit stated:
20
Whether Mr. DelSignore on April 29 was a general superintendent, as he stated, or the project
superintendent, as Mr. Booth stated, he was responsible for employee safety at the trench site. Mr.
DelSignore admitted superintendents have overall and day-to-day responsibility for safety. (Tr. 198-99).
21
In light of Mr. Drake’s testimony, the Court specifically finds that Mr. DelSignore had the employees
enter the trench while Mr. Drake was looking for a ladder. (Tr. 71-74).
22
The parties have stipulated that Daisy has the burden of proving unpreventable employee misconduct on
the part of Mr. Drake. (Tr. 20; JX-I, ¶ 23). Generally, courts are not bound by stipulations pertaining to
questions of law. See Mintze v. Am. Gen. Fin. Serv., Inc., 434 F.3d 222, 228 (3d Cir. 2006) (“[Court] not
bound by the parties’ stipulations concerning questions of law”). This stipulation of law by the parties is
inconsequential since the Court finds that there is insufficient evidence to support any unpreventable
employee misconduct defense. The Secretary prevails in this matter regardless of which party has the
burden of proof concerning unpreventable employee misconduct. The Court finds that the evidence shows
that Daisy failed to exercise reasonable care to prevent the violations at issue because of inadequacies in its
safety precautions, training of employees, and supervision. See PP&L, 737 F.2d. at 358. The Court also
In cases where the Secretary proves that a company supervisor had
knowledge of, or participated in, conduct violating the Act, we do not
quarrel with the logic of requiring the company to come forward with
some evidence that it has undertaken reasonable safety precautions….We
do hold, however, that the Secretary may not shift to the employer the
ultimate risk of non-persuasion in a case where the inference of employer
knowledge is raised only by proof of a supervisor’s misconduct. The
participation of the company’s own supervisory personnel may be
evidence that an employer could have foreseen and prevented a violation
through the exercise of reasonable diligence, but it will not, standing
along, end the inquiry into foreseeability.
737 F.2d at 357-58.
In this case, the Secretary has clearly shown that two Daisy supervisors knew of
the trenching violation and did nothing to correct it.23 In fact, it was Mr. DelSignore, Mr.
Drake’s superior, who had the employees enter the unprotected trench to begin working
while Mr. Drake was searching for a ladder. In light of this evidence, and consistent with
the Third Circuit’s holding above, the Court will examine the evidence to see whether it
shows that Daisy had undertaken reasonable safety precautions.
The record shows that Mr. Drake has worked in construction for 30 years. He had
been with Daisy about a year and a half at the time of the inspection. Mr. Drake received
Daisy’s safety manual when he began working for the company, but no one asked him if
he had read it or understood it. Daisy sent Mr. Drake to a safety course that addressed
excavation, trenching and soil mechanics on February 25, 2010. It also sent him to a 10-
hour OSHA course in construction safety and health on March 25, 2010. Mr. Drake went
to a Daisy supervisors’ meeting held on April 3, 2010. The supervisors’ meetings usually
include discussions of safety and policy procedures. (Tr. 65-67, 82-84, 194; RX-F).
notes that Daisy had the opportunity and motivation to present evidence in support of its unpreventable
employee misconduct defense in light of its stipulation.
23
Mr. DelSignore admitted he knew there was an unsafe condition at the work site. He also agreed a trench
box should have been used in the trench. (Tr. 216, 221-22; CX-8, p. 4). Daisy also admitted that Mr. Drake
knew that the trench’s depth and condition required a protective system. (JX-1, ¶ ¶ 7-9, CX-10, p. 3).
The record also shows that on May 3, 2010, Daisy sent Mr. Drake a notice that
advised him that he was suspended pending the company’s internal investigation of the
circumstances at the subject site. It also advised him that the failure to provide workers
with adequate protection in the trench violated section H of Daisy’s safety policy, which
covers trenching and excavations. On May 10, 2010, Daisy sent Mr. Drake another notice
informing him that it was terminating his employment. The notice stated that in spite of
the training he had received, Mr. Drake had “blatantly disregarded” worker safety by not
providing a protective shoring system in the trench.24 Before he was fired by Daisy, Mr.
