🧪 TEST MODE ACTIVE Use test card: 4242 4242 4242 4242
OSHRC ALJ decision Docket 10-0617 Decided March 3, 2011 Citations vacated Judge Patrick B. Augustine

Diversified Maintenance Systems

Medical-response planning citation vacated

Apply this to your situation

This order from 2011 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current OSHA standards and Commission precedent, with citations.

Currency note: this decision dates from 2011
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final order, not Commission precedent
This decision by an OSHRC Administrative Law Judge became a final order of the Commission because no Commissioner directed review (29 U.S.C. § 661(j)). It binds the parties but is not binding precedent in other cases. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

OSHA cited Diversified Maintenance because its only onsite employee's first-aid and CPR certifications had expired. The judge held that OSHA cited the planning requirement in § 1926.50(b), not the separate certification requirement in § 1926.50(c). Before work began, the company had identified an onsite first-aid kit, a medical infirmary about fifty feet away, a nearby fire station, and a hospital four to seven minutes away. Those arrangements satisfied the cited requirement to make advance provision for prompt medical attention, so the citation was vacated.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1926.50(b)
  • Outcome: The other-than-serious citation was vacated; no penalty had been proposed.
  • Key point: OSHA must prove noncompliance with the provision actually cited; expired first-aid certifications did not establish a failure to plan for prompt medical attention under § 1926.50(b).

Full text (OSHRC public release)

                       UNITED STATES OF AMERICA
           OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION

Secretary of Labor,

                        Complainant,
                                                            OSHRC DOCKET NO. 10-0617
                                v.

Diversified Maintenance Systems,

                        Respondent.

Appearances:

    Abigail Daquiz, Esq., Office of the Solicitor, U.S. Department of Labor, Seattle, Washington
             For Complainant

    Timothy Miguel Willardson, Esq., Diversified Maintenance Systems, Salt Lake City, Utah
            For Respondent

Before: Administrative Law Judge Patrick B. Augustine

                                        DECISION AND ORDER

                                             Procedural History

    This proceeding is before the Occupational Safety and Health Review Commission ("the

Commission") pursuant to Section 10(c) of the Occupational Safety and Health Act of 1970, 29 U.S.C.

§651 et seq. ("the Act"). The Occupational Safety and Health Administration ("OSHA") conducted an

inspection of a Diversified Maintenance Systems ("Respondent") worksite in Portland, Oregon on January

15, 2010. As a result of that inspection, OSHA issued a Citation and Notification of Penalty to

Respondent alleging one violation of the Act. Citation 1 Item 1 alleges an other-than-serious violation of

29 C.F.R. §1926.50(b) with no proposed penalty. Respondent timely contested the citation and a trial was

conducted on August 27, 2010 in Portland, Oregon. Both parties submitted timely post-trial briefs.
Jurisdiction

    Jurisdiction of this case is conferred upon the Commission pursuant to Section 10(c) of the Act. At

all times relevant to this action, Respondent was an employer engaged in a business affecting interstate

commerce within the meaning of Section 3(5) of the Act, 29 U.S.C. §652(5). Resp. Answer; Slinghuff v.

OSHRC, 425 F.3d 861 (10th Cir. 2005). Furthermore, because Oregon manages its own OSHA state plan,

it is important to note that Respondent was a Federal contractor engaged in construction on a Federal

military installation under Federal OSHA jurisdiction. (Tr. 8, 57).

                                         Applicable Law

   To establish a prima facie violation of a specific regulation promulgated under Section 5(a)(2) of

the Act, the Secretary must prove by a preponderance of the evidence that: (1) the cited standard applied to

the condition; (2) the terms of the standard were violated; (3) one or more employees had access to the

cited condition; and (4) the employer knew, or with the exercise of reasonable diligence could have known,

of the violative condition. Astra Pharmaceutical Products, 9 BNA OSHC 2126, 1981 CCH OSHD

&25,578 (No. 78-6247, 1981).

                                           Stipulations

   The parties stipulated to the following facts:

 Diversified Maintenance Systems was the general contract contractor for the contract at issue;

 The work site at issue had an address of 6767 North Basin Avenue, Portland, Oregon;

 American Heating, Inc. was retained by Diversified Maintenance Systems as a subcontractor;

 Frank Dallas was the only employee of Diversified Maintenance Systems on the work site;

 Frank Dallas has been trained in CPR and First Aid;

 At the time of the inspection, Frank Dallas did not have a current certification in CPR;

 At the time of the inspection, Frank Dallas did not have a current certification in First Aid; and

 The Accident Prevention Program (C-3) is a plan prepared by DMS to govern accident prevention

                                                 2

on the subject contract.

    In addition, Respondent admitted to the following allegations in its Answer to the Complaint:1

   Respondent, Diversified Maintenance Systems, at all times material hereto, engaged in business in

    Portland, OR;

   Respondent was at all times material hereto engaged in the business of construction at a worksite

    and place of business and employment at 6767 N. Basin Ave., Portland, OR 97217-3929

    (hereinafter, the “worksite”) on the date of the alleged violations, January 15, 2010, and at times

    prior thereto. At all times material hereto, Respondent is and was engaged in the use of materials,

    machinery, and other goods brought directly or indirectly to Respondent from points outside the

    State of Oregon and also utilized mails, telephone, and other facilities of interstate commerce.

    Therefore, the Respondent was and is engaged in a business affecting commerce within the meaning

    of §3(5) of the Act, 29 U.S.C. §652(5), as amended on September 28, 1999;

   The Secretary of Labor, pursuant to the authority vested by §6 of the Act, duly issued and

    promulgated the Occupational Safety and Health Standards for general industry (29 C.F.R. Part

    1910). The Secretary, pursuant to the authority vested by §6 of the Act, duly issued and

    promulgated the Safety and Health Regulations for Construction (29 C.F.R. Part 1926);

   No penalty has been proposed for the violation alleged in Citation Number 1;

   Respondent filed a timely notice of contest with a representative of the Secretary of Labor, which

    was duly transmitted to the Occupational Safety and Health Review Commission. By its terms, the

    notice of contest contests the citation.

1 By Order dated May 21, 2010, this matter was designated to proceed under the Commission’s Conventional Proceeding rules
by the Chief Administrative Law Judge. By Order dated July 29, 2010, the undersigned designated the case to proceed under
the Commission’s Simplified Proceeding rules.

                                                        3

Additional Findings of Fact

    Four witnesses testified at trial: Troy Rose, a Pipe Fitter employed by American Heating (an on-

site subcontractor); Alex Bedard, OSHA Compliance Safety and Health Officer (“CSHO”); Jeff Sevrin,

Respondent’s General Manager, and Frank Dallas, Respondent’s on-site Superintendent. (Tr. 16, 25, 54).

Based on their testimony and the evidentiary exhibits received in evidence, the court makes the following

additional findings:

   Respondent was the General Contractor on a jobsite located on the Swan Island U.S. Coast Guard

Station in Portland, Oregon in January 2010. (Tr. 17-18, 35, 40, 57). CSHO Bedard was assigned to

perform a programmed OSHA inspection of this jobsite on January 15, 2010. (Tr. 30-31). Frank Dallas,

Respondent’s on-site Superintendent, was Respondent’s only employee working at the location during the

inspection. (Tr. 18, 33). The project consisted of HVAC system remodeling and window replacements for

an existing building. (Tr. 31). To complete the project, some demolition work also needed to be

performed. (Tr. 18, 31). Employees of one of the subcontractors, American Heating, were performing

demolition work on the day of the inspection using Sawzall saws, torches, ladders, and other various hand

tools. (Tr. 18-19, 21, 36).

   Respondent’s General Manager Jeff Sevrin, who helped plan this particular project, anticipated their

response to serious employee injuries that might occur at this site through subcontractor orientations led by

Respondent’s on-site Superintendent, which would include the locations of a First Aid kit, a nearby medical

infirmary, and the closest hospital. (Tr. 52). Superintendent Dallas, who also helped plan this project, knew

before the project began that: (1) the building being renovated originally contained a medical infirmary

which was being temporarily relocated to the building next door during the construction, (2) there was a

fire station approximately three quarters of a mile away from the construction site, (3) there was a hospital

a few minutes away from the construction site, and (4) a First Aid kit would always be available at the site.