Drake went back to work for his previous employer, where he had worked for 15 years.
(Tr. 65, 80-81; RX-A).
Section H of Daisy’s safety manual addresses trenching and excavations. The
Secretary notes that Exhibit RX-C, p. H-2, includes a provision for protective systems in
trenches that references OSHA’s excavations standard and requires supervisors to refer to
the OSHA standard “for guidance to comply with this plan.” She thus concludes that
Daisy’s manual included work rules designed to prevent the trenching violation. (S.
Brief, p. 20).
As to Daisy’s communication of its rules, the foregoing describes the training Mr.
Drake received and the fact that he was given a copy of Daisy’s safety manual. Mr. Drake
testified, however, that no one asked him if he had read or understood the manual. (Tr.
66). Mr. DelSignore had also received OSHA training, and he was familiar with the
24
Daisy admits that Mr. Drake directed its employees to connect pipe in the trench without the protection
of a shoring system. (CX-10, p. 17). Mr. Drake admitted that Respondent could have shored, laid the ditch
back, or used a trench box to protect the employees in the trench. (Tr. 86-87; RX-C). Likewise, CO Kessler
testified that employers could use hydraulic shoring or sloping to protect their employees where a trench
box could not be used. (Tr. 111). The photographs at Exhibit CX-4, pp. 27-29, taken by CO Kessler at the
end of his inspection, show Daisy using a trench box in the excavation when backfilling. CO Kessler stated
that Daisy did not have to widen the trench before inserting the trench box into the excavation. (Tr. 109-
11).
safety manual. (Tr. 206-08). Messrs. Drake and DelSignore were competent persons in
trenching and excavations, and both had 30 years of experience in construction work. (Tr.
65-68, 82-84,191, 196-97, 206-08). Despite their training, experience and qualifications,
they allowed employees to work in the cited trench without any cave-in protection.
Daisy presented Exhibit RX-D, which contains copies of tool box safety talks
held at its job sites in April 2010. Mr. Drake testified that one-page topic sheets were
included in his paycheck envelopes. He indicated he led weekly tool box safety talks for
his crews at his work sites.25 (Tr. 66-67). Of the many documents in Exhibit RX-D, only
two represent that trenching safety was addressed. These two indicate that Mr. Stepp
gave a trenching safety talk at two sites at the subject project on April 2, 2010. Daisy
offered no evidence as to what specifically was covered in these talks. The CO testified
that tool box talks usually last only five to ten minutes. He further testified that while he
received copies of Daisy’s tool box talks during the inspection, the copies of the
trenching safety talks were not provided until later, during discovery.26 (Tr. 122, 137-40;
CX-3).
In addition to the above, the CO testified that when he interviewed them, Messrs.
Moore and King both said they had received no training from Daisy. (Tr. 112-14, 136;
GX-11-12). Mr. Moore, the employee in the trench when the CO arrived, clearly required
25
The first page of Exhibit RX-D appears to be a list of Daisy supervisors showing each date in April 2010
on which the specified supervisors gave tool box talks at their job sites. Mr. Drake’s name is on the list, but
there are no dates to indicate he gave tool box talks that month. There are also no documents in Exhibit
RX-D to show he gave any such talks that month.