(Tr. 56, 58-59, 61, 64). Troy Rose, an employee of one of the on-site subcontractors, confirmed that

                                                 4

Superintendent Dallas provided his crew with an orientation, which included information concerning the

location of a First Aid kit and the location of an infirmary in the building next door to the worksite. (Tr.

23).

   CSHO Bedard acknowledged that there was both a fire station nearby and a hospital four to seven

minutes away, but he “wasn’t sure if [Frank Dallas] knew about that one.” (Tr. 33, 35, 40). CSHO Bedard

did not know at the time of his inspection that there was a medical infirmary located in the building next

door. (Tr. 42).

   Respondent’s Accident Prevention Program requires that at least two employees on each shift be

qualified and certified to administer First Aid and CPR. (Tr. 36-37; Ex. C-3). Although his certifications

had lapsed, Superintendent Dallas testified that he had the ability to provide basic First Aid treatment and

CPR, if necessary, at the time of the inspection. (Tr. 68-69). If a serious injury had occurred, he would

have taken the injured employee(s) to the infirmary located approximately fifty feet from the worksite. (Tr.

59, 64).

   In not proposing a monetary penalty for the alleged violation, CSHO Bedard considered that

Superintendent Dallas had been trained in First Aid and CPR, but had simply allowed his certifications to

lapse. (Tr. 38). He testified that the condition would “not cause immediate harm or injury to employees.”

(Tr. 38).

                                                 5

Citation 1 Item 1

    Complainant alleges that the Respondent violated the Act as follows:

          29 CFR 1926.50(b): Provisions were not made prior to commencement of
          the project for prompt medical attention in case of serious injury: U.S.
          Coast Guard base, Portland, Oregon - (a) the employer was unaware, at
          the time of the inspection, of a first aid facility, nor were any employees
          current with CPR or First Aid training.

    The cited regulation provides:

          29 CFR 1926.50(b): Provisions shall be made prior to commencement of
          the project for prompt medical attention in case of serious injury.


    Respondent does not dispute that it was engaged in construction work at this project. (Resp.

Answer). The cited regulation identifies medical response considerations that must be undertaken at the

planning stage of construction projects. Therefore, the court finds that the cited standard applied to the

condition.

    In terms of violating the requirements of the cited standard, Complainant’s evidence focused heavily

on Superintendent Dallas’s lack of current certifications in First Aid and CPR. In fact, Complainant’s

counsel described the primary issue in the case as being whether or not Respondent complied with its own

medical response plan, and more specifically, Respondent’s requirement that at least two of its onsite

employees have current First Aid and CPR certifications. (Tr. 11-12). However, as Respondent’s counsel

correctly pointed out, Complainant alleged a violation of §1926.50(b), rather than §1926.50(c). 29 C.F.R.

§1926.50(c) articulates the requirement to have an employee with “a valid certificate in First Aid training”

present when medical facilities are not reasonably accessible. The regulation cited in this case, §1926.50(b),

addresses only whether or not Respondent, at the planning stage for this project, made “provisions...for

prompt medical attention in case of serious injury.”

                                                   6

The court finds that both General Manager Sevrin and Superintendent Dallas, at the planning stage

of this project, addressed Respondent’s anticipated response to medical emergencies by obtaining pre-project

awareness that: (1) a First Aid kit would be present at the site, (2) a medical infirmary was located fifty feet

away in the next building, (3) a fire station was located three quarters of a mile from the site, and (4) a

hospital was located approximately four to seven minutes from the site. Consequently, Complainant failed to

establish that Respondent violated the terms of the cited regulation. Citation 1 Item 1 will be vacated.

                                               ORDER

     Based upon the foregoing Findings of Fact and Conclusions of Law, it is ORDERED that Citation 1

Item 1 is hereby VACATED.

                                             ___/s/_________________________________
                                             PATRICK B. AUGUSTINE
                                             Judge, OSHRC

Date: January 17, 2011
Denver, Colorado

                                                   7

Get today's answer for your situation

You just read what one judge decided for one employer in 2011, and it binds only those parties. Ezel checks the current OSHA standards and Commission precedent and answers your specific situation, with citations.

Opens in Ezel Pro. Every answer cites the authority it relies on.