26
Mr. King’s name does not appear on any Daisy training sign-in sheets and Mr. Stepp told the CO that
Daisy had no training records for Mr. King. (CX-3, p. 2, RX-D). There is no record of Mr. King receiving
any training at Daisy. (CX-7, p.8, CX-8, p. 6). In the absence of any such written record, the Court finds
that Daisy did not adequately instruct Mr. King in the recognition and avoidance of unsafe conditions and
the regulations applicable to his work environment to control or eliminate any hazards or other exposure to
illness or injury as of the date of OSHA’s inspection. See U.S. ex rel. Compton v. Midwest Specialties, Inc.,
142 F.3d 296, 303 (6th Cir. 1998) (the absence of a record of an event is probative of the fact that the event
did not occur); Wiley v. U. S., 20 F.3d 222, 227 (6th Cir. 1994) (same).
training in trenching safety. Mr. King, the excavator operator, also required such training,
in that his job at the site involved digging the trench. The Secretary points to all of the
foregoing in support of her assertion that Daisy did not adequately communicate its work
rules. She also points to the fact that Messrs. Drake and DelSignore, the competent
persons at the site, permitted employees to work in the unprotected trench. The Secretary
cites to circuit court precedent which has held that “negligent behavior by a supervisor or
foreman which results in dangerous risks to employees under his or her supervision …
raises an inference of lax enforcement and/or communication of the employer’s safety
policy.” Danis-Shook Joint Venture XXV, 319 F.3d 805, 811 (6th Cir. 2003).27 (S. Brief,
pp. 20-25). The Court agrees and finds that Daisy did not adequately communicate its
work rules in regard to trenching safety.28 See Complete Gen. Constr. Co., 20 BNA
OSHC 1412, 1416 (No. 02-1896, 2003), aff’d No. 03-4456, 2005 WL 712491 (6th Cir.
Mar. 29, 2005) (finding that employer was not entitled to employee misconduct defense
because it did not adequately communicate its trench safety program to its employees
where weekly tool box meetings did not sufficiently focus on trench safety rules and
employer did not ensure that employees actually read and understood the contents of the
safety manual); see also Schuler-Haas Elec. Corp., 21 BNA OSHC 1489 (No. 03-0322,
2006) (rejecting claim of employee misconduct due to inadequate communication of
27
Where the supervisor commits the violation, “the proof of unpreventable employee misconduct is more
rigorous and the defense is more difficult to establish since it is the supervisor’s duty to protect the safety of
employees under his supervision.” Archer-Western Contractors Ltd., 15 BNA OSHC 1013, 1017 (No. 87-
1067, 1991) (“A supervisor’s involvement in the misconduct is strong evidence that the employer’s safety
program was lax”). Here, Daisy failed to take feasible precautions to prevent the violations, including
adequate instruction and supervision of its supervisors. See CBI Serv., Inc., 19 BNA OSHC 1591, 1603
(No. 95-0489, 2001) (finding inadequate proof of unpreventable supervisory misconduct where employer
failed to establish it took feasible precautions, including adequate supervision of supervisor).
28
See Butch Thompson Enters., Inc., 22 BNA OSHC 1985, 1991-93 (No. 08-1273, 2009) (rejecting
employer’s supervisory misconduct defense in part because supervisors’ participation in violation was
evidence of poor communication and implementation of a safety program).
work rule where employer did not establish it provided hazard recognition training). (S.
Brief, p. 22).
As to whether Daisy took steps to discover violation of its rules, the Secretary
notes that Exhibit RX-C (section H of Daisy’s safety manual) includes a “Trenching
Inspection Checklist.” Exhibit RX-C requires the checklist to be completed at least daily.
(See RX-C, p. H-3). The checklist requires the foreman to document the trench’s
dimensions and to evaluate the soil type and the best protective system to use in the
trench. It also requires, inter alia, noting the presence of any hazardous conditions and
keeping spoil piles and equipment at least 2 feet from the edge of the trench. The
checklist must be signed by the competent person. A note at the bottom of the checklist
states as follows:
All unsafe conditions must be corrected prior to trench entry. If any
hazardous conditions are observed, the trench must be immediately
evacuated and no one allowed to re-enter until corrective action has been
taken.
The Secretary points out that there is no evidence that a checklist was
completed for the subject trench or, for that matter, that a checklist had ever been
completed for any of Daisy’s trench sites. Mr. DelSignore testified that he was not
aware that the checklist was required for trenching jobs. Further, despite his 30
years with Daisy, he admitted that he had never even seen the checklist until it was
shown to him at the hearing. (Tr. 208-09; RX-C; S. Brief, pp. 23-24).
The Secretary also notes that Exhibit RX-E, which Daisy submitted to
demonstrate that it inspected its work sites for safety hazards, was insufficient.
Exhibit RX-E contains four documents entitled “Safety Compliance Inspection
Weekly Summary Report.” The reports summarize the site inspections Mr. Stepp
performed during April 2010. Only two of the inspections relate to the subject
project. Those inspections took place on April 12 and 13, 2010. (S. Brief, pp. 24-
25). The Court agrees with the Secretary. The subject project was a three-year
undertaking, and it involved an area about 2.25 miles long. (Tr. 32, 178). The offer
of documents that show only two inspections of such an extensive project is simply
inadequate to establish effective monitoring of the project for trenching safety
hazards. Put another way, in this case, two site visits do not constitute a diligent
effort to discover violations.29
In regard to whether Daisy enforced its safety rules when violations were
detected, the Secretary contends that Daisy did not. She asserts that Daisy’s failure
to effectively enforce its trench safety rules is most readily apparent by the fact that
two Daisy supervisors did not follow those rules at the subject work site. Again, the
Court agrees. As set out previously, “negligent behavior by a supervisor or foreman
which results in dangerous risks to employees under his or her supervision … raises
an inference of lax enforcement and/or communication of the employer’s safety
policy.” Danis-Shook Joint Venture XXV, 319 F.3d at 811. (S. Brief, pp. 25-27).
Finally, the Secretary points out that there is no evidence that Daisy had
implemented a disciplinary program to deal with violations of its safety rules. She
notes that an employer may show effective enforcement of its rules where it has a
progressive disciplinary program and where it has actually administered and
consistently enforced the discipline set out in its policy. See, e.g., Pace Constr.
29
See Reynolds, Inc., 19 BNA OSHC 1653, 1656-57 (No. 00-0982, 2001) (finding insufficient evidence to
establish that employer attempted to discover violations at a year-long project involving 20 employees,
even though there were three safety audits, because there was no other evidence of a more frequent effort to
oversee the safe operations of the project).
Co., 14 BNA OSHC 2216, 2217-20 (No. 86-758, 1991). (S. Brief, p. 27). Exhibit
RX-A, discussed above, shows Mr. Drake was suspended and then terminated for
his failure to provide adequate protection for the employees working in the trench.
But, as the Secretary notes, disciplinary action after an OSHA inspection or citation
is only relevant when viewed in conjunction with pre-citation disciplinary action.
See, e.g., McGuire & Bennet, Inc., 15 BNA OSHC 1878, 1878-79 (No. 91-0312,
1992). (S. Brief, pp. 27-28). Here, there is no evidence that shows that Daisy even
had a disciplinary policy or that it had ever before issued any disciplinary notices to
employees or supervisors for violations of company safety rules. For this reason,
and for all of the reasons discussed herein, the Court concludes that there is
insufficient evidence to demonstrate that Daisy undertook reasonable precautions to
prevent the trenching violation in this case. The evidence shows that Daisy failed
to: 1) adequately communicate its work rule, 2) take sufficient steps to discover
violations, and 3) effectively enforce its work rules. The Secretary has thus met her
burden of proof in regard to showing the alleged violations of 29 C.F.R. §§
1926.652(a)(1) and 1926.651(k)(1).
Whether the Violations were Willful
The above-noted violations have been characterized as willful.30 (Tr. 150-
51). As the Secretary notes, a violation is willful if committed “… with intentional,
knowing or voluntary disregard for the requirements of the Act, or with plain
indifference to employee safety.” Valdak Corp., 17 BNA OSHC 1135, 1136 (No.
30
AD Salvatore testified about the reasons the violations were classified as willful, including a citation
issued on September 4, 2008 for not providing an adequate protective system in accordance with 29 C.F.R.
§ 1926.652(a)(1) for employees working in an excavation at the subject project site. (Tr. 150-54; JX-1, ¶¶
11-12, CX-14 through CX-15).
93-239, 1995, aff’d, 73 F.3d 1466 (8th Cir. 1996); Falcon Steel Co., 16 BNA
OSHC 1179, 1181 (Nos. 89-2883 & 89-3444, 1993). A willful violation is
differentiated by heightened awareness of the illegality of the cited condition and
by a state of mind of conscious disregard or plain indifference. Hern Iron Works,
Inc., 16 BNA OSHC 1206, 1214 (No. 89-433, 1993) (citing Williams Enters., 13
BNA OSHC 1249, 1256-57, (No. 85-355, 1987)).31 (S. Brief, p. 10).
As the Secretary indicates, Daisy was well aware of OSHA’s excavations
standard. Daisy has been in business for 39 years. Its business involves road and
highway construction and includes sewer and water line construction. (Tr. 124;
GX-3, p. 9). Daisy’s safety manual contains a section on trenching and excavation
which references OSHA’s excavations standard. See RX-C. Daisy has trench boxes
of varying sizes and other equipment to protect employees who work in trenches.
(Tr. 86-88). The company has used trench boxes on prior jobs, and it used trench
boxes at times on the subject project. (Tr. 181; GX-8, p. 4; S. Brief, pp. 10-11).
As set out previously, Messrs. DelSignore and Drake were competent
persons in trenching and excavation work. Both had 30 years of construction
experience, and both had attended the OSHA 10-hour course in construction. That
course included trenching and excavation. (Tr. 65-68, 82-84, 191, 206-08). Mr.
DelSignore testified that he was familiar with Daisy’s safety manual, which covers
trenching and excavation. (Tr. 207-08). The Court agrees with the Secretary that, in
view of the type of work the company performs and the training, experience and
31
See also V.I.P. Structures, Inc., 16 BNA OSHC 1873, 1875 (No. 91–1167, 1994) (“Willful conduct by
an employee in a supervisory capacity constitutes a prima facie case of willfulness against his or her
employer unless the supervisory employee’s misconduct was unpreventable”).
knowledge of Messrs. DelSignore and Drake, Daisy had a heightened awareness of
the OSHA standards cited in this case. See Fiore Constr. Co., Inc., 19 BNA OSHC
1408, 1409 (No. 99-1217, 2001) (affirming willful violation where foreman had a
heightened awareness of the requirements of § 1926.652(a)(1) based upon his 12
years of excavation work experience, completion of a 40-hour OSHA excavation
course, and his testimony that he knew OSHA’s standards required him to use a
trench box). (S. Brief, p. 11).
Another basis for finding heightened awareness is the fact that Daisy was
previously cited in 2008 for a violation of 29 C.F.R. § 1926.652(a)(1) at the same
project at issue here.32 That citation became a final order of the Commission on
December 8, 2008. (GX-14, p.1, GX-15, JX-I, ¶¶ 11-12; S. Brief, p. 12).
The Court further agrees with the Secretary that the actions of Messrs.
DelSignore and Drake on April 29, 2010, show Daisy’s conscious disregard of the
cited OSHA standards and its own safety manual, as well as plain indifference to
employee safety.33 (S. Brief, pp. 12-19). The cave-in hazard was in plain view and
32
See Reynolds, Inc., 21 BNA OSHC 1581, 1590 (No. 05-0023, 2006) (finding heightened awareness of
the need for cave-in protection based on history of prior citations involving § 1926.652(a)(1) and
knowledge that excavation was 5 feet deep, walls were vertical, and fact that a trench box was on site, but
was not used). See also Lanzo Constr. Co., Inc., 20 BNA OSHC 1641, 1649 (No. 97-1821, 2004) (finding
willful violation of § 1926.652(a)(1) where employer had a heightened awareness of the requirements of
the standard in that its safety manual incorporated the excavation standard and its superintendent admitted
that a trench box was used at another site because of a previous citation). S. Brief, p. 11; Reynolds, Inc., 19
BNA OSHC at 1657 (finding willful classification appropriate based in part upon fact that employer had
been previously cited for violations of § 1926.652(a)(1)). A prior citation for the same standard is proof of
the employer’s intentional disregard of or plain indifference to its safety obligations under the Act. Id.
33
See Butch Thompson Enters., Inc., 22 BNA OSHC at 1992-94 (violation of § 1926.652(a)(1) was willful
where two of employer’s competent persons knew trench was 13 feet deep, had vertical walls, and was dug
in previously disturbed Type C soil next to a busy roadway, but yet allowed employees to enter the trench);
B.S. Carter Constr., Inc., 21 BNA OSHC 2073, 2077 (No. 06-0343, 2006) (finding plain indifference to
support a willful trenching violation where employer knew the trench lacked cave-in protection, had been
in the excavation business for 30 years, and was cited before for a violation of 29 C.F.R. § 1926.652(a)(1)
under very similar circumstances). (S. Brief, p. 17).
was open and obvious.34 The CO’s testimony establishes the depth of the trench
and its hazardous condition (i.e., it was 7 to 8 feet deep, had vertical walls and
previously-disturbed soil, and was located next to a busy intersection).35 Mr.
Drake’s testimony establishes the essential facts of what occurred on the morning
of April 29, 2010. In particular, the digging of the trench began around 8:00 a.m.
Mr. Drake was present during that activity, and Mr. DelSignore was there for at
least part of the digging work. At about 9:00 a.m., Mr. DelSignore told Mr. Drake
to get a trench box, and Mr. Drake did so. Mr. Drake then went to get a ladder.
When he got back, employees were already working in the trench, Mr. DelSignore
was standing nearby, and the trench box was not being used. Messrs. DelSignore
and Drake did not discuss the trench box. And, while Mr. DelSignore was at the
trench site off and on during the three-hour period employees were in the trench, he
never told Mr. Drake to use the trench box or to have the employees exit the trench.
(Tr. 68-82). In fact, as specifically found previously, Mr. DelSignore had the
employees enter the trench while Mr. Drake was off looking for a ladder. As also
found previously, Messrs. DelSignore and Drake were aware by direct observation
that employees were working in the unprotected trench, and neither took the
necessary safety measures to protect the employees from a cave-in.36
The Secretary cites to a number of cases in support of her contention that
the violations were willful. The Court finds two of these cases to be particularly
34
See Boring & Tunneling Co. of Am., Inc., No. 80-2571, 19 WL 18996, at *7 (O.S.H.R.C.A.L.J. June 29,
1981) (finding that violation of 29 C.F.R. § 1926.652(b) for failure to protect trench that was 24 feet long, 9
feet 6 inches wide, and 20 feet deep, was an open and obvious hazard).
35
Mr. Cannon described the soil as sandy. (Tr. 45).
36
Mr. Drake testified that he had previously seen Daisy employees working in unprotected trenches before
April 29. (Tr. 80-81).
significant.37 In one, the Commission upheld the judge’s willful classification; the
foreman had been trained as a competent person to identify trenching hazards, and
he knew the condition violated OSHA standards, but decided to remove the trench
boxes and send employees into the unprotected trench. Rawson Contractors, Inc.,
20 BNA OSHC 1078, 1081-82 (No. 99-0018, 2003). (S. Brief, p. 16). In the other,
the Seventh Circuit upheld the Commission’s final order that adopted the judge’s
finding of a willful violation; the competent person allowed employees to work in
an unprotected trench that was 10 to 11 feet deep, had vertical walls, and was in
Type B and Type C soil. Globe Contractors, Inc. v. Herman, 132 F.3d 367, 372-73
(7th Cir. 1997). (S. Brief, p. 18). On the basis of the evidence of record, the
violations of the cited standards are affirmed as willful.
Penalty Determination
The Secretary has proposed a grouped penalty of $63,000.00 for Items 1a
and 1b of Willful Citation 2. In assessing penalties, the Commission must give due
consideration to the gravity of the violation and to the size, history and good faith
of the employer. See section 17(j) of the Act, 29 U.S.C. § 666(j). Gravity is
generally the primary factor to consider. Orion Constr., Inc., 18 BNA OSHC 1867
(No. 98-2014, 1999).
AD Salvatore issued the citations in this case. He testified that he reviewed
the investigative file and followed the procedures in OSHA’s Field Operations
Manual to arrive at the proposed penalty of $63,000.00. He considered the
37
See also DeWitt Excavating, Inc., No. 10-1515, 2011 WL 3394941, at *9-10 (O.S.H.R.C.A.L.J. June 1,
2011) (willful violation of § 1926.652(a)(1) was established where employer was in excavation business
since 1954, its superintendent and foreman were competent persons who knew the trench needed cave-in
protection (it had vertical walls and was over five feet deep, was located next to a busy roadway, and was
dug in previously disturbed Type-C soil), and the company was cited before for a similar violation.
violations to have high severity. At least one employee was working in the trench
for several hours. If a cave-in had occurred it would likely have resulted in long-
term incapacitation or death. He considered the probability of harm to be greater.
The trench was over 5 feet deep, and it was composed of previously disturbed,
Type C soil. The AD noted that a willful violation with high severity and greater
probability results in an unadjusted penalty of $70,000.00. (Tr. 127-29, 149-50,
154-61; CX-1 through CX-3, CX-16).
AD Salvatore also testified about the adjustments that were made. He
determined that Daisy was entitled to a 10 percent reduction due to its size (about
150 employees).38 Daisy was not entitled to reductions for history or good faith,
however, because the violations were classified as willful. The resulting adjusted
penalty was $63,000.00. The AD noted that the penalties for Items 1a and 1b were
grouped, since the violations were related. (Tr. 161-65; JX-1, CX-3, CX-16).
The Court finds that the full 20 percent reduction normally applied for an
employer of Daisy’s size is appropriate. The Court notes that Mr. Booth testified
that, despite this instance, Daisy always used a trench box where needed. He also
testified that Daisy had not experienced a trench cave-in. He said that no Daisy
worker had experienced a life threatening injury, or died on the job. (Tr. 181-82).
The Court concludes that a substantial penalty for the willful items is appropriate,
especially in light of the hazardous condition of the trench and the likelihood of serious
injury or death if a cave-in had occurred. The Court finds it appropriate to reduce the
38
The AD said that the 20 percent reduction normally available for an employer of Daisy’s size was
reduced to 10 percent because of the gravity of the violation and its willful classification. (Tr. 162).
$63,000.00 penalty proposed by the Secretary to $56,000.00. A penalty of $56,000.00 is
assessed by the Court for these willful items.39
Serious Citation 1, Item 1
This item alleges a violation of 29 C.F.R. § 1926.21(b)(2), for Daisy’s
failure to instruct employees in the recognition and avoidance of unsafe conditions
relating to trenching and excavation work. The cited standard states as follows:
The employer shall instruct each employee in the recognition and
avoidance of unsafe conditions and the regulations applicable to his work
environment to control or eliminate any hazards or other exposure to
illness or injury.
The parties have stipulated that the cited standard applies. (JX-I, ¶ 15). As to the
second and third elements of the Secretary’s burden of proof, the Court finds that the
terms of the standard were not met and that employees were exposed to the cited hazard.
CO Kessler testified that when he spoke to them, Messrs. Moore and King both told him
that they had received no training from Daisy.40 (Tr. 112-15, 136; CX-3, CX 11, CX-12).
Mr. Moore plainly required training in the hazards of working in trenches, as he was the
employee the CO saw in the trench. Mr. King also required training in trenching work, as
he was the individual who had excavated the trench. The Court further finds that Daisy
39
Ho, 20 BNA OSHC 1361, 1379 (No. 98-1645, 2003) (consolidated), overruled on other grounds by E.
Smalis Painting Co., 22 BNA OSHC 1553, 1581 (No. 94-1979, 2009) (Commission has discretion to assess
the penalties it finds appropriate).
40
Mr. Moore’s signed statement is Exhibit GX-11. It states that he had worked for Daisy for two years and
he had had no classes in trenching; his training was on-the-job experience. Mr. King’s signed statement is
GX-12. It states that he had worked for Daisy for five years and that he had had no training or classes from
Daisy.
either knew or should have known that it had not trained Mr. King as required.41 The
Secretary has met her burden of proving a violation of the cited standard.42
As with the willful violations, Daisy contends this violation was due to the
unpreventable employee misconduct of Mr. Drake, the foreman at the site. (R.
Brief, pp. 3, 5-6, 9-10). The Court has already found that Daisy did not show that it
had taken reasonable safety precautions to prevent the trenching violations in this
case. See PP&L, 737 F.2d at 358. In view of this finding, the Court concludes that
the record does not show that Daisy’s failure to adequately train Messrs. Moore and
King was caused by unpreventable employee misconduct.43 The alleged violation is
affirmed as serious, as it is clear that the failure to train employees in the hazards of
working in and around trenches could cause serious injuries or death. (Tr. 129-30).
The Secretary has proposed a penalty of $4,000.00 for this item. AD Salvatore
testified that he determined this item to have high severity and greater probability,
resulting in a gravity-based penalty of $5,000.00. A 20 percent reduction was applied,
based on the company’s size, but no reductions were given for history or good faith. (Tr.
165-67; CX-3, CX-16). The Court finds it appropriate to reduce the proposed $4,000.00
penalty to $3,000.00. A penalty of $3,000.00 is assessed by the Court for this item.44
41
Daisy was cited in June 2007 for violating the same standard. (Tr. 126; CX-1, p.5)
42
See Revoli Constr. Co., Inc., 23 BNA OSHC 1697 (No. 10-0699, 2011) (finding that violation of §
1926.21(b)(2) established where record failed to demonstrate specific employee training in the recognition
and avoidance of unsafe conditions).
43
This conclusion is supported by the fact that Daisy was previously cited for violating 29 C.F.R. §
1926.21(b)(2) in 2007, which was before Mr. Drake began working for Daisy. (Tr. 65, 126; GX-3, p. 1).
44
See Ho, 20 BNA OSHC at 1379. The penalty reduction results from the Court being mindful that the
record includes a sign-in sheet reflecting Mr. Moore’s signature at a safety meeting on “Trenching Safety”
conducted by Mr. Stepp on April 2, 2010. (RX-D, at p. 4). This sheet, by itself, is insufficient to show that
Mr. Moore was adequately trained in the hazards of working in and around trenches; especially in light of
his testimony to the contrary.
Findings of Fact and Conclusions of Law
The foregoing decision constitutes the findings of fact and conclusions of
law in accordance with Federal Rule of Civil Procedure 52(a).
ORDER
1. Item 1 of Serious Citation 1, alleging a violation of 29 C.F.R. §
1926.21(b)(2), is AFFIRMED, and a penalty of $3,000.00 is assessed.
2. Items 1a and 1b of Willful Citation 2, alleging violations of 29 C.F.R. §§
1926.652(a)(1) and 1926.651(k)(2), respectively, are AFFIRMED, and a penalty of
$56,000.00 is assessed.
__/s/___________________________
The Honorable Dennis L. Phillips
U.S. OSHRC Judge
Date: January 13, 2012
Washington, D.C.